Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD14-00408
StatusFinaled
Name KC GARDNER RIVERWOODS LC
Site Address 101 S CAPITOL BLVD Unit: 1200
Project NameThe Gardner Company
Customer Number 
ePlanReviewYes
Description
*(GARDNER COMPANY)** (Suite 1200)Plan modification to include 4 additional offices and an open office space as shown revised plans. 4-30-14 ajs To remodel an existing 8186 sq ft office space located on the 12th floor per approved plans. The area of the entire 12th story is about 14,520 square feet. The area of the lobby is approximately 2,630 sq ft the lobby was upgraded under BLD07-02000. Work is to include, Minor demolition of interior partition wall between offices per plans to create a 2 conference rooms and 1 break room with no plumbing, minor infill of interior wall where a window is removed per plans and repair/replacement of ceiling grid as shown on approved plans. This building is fire sprinklered for high rise provisions. The restrooms were previously upgraded under Bld02-00731. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department.**ajs**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 6/21/20147/9/2014 DONE
First Notice 5/22/20146/11/2014 DONE
Mailed 6-11-14
BLD-Final5/12/20145/12/20145/12/2014PPASS
DetailsDave Hannah
Brad Phone #: ###-####
Permanent Occupancy  5/12/2014 DONE
DetailsChristina Prado
Plan assigned to (AJS)4/28/20144/28/20144/30/2014 PASS
DetailsAdele J Schaffeld-Griffin
plan modification
Routing - PLAN CHECK4/30/2014 4/30/2014 PASS
DetailsAdele J Schaffeld-Griffin
added additional existing office space to originally submitted square footage.
PLANS/APPL TAKEN TO FRONT DESK  4/30/2014 DONE
Permit Ready to Issue  4/30/2014 DONE
DetailsTisha Gallop
no fees for plan mod per AJS
CHANGE STATUS TO (ISS)  4/30/2014 DONE
DetailsTisha Gallop
no fees for plan mod per AJS
BLD-Final4/25/20144/28/20144/29/2014PPART
DetailsDave Hannah
Brad Smith Phone #: ###-#### ok for temp but they need to finish breakroom
FIRE-Final Inspection4/25/20144/28/20144/28/2014APASS
DetailsForrest France
Fire life safety passed.
FIRE-Final Inspection4/25/20144/25/20144/25/2014PPASS
DetailsForrest France
Fire life safety okayed for final. One exit sign to be relocated prior to structural final as discussed.
Plan Modification Accepted  4/3/2014 DONE
DetailsTisha Gallop
plan mod workflow stareted to incorporate additional area into tenant space
BLD-Final3/21/20143/21/20143/24/2014PPART
DetailsDave Hannah
brad - call 15 mins prior to meet - partial Phone #: ###-#### ok for temp
FIRE-Final Inspection3/20/20143/21/20143/21/2014APART
DetailsForrest France
FIRE-Final Inspection3/20/20143/21/20143/21/2014APART
DetailsForrest France
Project final pending completion of remodel work at the conference room and reception area. Remainder of office areas okayed. Exiting to be maintained as discussed.
FIRE-Final Inspection3/19/20143/20/20143/20/2014AFAIL
DetailsForrest France
Scope of work incomplete, remodel work will require modifications to the existing fire sprinkler system.
BLD-Framing/Rough-in3/13/20143/14/20143/14/2014PPASS
DetailsJim Sly
john Phone #: ###-####
Plan assigned to (AJS)2/27/20142/27/20143/7/2014 PASS
DetailsAdele J Schaffeld-Griffin
Due 3/12The Gardner Company
Routing - PLAN CHECK2/27/2014 3/7/2014 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed  3/7/2014 DONE
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  3/7/2014 DONE
Permit Ready to Issue  3/7/2014 DONE
DetailsTisha Gallop
Issue PAID IN FULL permit  3/7/2014 DONE
DetailsTisha Gallop
Print Occupancy Form  3/7/2014 DONE
DetailsTisha Gallop
Routing PW Sewer Rating2/27/2014 2/28/2014 PASS
DetailsConnie Baumgartner
Intake Approval  2/27/2014 PASS
DetailsAdele J Schaffeld-Griffin
Routing - PUBLIC WORKS2/27/2014 2/27/2014 PASS
DetailsBeverly Mountain
Routing - Addressing2/27/2014 2/27/2014 PASS
DetailsEmily Dixon
Application received  2/24/2014 DONE
Application submitted via PDS Online on Feb 24 2014 2:10PM