Letter of compliance/Occupancy | | | 1/23/2015 | | DONE |
Candy A. Nichols
|
|
|
|
BLD-Final | 12/15/2014 | 12/16/2014 | 12/16/2014 | A | PASS |
Tony Young
|
|
|
Key code front door: 3412 Paper work on kitchen island. Phone #: ###-#### Inspection requested via web by James Greenwood
|
DOC - Permit Finaled | 12/16/2014 | 12/16/2014 | 12/16/2014 | P | PASS |
Tony Young
|
|
|
c of o issued
|
Zoning Approval | 12/16/2014 | 12/16/2014 | 12/16/2014 | | DONE |
Matthew A Halitsky
|
|
|
|
BLD-Final | 12/15/2014 | 12/15/2014 | 12/15/2014 | P | PEND |
Tony Young
|
|
|
Key code front door: 3412 Paper work on kitchen island. Phone #: ###-#### Inspection requested via web by James Greenwood,, pending zoning
|
BLD-Final | 12/12/2014 | 12/15/2014 | 12/15/2014 | A | PEND |
Tony Young
|
|
|
Key code front door: 3412 Paper work on kitchen island. Phone #: ###-#### Inspection requested via web by James Greenwood,, ok pending zoning
|
BLD-Wall cover | 8/5/2014 | 8/5/2014 | 8/5/2014 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by James Greenwood
|
BLD-Energy code compliance | 8/5/2014 | 8/5/2014 | 8/5/2014 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by James Greenwood
|
BLD-Framing/Rough-in | 8/3/2014 | 8/4/2014 | 8/4/2014 | A | PASS |
Tony Young
|
|
|
Note: the nailing on one side of the girder trusses is hidden. The trusses are nailed according to plan. In order to see the nailing pattern, I’ve taken magnets and placed them along the truss to show where the nails are located due to the nail heads being covered by the adjoining truss. This can be viewed in the master bedroom along the bottom cord of the truss for a two foot span. Phone #: ###-#### Inspection requested via web by James Greenwood///, pass with the condition that...NOTE.., contractor is taking full responsibility of girder nailing.. ok to insulate
|
BLD-Framing/Rough-in | 7/30/2014 | 7/30/2014 | 7/30/2014 | A | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by James Greenwood,, c/n listed on truss eng,, ok to insulate
|
BLD-Conference | 7/15/2014 | 7/16/2014 | 7/16/2014 | P | PASS |
Tony Young
|
|
|
Notify contractors that working hours begin at 7 am. Complaints received that they are starting at 6 am.,, talked with builder,, said workers have been talked to
|
CHANGE STATUS TO (ISS) | | | 6/26/2014 | | |
|
|
|
|
Plan assigned to (JG) | 6/20/2014 | 6/20/2014 | 6/25/2014 | | DONE |
Javier Guzman
|
|
|
Plan Modification
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/25/2014 | | DONE |
|
|
|
|
Plan resubmittals received | | | 6/20/2014 | | |
|
|
|
2 copis of sheets A-3, A-4, A-5, A-6, A-7, 2 truss packages for a plan modification
|
BLD-Foundation | 5/28/2014 | 5/28/2014 | 5/28/2014 | P | PASS |
Tony Young
|
|
|
jerry Phone #: ###-####
|
BLD-Footing | 5/27/2014 | 5/28/2014 | 5/28/2014 | A | PASS |
Jim Sly
|
|
|
Jimmy Phone #: ###-####
|
BLD-Foundation | 5/5/2014 | 5/5/2014 | 5/5/2014 | P | PART |
Tony Young
|
|
|
Dane Phone #: ###-####,, basement wall ok
|
BLD-Footing | 5/1/2014 | 5/1/2014 | 5/1/2014 | P | PASS |
Jim Sly
|
|
|
dane Phone #: ###-####
|
BLD-Other | 4/28/2014 | 4/28/2014 | 4/28/2014 | P | DONE |
Tony Young
|
|
|
Pre-construction Erosion and Sediment control. Phone #: ###-#### >> Inspection requested via web by James Greenwood,, done by Andy L. under the ESC permit
|
OVERRIDE | | | 4/25/2014 | | |
|
|
|
|
Plan assigned to (JG) | 4/10/2014 | 4/10/2014 | 4/25/2014 | | PASS |
Javier Guzman
|
|
|
1st review completed, Pending Planning, Due 4/22 L1 ePlan**
|
Inspection Record Card- Bld | | | 4/25/2014 | | DONE |
Tisha Gallop
|
|
|
|
Issue PAID IN FULL permit | | | 4/25/2014 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | 4/18/2014 | | 4/25/2014 | | PASS |
Javier Guzman
|
|
|
|
Routing - Design Review | 4/25/2014 | | 4/25/2014 | | PASS |
Andrea Tuning
|
|
|
OK Per Cody Riddle
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/25/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/25/2014 | | DONE |
Tisha Gallop
|
|
|
|
1st review completed | | | 4/18/2014 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 4/10/2014 | | 4/18/2014 | | FAIL |
Javier Guzman
|
|
|
ePlan review
|
Route to Impact Fee Review | 4/10/2014 | 4/13/2014 | 4/16/2014 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - MECHANICAL | 4/10/2014 | | 4/11/2014 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 4/10/2014 | | 4/11/2014 | | FAIL |
Matthew A Halitsky
|
|
|
Front elevation windows do not match those approved by the Commission. Passed by andrea tunnig See DR review for review
|
Routing - Addressing | 4/10/2014 | | 4/10/2014 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 4/10/2014 | | 4/10/2014 | | PASS |
Connie Baumgartner
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/10/2014 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/10/2014 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 4/9/2014 | | PASS |
Christina Prado
|
|
|
|
Intake Approval | | | 3/11/2014 | | FAIL |
Christina Prado
|
|
|
Plans orientation needs to be corrected, bracing on second level, cross section from basement up needed(only have footing detail) CO/Smoke detectors location needs called out, Manual J needs to be uploaded as well as Zoning approval letter. Need to know value of demo
|
Application received | | | 3/7/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 7 2014 2:46PM
|