Permit Information
Permit NumberBLD14-00321
StatusFinaled
Name BLUE RIDGE CONSTRUCTION
Site Address 10221 W EMERALD ST
Project NameDepartment of Corrections
Customer Number 
ePlanReviewYes
Description
(DEPARTMENT OF CORRECTIONS) Fire sprinklers used for building area increase. To remodel an existing 18,234 square foot tenant space located within an existing 18,688 square foot building for a new office tenant. Work is to include new 2 restrooms accessible to the disabled, interior nonbearing walls, suspended ceilings, new exterior windows, new exterior doors, new exterior wall infills, new interior doors, new interior windows, suspended acoustical ceilings, and interior finishes. Existing restrooms are required to be maintained accessible to the disabled. Structural work includes installing columns at new exterior openings to resist out-of-plane loads and changes to the roof structure to support new roof top HVAC equipment. Special Inspection is required for welding and for epoxy anchors installed in concrete. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 11/15/201411/19/2014 DONE
DetailsChristina Prado
Print Statement  11/19/2014 DONE
DetailsChristina Prado
Third Notice 10/11/201411/10/2014 DONE
mailed to Blue Ridge Const
Third Notice 8/31/201410/6/2014 DONE
mailed to Blue Ridge Const
Second Notice 7/25/20148/26/2014 DONE
First Notice 6/8/20147/15/2014 DONE
Faxed 7-15-14
Plan Reviewer's activity  6/27/2014 DONE
Talked to Alex about how to handle the submission of revised drawings. Carl Westfall thought the revised drawings could be treated as a plan modification, not realizing that this permit had already been finaled. It was decided that an new permit and workflow is required.
BLD-Final5/28/20145/29/20145/29/2014ACANC
DetailsMike Jordan
Larry Phone #: ###-####
BLD-Final5/28/20145/29/20145/29/2014APASS
DetailsMike Jordan
Larry Phone #: ###-####. Ok for perm occ.
Permanent Occupancy  5/29/2014 DONE
DetailsChristina Prado
BLD-Final5/27/20145/28/20145/28/2014PDEFR
DetailsJim Storey
Larry Phone #: ###-#### 450
FIRE-Final Inspection5/27/20145/28/20145/28/2014APASS
DetailsTroy Cobbley
Life safety passed. Panic only hardware is to be installed on door from Lobby to back offices per Carl Westfall.
FIRE-Final Inspection5/23/20145/27/20145/27/2014PFAIL
DetailsTroy Cobbley
Project was not ready for a final yet. Scott Arellano and I discussed the two gates on the west side of the bulding and scott ultimately approved their location and width. Fire sprinkler permit is complete. Per Carl Westfall no locking mechanisam can impede exiting so a delay locks can not be installed. They can only sound an alarm upon unauthorized access.
Zoning Approval5/27/20145/27/20145/27/2014 DONE
DetailsSarah Schafer
FIRE-Final Inspection5/22/20145/22/20145/22/2014PFAIL
DetailsTroy Cobbley
inspection was actually for a conference. Larry and I went over exit sign placement and occupant load sign requirements.
BLD-Ceiling Grid Inspection5/21/20145/22/20145/22/2014APASS
DetailsMike Jordan
Larry Phone #: ###-####
BLD-Energy code compliance4/22/20144/23/20144/23/2014APASS
DetailsMike Jordan
Larry-please do late am & call 15 minutes prior Phone #: ###-####
BLD-Framing/Rough-in4/21/20144/22/20144/22/2014APASS
DetailsMike Jordan
Larry-Please call prior to inspectio Phone #: ###-####. Interior steel stud walls at existing warehouse area OK.
BLD-Ceiling Grid Inspection4/10/20144/11/20144/11/2014APASS
DetailsMike Jordan
Larry-Please call at least 30 mins prior to inspection Phone #: ###-####. Hardlids in existing area ok to cover.
BLD-Framing/Rough-in4/8/20144/9/20144/9/2014PPASS
DetailsMike Jordan
Larry Phone #: ###-####. Interior steel stud walls and infill at existing portion of building. ok.
Permit Ready to Issue  3/21/2014 DONE
Issue PAID IN FULL permit  3/21/2014  
Print Occupancy Form  3/21/2014 DONE
Plan assigned to (CJW)2/18/20142/18/20143/20/2014 PASS
DetailsCarl Westfall
DEPARTMENT OF CORRECTIONS - Level 3 TI - (20 days - March 13)
PLANS/APPL TAKEN TO FRONT DESK  3/20/2014 DONE
Routing - PLAN CHECK3/14/2014 3/18/2014 PASS
DetailsCarl Westfall
Drawings approved with "red lines" after the resubmittal review.
Routing - FIRE3/18/2014 3/18/2014 PASS
DetailsCraig D. Hanson
Plan resubmittals received  3/14/2014 DONE
Resubmitted late Friday night (i.e. 8:14 PM)
Plan resubmittals requested  3/6/2014 DONE
1st review completed  3/6/2014 DONE
Failed Building
Routing - PLAN CHECK2/18/2014 3/6/2014 FAIL
DetailsCarl Westfall
Revised drawings required. See the plan review report.
Routing - FIRE2/18/20142/18/20143/3/2014 PASS
DetailsScott Arellano
See Fire Plan Report
Routing - PLUMBING2/18/2014 2/19/2014 PASS
DetailsBill VanDegrift
No review required.
Routing - Design Review2/18/2014 2/19/2014 PASS
DetailsSarah Schafer
Sarah Schafer - Some new exterior windows and doors.
Routing PW Sewer Rating2/18/2014 2/18/2014 PASS
DetailsConnie Baumgartner
Routing - Addressing2/18/2014 2/18/2014 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS2/18/2014 2/18/2014 PASS
DetailsBeverly Mountain
Pending Assignment by JCB2/18/2014 2/18/2014 DONE
DetailsJason Blais
Application received  2/14/2014 DONE
Application submitted via PDS Online on Feb 14 2014 10:21AM
Intake Approval  2/14/2014 FAIL
DetailsTim L. Woodard
Resubmit as a Major TI. TLW
Intake Approval  2/14/2014 PASS
DetailsJason Blais
Prescreen approved by Tim Woodard and plan review fees paid.