Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD14-00409
StatusFinaled
Name PERFORMANCE SYSTEMS INC
Site Address 11818 W JOPLIN RD
Project NameBlend Tank Replacement Project
Customer Number 
ePlanReviewYes
Description
Replace Sludge Blend Tank - To demolish and replace an exisitng Sludge Blend Tank. The new tank will be a bolted steel tank with an aluminum dome roof. The tank has an inside diameter of approximately 35 feet 8 inches and has a sidewall height of approximately 27 feet 9 inches. Both the tank and the roof will be eredted on site. The new tank will be constructed on top of the existing concrete foundation, with a new concrete curb connecting the base of the new tank shell or wall to the existing foundatoin system. All construction per the approved plans. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 9/2/20149/9/2014 DONE
DetailsChristina Prado
completed 9-9-14
Second Notice 7/25/20148/28/2014 DONE
First Notice6/6/20146/6/20147/15/2014 DONE
DetailsJim Sly
Faxed 7-15-14
BLD-Final6/5/20146/6/20146/6/2014APASS
DetailsJim Sly
Eli Phone #: ###-####
DOC - Permit Finaled6/6/20146/6/20146/6/2014PPASS
DetailsJim Sly
FIRE-Final Inspection6/5/20146/6/20146/6/2014APASS
DetailsTroy Cobbley
life safety passed
FIRE-Final Inspection6/5/20146/5/20146/5/2014PFAIL
DetailsTroy Cobbley
No inspection performed since city approved drawing not on site.
BLD-Final6/5/20146/5/20146/5/2014PNR
DetailsTom Arcoraci
call 1/2 hr before to meet // Eli Phone #: ###-#### need approved plans and spec insp final letter
BLD-Footing4/10/20144/11/20144/11/2014APART
DetailsJim Sly
Chuck Phone #: ###-####
Bottom Rim containment wall/footing........OK pending MTI special inspection, tests and approvals. Rick Cummings also inspecting progress.
OVERRIDE  3/11/2014  
Issue PAID IN FULL permit  3/11/2014 DONE
DetailsChristina Prado
Inspection Record Card- Bld  3/11/2014 DONE
DetailsChristina Prado
Permit Ready to Issue  3/11/2014 DONE
DetailsChristina Prado
1st review completed  3/5/2014 DONE
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  3/5/2014 DONE
DetailsJohn Menard
Plan assigned to (JCM)3/3/2014 3/5/2014 PASS
DetailsJohn Menard
Routing - PLAN CHECK3/3/2014 3/5/2014 PASS
DetailsJohn Menard
Reviewed structural and nonstructrual requirements. JCM
Routing - FIRE3/3/2014 3/5/2014 PASS
DetailsScott Arellano
No report
Routing PW Drainage3/3/2014 3/3/2014 PASS
DetailsBrian Murphy
Intake Approval  3/3/2014 PASS
DetailsJohn Menard
Drawings uploaded Feb. 27, 2014. Plan intake approval approved.
Pending Assignment by JCM3/3/2014 3/3/2014 DONE
DetailsJohn Menard
Routing - PUBLIC WORKS3/3/2014 3/3/2014 PASS
DetailsConnie Baumgartner
Routing - Erosion and Sediment3/3/2014 3/3/2014 PASS
DetailsEvan Jenkins
Application received  2/24/2014 DONE
Application submitted via PDS Online on Feb 24 2014 3:14PM