Second Notice | | 9/5/2014 | 9/15/2014 | | DONE |
Christina Prado
|
|
|
completed 9-15-14
|
Print Statement | | | 9/15/2014 | | DONE |
Christina Prado
|
|
|
|
First Notice | 8/7/2014 | 8/7/2014 | 8/26/2014 | | DONE |
Jim Storey
|
|
|
|
BLD-Final | 8/6/2014 | 8/7/2014 | 8/7/2014 | A | PASS |
Jim Storey
|
|
|
John Phone #: ###-####
|
DOC - Permit Finaled | 8/7/2014 | 8/7/2014 | 8/7/2014 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 8/4/2014 | 8/5/2014 | 8/5/2014 | P | FAIL |
Jim Storey
|
|
|
Don Phone #: ###-#### fire chalk/doorlable/smokeseal
|
FIRE-Final Inspection | 8/4/2014 | 8/4/2014 | 8/4/2014 | P | PASS |
Forrest France
|
|
|
Life safety inspection passed. *Note- closures at the warehouse door 110 and break room door 112 to be installed prior to structural final.
|
BLD-Other | 6/9/2014 | 6/9/2014 | 6/9/2014 | P | PASS |
Jim Storey
|
|
|
fire wall // Dillon Phone #: ###-####
|
BLD-Framing/Rough-in | 5/29/2014 | 5/30/2014 | 5/30/2014 | P | PASS |
Jim Storey
|
|
|
Dylan Phone #: ###-####
|
BLD-Conference | 5/12/2014 | 5/12/2014 | 5/12/2014 | P | PASS |
Jim Storey
|
|
|
Don Phone #: ###-####
|
Plan Reviewer's activity | | | 4/30/2014 | | DONE |
Tim L. Woodard
|
|
|
Verbally approved Fire Dampers only in new Fire Barrier. Smoke fire dampers were called out; however, are not minimum code. Engineer indicated he was ok with the change. TLW
|
BLD-Conference | 4/29/2014 | 4/29/2014 | 4/29/2014 | P | PART |
Jim Storey
|
|
|
Don Phone #: ###-####
|
Issue PAID IN FULL permit | | | 4/16/2014 | | DONE |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 4/16/2014 | | DONE |
Tisha Gallop
|
|
|
|
OVERRIDE | | | 4/15/2014 | | |
|
|
|
|
Routing - PLAN CHECK | 4/15/2014 | | 4/15/2014 | | PASS |
Tim L. Woodard
|
|
|
Approved with redlines. TLW
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/15/2014 | | DONE |
Tim L. Woodard
|
|
|
|
Permit Ready to Issue | | | 4/15/2014 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (TLW) | 3/7/2014 | | 4/15/2014 | | PASS |
Tim L. Woodard
|
|
|
|
Routing PW Drainage | 3/24/2014 | | 3/24/2014 | | PASS |
Brian Murphy
|
|
|
|
1st review completed | | | 3/21/2014 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 3/7/2014 | | 3/21/2014 | | FAIL |
Tim L. Woodard
|
|
|
Refer to change marks on E-plan review. TLW
|
Routing - FIRE | 3/7/2014 | | 3/17/2014 | | PASS |
Craig D. Hanson
|
|
|
SeeFire Plan Report 03-17-14
|
Routing - Erosion and Sediment | 3/7/2014 | | 3/11/2014 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver submitted and approved. Need to designated valid RP to get permit.
|
Routing - Addressing | 3/7/2014 | | 3/10/2014 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 3/7/2014 | | 3/10/2014 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Rating | 3/10/2014 | | 3/10/2014 | | PASS |
Connie Baumgartner
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 3/7/2014 | | DONE |
Tim L. Woodard
|
|
|
|
Intake Approval | | | 3/7/2014 | | PASS |
Tim L. Woodard
|
|
|
|
Application received | | | 3/3/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 3 2014 3:07PM
|