Print Statement | | | 9/18/2015 | | DONE |
|
|
|
|
Second Notice | | 11/20/2014 | 11/24/2014 | | DONE |
|
|
|
|
Print Statement | | | 11/24/2014 | | DONE |
|
|
|
|
First Notice | | 10/27/2014 | 11/10/2014 | | DONE |
|
|
|
e-mailed to Duel Christensen w/Anderson Const.
|
BLD-Final | 10/15/2014 | 10/16/2014 | 10/17/2014 | P | PASS |
Dave Hannah
|
|
|
Chris Phone #: ###-#### ok for perm occ
|
Permanent Occupancy | | | 10/17/2014 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 10/10/2014 | | DONE |
Candy A. Nichols
|
|
|
called Jim-need to contact us about the epired temp occ.-left message on his cell phone
|
Temporary Occupancy | 10/7/2014 | 1/5/2015 | 10/7/2014 | | DONE |
Tisha Gallop
|
|
|
extention of temp occ to 1/5/15 approved by Jason Blais. Reprinted temp occupancy card with new date and e-mailed to Duel Christensen at Andersen Construction
|
Change Expiration Date Only | | | 10/7/2014 | | DONE |
Tisha Gallop
|
|
|
temp occupancy extended to 1-5-15; see attached letter approved by Jason Blais.
|
FIRE-Final Inspection | 9/23/2014 | 9/23/2014 | 9/23/2014 | P | PASS |
Forrest France
|
|
|
Fire life safety final approved.
|
BLD-Aging Inspection | 9/2/2014 | 9/2/2014 | 9/2/2014 | | PEND |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 7/2/2014 | 7/3/2014 | 7/3/2014 | A | PART |
Forrest France
|
|
|
Fire life safety inspection and evaluation at the kitchen and bakery areas completed. Items noted include; missing EM light at the exit discharge, post 2A10BC PFE, need to schedule fire alarm testing for occupant notification. As-builts for fire sprinkler modifications accepted. Request for temporary occupancy must be approved by fire prevention chief R. Gervais.
|
BLD-Final | 7/2/2014 | 7/3/2014 | 7/3/2014 | A | PART |
Dave Hannah
|
|
|
for temp CO // Jim Phone #: ###-#### ok for temp occ needs all other trades to go perm occ
|
Temporary Occupancy | 7/3/2014 | 10/1/2014 | 7/3/2014 | | DONE |
Tisha Gallop
|
|
|
|
Temporary Occupancy | 7/3/2014 | 10/1/2014 | 7/3/2014 | | DONE |
Angela Brosious
|
|
|
|
Temporary Occupancy | 7/3/2014 | 10/1/2014 | 7/3/2014 | | DONE |
Angela Brosious
|
|
|
|
Telephone call | | | 7/3/2014 | | DONE |
Tisha Gallop
|
|
|
called insp 410, authorized ok to issue temp co for kitchen
|
BLD-Final | 6/27/2014 | 6/30/2014 | 6/30/2014 | A | NR |
Dave Hannah
|
|
|
Jim Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 6/16/2014 | 6/17/2014 | 6/17/2014 | A | DONE |
Jim Storey
|
|
|
Jim Phone #: ###-#### previous aproval 425
|
BLD-Ceiling Grid Inspection | 5/19/2014 | 5/20/2014 | 5/20/2014 | A | PASS |
Dave Hannah
|
|
|
Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 5/7/2014 | 5/7/2014 | 5/8/2014 | P | PASS |
Dave Hannah
|
|
|
jim - cover inspection Phone #: ###-####
|
BLD-Other | 5/6/2014 | 5/7/2014 | 5/7/2014 | A | NR |
Dave Hannah
|
|
|
jim - cover inspection Phone #: ###-####
|
Permit Ready to Issue | | | 4/1/2014 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 4/1/2014 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 4/1/2014 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (CJW) | 2/25/2014 | 2/25/2014 | 3/21/2014 | | PASS |
Carl Westfall
|
|
|
OWYHEE PLACE KITCHEN - Level 3 TI - ePlanReview (10 days - March 10) (20 days - March 24)
|
Routing Off Site - C.D.H | 2/25/2014 | | 3/21/2014 | | PASS |
Carl Westfall
|
|
|
(3-14-14) Talked to Brigitta and she said she would fail it in ePlan. She had not done it yet.
(3-21-14) Big delay at CDHD. Brigitta called and said she had been sick and would sign it off now. Checked later and found out it was still not signed off. Asked Alex to sign it off approved.
|
1st review completed | | | 3/21/2014 | | DONE |
|
|
|
Held up for the longest time by CDHD.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/21/2014 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/25/2014 | | 3/14/2014 | | PASS |
Carl Westfall
|
|
|
Drawings approved with "red lines".
|
Routing - FIRE | 2/25/2014 | 2/25/2014 | 3/12/2014 | | PASS |
Scott Arellano
|
|
|
See fire plan review 03-12-14
|
Routing - PLUMBING | 2/25/2014 | | 2/28/2014 | | PASS |
Bill VanDegrift
|
|
|
Per plan and ISPC.
|
Application received | | | 2/25/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 25 2014 9:38AM
|
Intake Approval | | | 2/25/2014 | | PASS |
Jason Blais
|
|
|
Prescreen approved by Adele Schaffeld-Griffin and plan review fees paid.
|
Pending Assignment by JCB | 2/25/2014 | | 2/25/2014 | | DONE |
Jason Blais
|
|
|
|
Routing PW Sewer Rating | 2/25/2014 | | 2/25/2014 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Environmental | 2/25/2014 | | 2/25/2014 | | PASS |
Walt Baumgartner
|
|
|
plans note use of existing grease line to on site GI, OK
|
Routing - Addressing | 2/25/2014 | | 2/25/2014 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 2/25/2014 | | 2/25/2014 | | PASS |
Beverly Mountain
|
|
|
|