BLD-Framing/Rough-in | 6/23/2014 | 6/24/2014 | 6/24/2014 | A | NR |
Dave Hannah
|
|
|
Spittle Phone #: ###-####
|
BLD-Framing/Rough-in | 4/30/2014 | 5/1/2014 | 5/1/2014 | P | PART |
Jim Sly
|
|
|
Jim Phone #: ###-#### Floor framing inspection and R-30 insulation installed in flooor OK. Note: layer of rock and layer of 1/4" fiber cement board installed underneath floor. (WUI).
|
Routing Walk-In (BLD) | 4/28/2014 | 4/28/2014 | 4/28/2014 | P | PASS |
Perry Paine
|
|
|
WUI questions
|
BLD-Footing | 4/11/2014 | 4/14/2014 | 4/14/2014 | A | PASS |
Dave Hannah
|
|
|
Jim Phone #: ###-####
|
PubWorks Subgrade Approval | 4/4/2014 | 4/4/2014 | 4/4/2014 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
Application received | | 2/13/2014 | 2/13/2014 | | DONE |
|
|
|
|
Routing Walk-In (PW Hillside) | 2/13/2014 | 2/13/2014 | 2/13/2014 | A | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Routing Walk-In (Zoning) | 2/13/2014 | 2/13/2014 | 2/13/2014 | A | DONE |
Leon Letson
|
|
|
|
Routing Walk-In (BLD) | 2/13/2014 | 2/13/2014 | 2/13/2014 | A | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 2/13/2014 | 2/13/2014 | 2/13/2014 | | PASS |
Perry Paine
|
|
|
|
Inspection Record Card- Bld | | | 2/13/2014 | | |
|
|
|
|
1st review completed | | | 2/13/2014 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/13/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/13/2014 | | DONE |
Tisha Gallop
|
|
|
|
Issue PAID IN FULL permit | | | 2/13/2014 | | DONE |
|
|
|
|