Permit Information
Permit NumberBLD14-00384
StatusFinaled
Name PRECISION EXHAUST CLEANING CO
Site Address 350 N MILWAUKEE ST Unit: 2018
Project NameBTS - #2018
Customer Number 
ePlanReviewYes
Description
(OISHII JAPAN – BTS SPACE # 2018) Permit is to remodel an existing 650 square foot restaurant area in the food court area of the Boise Town Square Mall. This space was previously occupied by “Edo Japan” under BLD99-02754. Scope of work includes: new mechanical, new plumbing, new equipment, new accessible doors / hardware, new lighting, and new interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department, The smoke evacuation system shall remain operational as originally installed under the 1985 UBC. NOTE: a separate sign permit for interior mall signage is required before sign installation. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 9/3/20149/12/2014 DONE
DetailsChristina Prado
completed 9-12-14
Third Notice 7/14/20148/29/2014 DONE
mailed to Precision Exhaust
Second Notice 6/21/20147/9/2014 DONE
First Notice 5/17/20146/11/2014 DONE
Faxed 6-11-14
Permanent Occupancy  5/7/2014 DONE
DetailsChristina Prado
BLD-Final5/5/20145/6/20145/6/2014APASS
DetailsTom Arcoraci
john Phone #: ###-####
FIRE-Final Inspection5/6/20145/6/20145/6/2014PPASS
DetailsTroy Cobbley
life safety passed
BLD-Final5/2/20145/5/20145/5/2014PNR
DetailsMike Jordan
John Phone #: ###-####
FIRE-Final Inspection5/5/20145/5/20145/5/2014PFAIL
DetailsCraig D. Hanson
1. Range not in correct position yet.
2. Extinguishers not mounted
3. Sprinkler head obstructed
BLD-Framing/Rough-in5/2/20145/2/20145/2/2014PCANC
DetailsMike Jordan
John-Above ceiling Phone #: ###-####
BLD-Ceiling Grid Inspection5/2/20145/2/20145/2/2014PPASS
DetailsMike Jordan
John-Above ceiling Phone #: ###-####
BLD-Other5/1/20145/1/20145/1/2014PFAIL
DetailsMike Jordan
As late as possible please--Above ceiling mechanical inspection please--ROB Phone #: ###-####. No clips installed, electrical inspection above grid not completed.
BLD-Wall cover4/3/20144/4/20144/4/2014APASS
DetailsMike Jordan
please inspect framing Phone #: ###-#### >> Inspection requested via web by Roberts John
BLD-Framing/Rough-in4/3/20144/4/20144/4/2014APASS
DetailsMike Jordan
please inspect framing Phone #: ###-#### >> Inspection requested via web by Roberts John
Print Occupancy Form  3/20/2014 DONE
DetailsChristina Prado
Permit Ready to Issue  3/20/2014 DONE
DetailsChristina Prado
Issue PAID IN FULL permit  3/20/2014 DONE
Routing - MECHANICAL3/19/2014 3/19/2014 PASS
DetailsTroy James
1st review completed  3/19/2014 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  3/19/2014 DONE
DetailsTim L. Woodard
Plan assigned to (TLW)3/12/2014 3/19/2014 PASS
DetailsTim L. Woodard
oishii Japan (MALL)
Routing - PLAN CHECK3/12/2014 3/19/2014 PASS
DetailsTim L. Woodard
Routing - PLUMBING3/12/2014 3/13/2014 PASS
DetailsDaryl Spivey
RPBP required on cabonated beverage dispenser.
Routing - Addressing3/12/2014 3/12/2014 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS3/12/2014 3/12/2014 PASS
DetailsBeverly Mountain
Routing - MECHANICAL3/12/2014 3/12/2014 FAIL
DetailsTroy James
eplan see changemarks
Routing PW Sewer Rating3/12/2014 3/12/2014 PASS
DetailsConnie Baumgartner
Routing PW Environmental3/12/2014 3/12/2014 PASS
DetailsWalt Baumgartner
food court area tenants on common GI for complex, WBSD
Intake Approval  3/12/2014 PASS
DetailsAdele J Schaffeld-Griffin
Intake Approval  2/25/2014 FAIL
DetailsAdele J Schaffeld-Griffin
1. Please complete and upload the approval letter form the mall for this renovation.
2. Please complete and upload the 304 form.
3. Please complete and upload the 518 checklist.
4. Please re upload the sheets to read left to right.
5. Please re label the sheet names to meet the conventional naming as shown in the submittal standards.
6. Please provide the required stamping area shown on the submittal standards.
7. Please upload the Central District Health Department approval or application.
8. Please have all sheets shamped. The mechanical hood requires a mechanical engineer stamp the mechancial design.

Once this information is recieved I will begin the pre screen.

Thank you
Intake Approval  2/25/2014 FAIL
DetailsAdele J Schaffeld-Griffin
2/25/14 3:23 pm recieved back for pre screen with none of the items listed below completed. sent back to applicant. Will need all items addressed prior to begining pre screen. Please contact Alex at ###-#### if you have e plan questions. Thank you

1. Please complete and upload the approval letter form the mall for this renovation.
2. Please complete and upload the 304 form.
3. Please complete and upload the 518 checklist.
4. Please re upload the sheets to read left to right.
5. Please re label the sheet names to meet the conventional naming as shown in the submittal standards.
6. Please provide the required stamping area shown on the submittal standards.
7. Please upload the Central District Health Department approval or application.
8. Please have all sheets shamped. The mechanical hood requires a mechanical engineer stamp the mechancial design.

Once this information is recieved I will begin the pre screen.

Thank you
Application received  2/20/2014 DONE
Application submitted via PDS Online on Feb 20 2014 6:38PM