Permit Information
Permit NumberBLD14-00535
StatusFinaled
Name ALL THAT'S LEFT LLC
Site Address 9107 W USTICK RD
Project NameVillage Chaton
Customer NumberMULTIPLE PERMITS
ePlanReviewNo
Description
(Village Chaton 4-plex - Bldg #1) To construct a new 3,668 sq. ft., two story, Four unit, apartment building. Units 'A' have one bedroom, one den, and two bathrooms. Units 'B' have two bedrooms, and two bathrooms. All 4 dwelling units have their own independent exit. All construction per the approved plans, attached plan review report, and all other reviewing agencies approvals. One hour fire-partition separations are required between dwelling units. This building is required to be fire sprinklered. The fire sprinkler system shall be per NFPA 13R as regulated by the fire department. DRH13-00288 Per Planning and Zoning. Grading Drainage and Erosion Sediment Control plans reviewed under the Grading permit BLD14-00186. **SRZ**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy  3/3/2015 DONE
PubWorks Occupancy Approval2/27/20152/27/20152/27/2015 DONE
DetailsJason C. Taylor
Drainage Completed. Jason Taylor ###-####
Zoning Approval2/27/20152/27/20152/27/2015 PASS
DetailsJosh Wilson
Temporary Occupancy2/11/20155/12/20152/11/2015 DONE
DetailsChristina Prado
BLD-Final1/29/20151/30/20151/30/2015APASS
DetailsJim Sly
Tyler Phone #: ###-####
OK for Temp Occ. OK for perm occ. when Public Works signs Perm. As per Jim Sly-ok for perm CO since PW passed final 3-3-15 CAN
Zoning Approval Temp1/30/20151/30/20151/30/2015 PASS
DetailsSarah Schafer
PubWorks Temp Occupancy Appr1/29/20151/29/20151/29/2015 DONE
DetailsJason C. Taylor
Temporary occupancy approved. Site draiange needs to be finished. Jason Taylor ###-####.
BLD-Final1/22/20151/23/20151/23/2015PNR
DetailsJim Sly
Tyler ###-####
Need Public works Zoning and ACHD Finals
FIRE-Final Inspection1/22/20151/23/20151/23/2015APASS
DetailsTroy Cobbley
life safety passed
BLD-Framing/Rough-in12/15/201412/16/201412/16/2014APASS
DetailsJim Sly
Tylor Phone #: ###-####
BLD-Energy code compliance12/15/201412/16/201412/16/2014APASS
DetailsJim Sly
Tyler Phone #: ###-####
BLD-Framing/Rough-in12/8/201412/10/201412/10/2014AFAIL
DetailsMike Jordan
Tyler Phone #: ###-####. Fireblock mech. furdowns in units 101 and 103. Strap top plates at plumbing penetrationsin unit 101, downstairs tub. Firecaulk all penetrations in partywalls downstairs. ok to insulate, correction notice posted.
BLD-Wall Bracing10/10/201410/10/201410/10/2014PPART
DetailsJim Sly
roof nail - Jim Phone #: ###-####
Roof OK.
BLD-Wall Bracing10/1/201410/2/201410/2/2014APASS
DetailsJim Sly
Ken Phone #: ###-####
BLD-Footing9/9/20149/9/20149/9/2014PPASS
DetailsJim Sly
Ken Phone #: ###-####
OK pending MTI special insp tests and approvals
BLD-Footing9/5/20149/8/20149/8/2014PPART
DetailsDave Hannah
Shane Phone #: ###-#### slab on grade ok to place
BLD-Energy code compliance9/2/20149/2/20149/2/2014PPART
DetailsJim Sly
foundation insulation only - Ashley Phone #: ###-####
BLD-Foundation8/28/20148/29/20148/29/2014APASS
DetailsPhil Shearer
Manuel Phone #: ###-####
BLD-Foundation8/27/20148/28/20148/28/2014PPART
DetailsJim Sly
Manual Phone #: ###-####
Should have been footing insp .....footing ok.
BLD-Footing8/26/20148/27/20148/27/2014ACANC
DetailsJim Sly
Dave Phone #: ###-####
Issue PAID IN FULL permit  8/26/2014 DONE
DetailsChristina Prado
OVERRIDE  8/25/2014  
Plan assigned to (SRZ)8/25/20148/25/20148/25/2014 PASS
DetailsSam Zahorka
Plan assigned to (SRZ)4/1/20144/1/20148/25/2014 DONE
DetailsSam Zahorka
Pending others to PASS.
