Permit NumberBLD14-00522
StatusFinaled
Name SATHER CONSTRUCTION LLC
Site Address 621 S 17TH ST
Project NamePowerhouse Event Center
Customer Number 
ePlanReviewNo
Description
(Powerhouse Event Center - Exterior Stair Replacement) Permit for the replacement of the existing treads and risers for the exterior exit stairway. The existing stringers and landing will remain in place with only the one peice tread/riser being replaced per the approved plans and the attached engineering. This building is fully fire sprinklered any alterations to the sprinkler system will require a separate permit. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  10/5/2016 DONE
First Notice6/19/20146/19/20147/15/2014 DONE
DetailsDave Hannah
Faxed 7-15-14
BLD-Final6/12/20146/13/20146/19/2014PPASS
DetailsDave Hannah
larry Phone #: ###-####
DOC - Permit Finaled6/19/20146/19/20146/19/2014PPASS
DetailsDave Hannah
FIRE-Final Inspection6/12/20146/13/20146/13/2014APASS
DetailsForrest France
Scope of work completed. Inspection passed, no signature card available on site .
Application received 3/7/20144/4/2014 DONE
Issue PAID IN FULL permit  4/4/2014 DONE
DetailsTisha Gallop
Plan assigned to (CDM)3/7/20143/7/20144/3/2014 PASS
DetailsCarl D Madsen
First review completed.
Routing - PLAN CHECK4/3/2014 4/3/2014 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  4/3/2014 DONE
Case Summary (BLD)  4/3/2014 DONE
Inspection Record Card- Bld  4/3/2014 DONE
DetailsBarbara Stitt
Telephone call  4/3/2014 DONE
DetailsChristina Prado
Called Larry to advise permit is ready and gave fees due
Permit Ready to Issue  4/3/2014 DONE
DetailsChristina Prado
Plan resubmittals received  4/1/2014 DONE
DetailsTisha Gallop
received four copies of plan sheet S1.0 and two copies of structural calcs; taken to Carl Madsen
Routing - PLAN CHECK3/7/2014 3/10/2014 FAIL
DetailsCarl D Madsen
Engineering is required CDM
1st review completed  3/10/2014 FAIL
Plans ACCEPTED BY PLAN TECH  3/7/2014 DONE
DetailsChristina Prado
Intake Approval  3/7/2014 PASS
DetailsTim L. Woodard
Recd Pcfee & Taken To Pln CK  3/7/2014 DONE
DetailsChristina Prado