BLD-Final | 7/1/2014 | 7/1/2014 | 7/1/2014 | P | DONE |
Tony Young
|
|
|
call for access info // Doug Phone #: ###-####
|
DOC - Permit Finaled | 7/1/2014 | 7/1/2014 | 7/1/2014 | P | PASS |
Tony Young
|
|
|
done
|
BLD-Final | 6/30/2014 | 7/1/2014 | 7/1/2014 | A | DEFR |
Tony Young
|
|
|
call for access info // Doug Phone #: ###-####
|
BLD-Final | 6/27/2014 | 6/30/2014 | 6/30/2014 | A | DEFR |
Tony Young
|
|
|
call for access info // Doug Phone #: ###-####
|
BLD-Footing | 3/13/2014 | 3/14/2014 | 3/14/2014 | A | PASS |
Tony Young
|
|
|
Requests around 1 - David Phone #: ###-####
|
BLD-Footing | 3/12/2014 | 3/13/2014 | 3/13/2014 | P | PART |
Tony Young
|
|
|
Requests around 1 - David Phone #: ###-####,, no plans
|
PubWorks Subgrade Approval | 3/13/2014 | 3/13/2014 | 3/13/2014 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
OVERRIDE | | | 2/25/2014 | | |
|
|
|
|
Application received | | 2/25/2014 | 2/25/2014 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 2/25/2014 | 2/25/2014 | 2/25/2014 | A | DONE |
Colleen T Carroll
|
|
|
|
Routing Walk-In (PW Hillside) | 2/25/2014 | 2/25/2014 | 2/25/2014 | A | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing Walk-In (BLD) | 2/25/2014 | 2/25/2014 | 2/25/2014 | P | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 2/25/2014 | 2/25/2014 | 2/25/2014 | | PASS |
Perry Paine
|
|
|
|
1st review completed | | | 2/25/2014 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/25/2014 | | |
|
|
|
|
Inspection Record Card- Bld | | | 2/25/2014 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/25/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/25/2014 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 2/25/2014 | | DONE |
|
|
|
|