PLANS/APPL TAKEN TO FRONT DESK  8/25/2014 DONE
DetailsSam Zahorka
Telephone call  8/25/2014 DONE
DetailsChristina Prado
Called Rick to advise permit is ready pending RP and gave fees due
Permit Ready to Issue  8/25/2014 DONE
DetailsChristina Prado
Print Occupancy Form  8/25/2014 DONE
DetailsChristina Prado
Routing - Design Review8/22/2014 8/25/2014 PASS
DetailsJosh Wilson
Pk per DRH13-00253
Routing - PLANNING Land Div8/25/2014 8/25/2014 PASS
DetailsSusan Riggs
Routing - Addressing8/22/2014 8/22/2014 PASS
DetailsJason C. Taylor
Routing PW Drainage8/22/2014 8/22/2014 PASS
DetailsJason C. Taylor
Routing - PLANNING8/20/2014 8/20/2014 PASS
DetailsSusan Riggs
Routing PW Sewer Design5/23/2014 5/23/2014 PASS
DetailsKyle S. Rosenmeyer
Sheet C 5.2 removed.
Routing - PUBLIC WORKS5/21/2014 5/23/2014 PASS
DetailsConnie Baumgartner
Routing - FIRE5/20/20145/20/20145/21/2014 PASS
DetailsCraig D. Hanson
See Fire Plan Review 05-21-14
Routing - Addressing5/21/2014 5/21/2014 FAIL
DetailsJason C. Taylor
No parcel numbers - subdivision has not recorded. Routed to Ron Hill. JCT
Plan resubmittals received  5/20/2014 DONE
received response to Fire review comments and two copies of plan sheets G1.0, G2.0; inserted by arch. rep. and taken back to Sam Zahorka.
Case Summary (BLD)  4/16/2014 DONE
DetailsSam Zahorka
Routing Off Site - STRUCTURAL4/16/2014 4/16/2014 PASS
DetailsSam Zahorka
Routing - PLAN CHECK4/14/2014 4/16/2014 PEND
DetailsSam Zahorka
Pending others to PASS
1st review completed  4/16/2014 FAIL
DetailsSam Zahorka
Routing - MECHANICAL4/15/2014 4/15/2014 PASS
DetailsTroy James
Plan resubmittals received  4/15/2014 DONE
DetailsCandy A. Nichols
received 3 copies of struc response and calcs, taking to Sam Zahorka
Routing - MECHANICAL4/9/2014 4/14/2014 FAIL
DetailsTroy James
emailed correction to Integrity
Route to Impact Fee Review4/8/20144/11/20144/9/2014 PASS
DetailsCindy M. Gould
Routing - FIRE4/8/20144/8/20144/9/2014 FAIL
DetailsCraig D. Hanson
See Fire Plan Review 04-09-14
Routing - PLUMBING  4/9/2014 PASS
Per plan and ISPC.
Routing - Erosion and Sediment4/7/2014 4/8/2014 PASS
DetailsEvan Jenkins
Routing - PUBLIC WORKS4/2/2014 4/7/2014 FAIL
DetailsConnie Baumgartner
Routing Off Site - STRUCTURAL4/2/2014 4/7/2014 FAIL
DetailsSam Zahorka
Routing PW Sewer Design4/4/2014 4/6/2014 FAIL
DetailsKyle S. Rosenmeyer
Exchange sheet C 5.2 with currently approved sheet issued by Boise Public Works as approved 2/18/2014.
Routing PW Sewer Rating4/4/2014 4/4/2014 PASS
DetailsConnie Baumgartner
Routing - Addressing  4/3/2014 FAIL
Need parcel numbers for new subdivision prior to approval. Apartment numbers to given at that time. Jason Taylor ###-####
Application received 3/10/20144/2/2014 DONE
Telephone call  4/2/2014 DONE
DetailsTisha Gallop
called Action Couriers for pick up
Plans ACCEPTED BY PLAN TECH  4/1/2014 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  4/1/2014 DONE
DetailsTisha Gallop
First Notice 3/13/2015   
Routing - PLANNING Land Div4/2/2014   FAIL
DetailsSusan Riggs
SUB13-00028 Susan Riggs
I HAVE REVIEWED THE PLAN AND NO CHANGES NEED TO BE MADE; HOWEVER, I CAN’T SIGN OFF ON THE PLANS UNTIL FINAL PLAT APPROVAL FOR CHATON SUBDIVISION IS APPROVED.