BLD-Final | 6/10/2015 | 6/10/2015 | 6/10/2015 | P | PASS |
Phil Shearer
|
|
|
Eric Phone #: ###-####
|
DOC - Permit Finaled | 6/10/2015 | 6/10/2015 | 6/10/2015 | P | PASS |
Phil Shearer
|
|
|
|
PubWorks Occupancy Approval | 6/10/2015 | 6/10/2015 | 6/10/2015 | | DONE |
Jason C. Taylor
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Final | 6/3/2015 | 6/3/2015 | 6/3/2015 | P | NR |
Phil Shearer
|
|
|
Eric Phone #: ###-####
|
BLD-Final | 5/26/2015 | 5/27/2015 | 5/27/2015 | P | NR |
Phil Shearer
|
|
|
Eric Phone #: ###-####
|
BLD-Energy code compliance | 12/12/2014 | 12/15/2014 | 12/15/2014 | A | PASS |
Phil Shearer
|
|
|
Eric Phone #: ###-####
|
Plan Modification Accepted | | | 12/11/2014 | | DONE |
|
|
|
new manual j
|
Routing - MECHANICAL | 12/11/2014 | | 12/11/2014 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Framing/Rough-in | 12/1/2014 | 12/2/2014 | 12/2/2014 | A | PASS |
Phil Shearer
|
|
|
Eric Phone #: ###-####
|
BLD-Wall Bracing | 12/2/2014 | 12/2/2014 | 12/2/2014 | P | PASS |
Phil Shearer
|
|
|
Eric Phone #: ###-####
|
BLD-Foundation | 9/9/2014 | 9/9/2014 | 9/9/2014 | P | PASS |
Phil Shearer
|
|
|
Ben Phone #: ###-####
|
BLD-Footing | 8/15/2014 | 8/15/2014 | 8/18/2014 | P | PASS |
Phil Shearer
|
|
|
Ben Phone #: ###-####
|
PubWorks Subgrade Approval | 8/18/2014 | 8/18/2014 | 8/18/2014 | | DONE |
Jason C. Taylor
|
|
|
*Circular retaining wall only* A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 8/14/2014 | 8/14/2014 | 8/14/2014 | P | CANC |
Phil Shearer
|
|
|
Ben Phone #: ###-####
|
BLD-Foundation | 7/3/2014 | 7/3/2014 | 7/7/2014 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Conference | 7/3/2014 | 7/3/2014 | 7/3/2014 | P | CANC |
Dave Hannah
|
|
|
Ben Phone #: ###-####
|
BLD-Footing | 7/1/2014 | 7/1/2014 | 7/1/2014 | P | PASS |
Dave Hannah
|
|
|
Ben Phone #: ###-####
|
PubWorks Subgrade Approval | 6/26/2014 | 6/26/2014 | 6/26/2014 | | DONE |
Jason C. Taylor
|
|
|
**RESIDENCE ONLY*** NO COLUMNS**A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Foundation | 6/10/2014 | 6/10/2014 | 6/10/2014 | P | PART |
Dave Hannah
|
|
|
Ben Phone #: ###-#### high basement walls ok
|
BLD-Footing | 6/3/2014 | 6/3/2014 | 6/4/2014 | P | PART |
Dave Hannah
|
|
|
Request inspe,tion about 2:00 Phone #: ###-#### >> Inspection requested via web by Ben Sears basement back high wall ok
|
PubWorks Subgrade Approval | 5/21/2014 | 5/21/2014 | 5/21/2014 | | DONE |
Jason C. Taylor
|
|
|
*NOTE* BASEMENT FOOTING ONLY***A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
OVERRIDE | | | 3/12/2014 | | |
|
|
|
|
Plan assigned to (JG) | 2/25/2014 | 2/25/2014 | 3/12/2014 | | PASS |
Javier Guzman
|
|
|
1st review completed, Due 3/14 L2** Hillside
|
Routing - PLAN CHECK | 3/10/2014 | | 3/12/2014 | | PASS |
Javier Guzman
|
|
|
|
Issue PAID IN FULL permit | | | 3/12/2014 | | DONE |
Christina Prado
|
|
|
|
Case Summary (BLD) | | | 3/12/2014 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/12/2014 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/12/2014 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 3/12/2014 | | DONE |
Christina Prado
|
|
|
Called Eric to advise permit is ready and gave fees due
|
Permit Ready to Issue | | | 3/12/2014 | | DONE |
Christina Prado
|
|
|
|
Routing PW Grading-Hillside | 3/11/2014 | | 3/11/2014 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - FIRE | 3/10/2014 | 3/10/2014 | 3/10/2014 | | PASS |
Scott Arellano
|
|
|
Attached plan review report to plan and case.
|
1st review completed | | | 3/10/2014 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | | | 3/10/2014 | | FAIL |
Javier Guzman
|
|
|
3/10/2014 emailed applicant review report
|
Routing - FIRE | 3/4/2014 | | 3/5/2014 | | FAIL |
Scott Arellano
|
|
|
Emailed plan review report to applicant. Attached report to case.
|
Routing - Erosion and Sediment | 3/4/2014 | | 3/4/2014 | | PASS |
Andy J. Long
|
|
|
ESC plan and narrative submitted and approved. Valid RP and PD provided.
|
Routing - MECHANICAL | 3/4/2014 | | 3/4/2014 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | 2/27/2014 | | 3/4/2014 | | FAIL |
Troy James
|
|
|
emailed corrections to Idaho HVAC
|
Routing - PLANNING | 2/27/2014 | | 2/27/2014 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 2/26/2014 | | 2/27/2014 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 2/26/2014 | | 2/27/2014 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Grading-Hillside | 2/26/2014 | | 2/27/2014 | | FAIL |
Jason C. Taylor
|
|
|
Retaining walls need to be engineered. Jason Taylor ###-####
|
Application received | | 2/25/2014 | 2/26/2014 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/25/2014 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/25/2014 | | DONE |
Tisha Gallop
|
|
|
|
Intake Approval | | | 2/25/2014 | | PASS |
Tisha Gallop
|
|
|
|