Permit Information
Permit NumberBLD14-00437
StatusIssued
Name HDT CONCRETE CONSTRUCTION
Site Address 821 W WYNDEMERE DR
Project Name 
Customer Number 
ePlanReviewNo
Description
To place a new 800s.f. inground gunite (shot crete) swimming pool with salt disinfection and cartridge filter. R-1B setbacks approved by Leon Letson. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946. Separate electrical permit is required and bonding of all metal parts is required to be approved by the electrical division prior to approval for placement of any concrete by the structural division. all per the approved plans as marked and ESC Waver Request approval by Andy Long. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Other3/19/20143/20/20143/20/2014PPASS
DetailsTony Young
pool rebar // Troy Phone #: ###-####
PubWorks Subgrade Approval3/20/20143/20/20143/20/2014 DONE
DetailsJason C. Taylor
*NOTE - Please check that pool is farther than 7' away from edge of slope* A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Issue PAID IN FULL permit  3/19/2014 DONE
DetailsTisha Gallop
OVERRIDE  3/5/2014  
Plan assigned to (PEP)3/5/20143/5/20143/5/2014 PASS
DetailsPerry Paine
Routing Walk-In (BLD)3/4/20143/4/20143/5/2014PDONE
DetailsPerry Paine
routed back to plan check to finish building permit documentation
Inspection Record Card- Bld  3/5/2014  
1st review completed  3/5/2014 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/5/2014 DONE
Telephone call  3/5/2014 DONE
DetailsChristina Prado
left message with Troy giving fees due and advising RP is required prior to issuance
Permit Ready to Issue  3/5/2014 DONE
DetailsChristina Prado
Routing Walk-In (BLD)2/27/20142/27/20143/4/2014ADONE
DetailsAndy J. Long
Routing - Erosion and Sediment2/27/2014 3/4/2014 PASS
DetailsAndy J. Long
ESC plan waiver submitted and approved. Valid RP provided.
PLANS/APPL TAKEN TO FRONT DESK  3/4/2014 DONE
CHANGE STATUS TO (REV)  3/4/2014 DONE
erosion routed to front desk by mistake, routed back to plan check to finish permit
Routing Walk-In (PW Hillside)2/27/20142/27/20142/27/2014APASS
DetailsJoshua Johnson
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Routing Walk-In (Zoning)2/27/20142/27/20142/27/2014APASS
DetailsLeon Letson
Application received 2/27/2014