Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD14-00433
StatusFinaled
Name ALPINE CONSTRUCTION INC
Site Address 225 N 9TH ST Unit: 400
Project NameClearwater Expansion Suite 400
Customer Number 
ePlanReviewYes
Description
(Clearwater 4th Floor Expansion) Permit is to expand an existing tenant to the remaining tenant space on the 4th floor. Expansion will include open office and conference room. Conference room created by nonbearing noncombustible framing with repair to ceiling grid as needed. . Door hardware to be lever type. New 20 min rated door to be installed in existing corridor wall. Door shall meet all requirements to be placed in rated assembly. Minor demo per approved plans. There is NO plumbing changes indicated on the plan submittal. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **ajs**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 6/15/20146/19/2014 DONE
This permit finaled on the web by Mike Salyer
First Notice 4/25/20146/5/2014 DONE
DetailsChristina Prado
BLD-Final4/14/20144/15/20144/15/2014PPASS
DetailsDave Hannah
Garrett-PLease call at least 30 mins prior to inspection Phone #: ###-####
FIRE-Final Inspection4/14/20144/15/20144/15/2014APASS
DetailsForrest France
Fire life safety inspection completed acceptable.
Permanent Occupancy  4/15/2014 DONE
DetailsBarbara Stitt
FIRE-Conference4/1/20144/1/20144/1/2014ADONE
DetailsForrest France
Modifications to the floorplan will require adjustments to existing fire sprinkler coverage at two areas. Discussed door hardware, project related fire alarm work. EM lights and exit signs tested okay.
BLD-Other3/21/20143/24/20143/24/2014APASS
DetailsDave Hannah
ceiling cover // Garrett Phone #: ###-####
BLD-Framing/Rough-in3/13/20143/14/20143/14/2014APASS
DetailsJim Sly
garrett Phone #: ###-####
Issue PAID IN FULL permit  3/11/2014 DONE
DetailsChristina Prado
Print Occupancy Form  3/11/2014 DONE
DetailsChristina Prado
Permit Ready to Issue  3/10/2014 DONE
DetailsChristina Prado
Plan assigned to (AJS)3/4/20143/4/20143/7/2014 PASS
DetailsAdele J Schaffeld-Griffin
Due 3/10 clear water
Routing - PLAN CHECK3/4/2014 3/7/2014 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed  3/7/2014 DONE
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  3/7/2014 DONE
Intake Approval  3/4/2014 PASS
DetailsAdele J Schaffeld-Griffin
Routing - Addressing3/4/2014 3/4/2014 PASS
DetailsEmily Dixon
Suite number is 400
Routing - PUBLIC WORKS3/4/2014 3/4/2014 PASS
DetailsConnie Baumgartner
Routing PW Sewer Rating3/4/2014 3/4/2014 PASS
DetailsConnie Baumgartner
Application received  2/26/2014 DONE
Application submitted via PDS Online on Feb 26 2014 4:54PM