Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD14-00462
StatusFinaled
Name TIM AUSTIN CONSTRUCTION
Site Address 4317 W AUDUBON PL
Project Name 
Customer Number 
ePlanReviewNo
Description
This project is for an extensive remodel and the addition of 577s.f. to an existing 3543s.f. 1-story single family dwelling. The remodel will consist of a garage front conversion to a double door; a new entry way, a new roof structure over the rear patio; addition of a bathroom by reducing 2-small bedrooms and all exterior glazing will be replaced. The addition will consist of an addition to and creation of a new master suite area. R-1B okper Todd Tucker. Separate electrical, plumbing, mechanical and ESC permits are required. All per the approved plans as marked and the plan review notes. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/16/20149/17/20149/17/2014APASS
DetailsPhil Shearer
Tim-please call 20 min prior for access Phone #: ###-####
DOC - Permit Finaled9/17/20149/17/20149/17/2014PPASS
DetailsPhil Shearer
BLD-Energy code compliance5/20/20145/21/20145/21/2014APASS
DetailsTom Arcoraci
tim - please call 1/2 prior Phone #: ###-####
BLD-Framing/Rough-in5/20/20145/21/20145/21/2014APASS
DetailsTom Arcoraci
tim - please call 1/2 prior Phone #: ###-####
BLD-Framing/Rough-in5/13/20145/13/20145/14/2014PPASS
DetailsJim Sly
call when on way // Tim Phone #: ###-####
BLD-Wall Bracing5/6/20145/7/20145/7/2014APASS
DetailsTom Arcoraci
call before // shear and a hangar//Tim Phone #: ###-####
BLD-Framing/Rough-in5/7/20145/7/20145/7/2014PPASS
DetailsTom Arcoraci
call before // shear and a hangar//Tim Phone #: ###-####
BLD-Footing3/24/20143/25/20143/25/2014APASS
DetailsTom Arcoraci
DAVE Phone #: ###-####
BLD-Footing3/18/20143/19/20143/19/2014APASS
DetailsTom Arcoraci
dave Phone #: ###-####
OVERRIDE  3/3/2014  
Routing Walk-In (Zoning)3/3/20143/3/20143/3/2014APASS
DetailsTodd Tucker
Routing Walk-In (BLD)3/3/20143/3/20143/3/2014ADONE
DetailsPerry Paine
Plan assigned to (PEP)3/3/20143/3/20143/3/2014 PASS
DetailsPerry Paine
Inspection Record Card- Bld  3/3/2014  
1st review completed  3/3/2014 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/3/2014 DONE
Permit Ready to Issue  3/3/2014 DONE
Issue PAID IN FULL permit  3/3/2014 DONE
Routing - MECHANICAL3/3/2014 3/3/2014 PASS
DetailsTroy James
manual j review
Application received 3/3/2014