Print Statement | | | 4/25/2016 | | DONE |
Christina Prado
|
|
|
|
Print Statement | | | 4/14/2016 | | DONE |
|
|
|
stamped past due
|
Print Statement | | | 12/2/2015 | | DONE |
|
|
|
|
Third Notice | | 9/19/2015 | 11/9/2015 | | DONE |
|
|
|
|
Third Notice | | 8/15/2015 | 9/14/2015 | | DONE |
|
|
|
|
Second Notice | | 7/19/2015 | 8/10/2015 | | DONE |
|
|
|
Mailed 8/11
|
First Notice | | 7/6/2015 | 8/10/2015 | | DONE |
|
|
|
Mailed 8/11
|
First Notice | | 7/6/2015 | 7/9/2015 | | DONE |
|
|
|
Mailed 7-10-15
|
Permanent Occupancy | | | 6/26/2015 | | DONE |
|
|
|
|
Permanent Occupancy | | | 6/26/2015 | | DONE |
|
|
|
|
BLD-Final | 6/25/2015 | 6/25/2015 | 6/25/2015 | P | PASS |
Jim Storey
|
|
|
MIke Phone #: ###-####
|
BLD-Final | 6/22/2015 | 6/24/2015 | 6/24/2015 | A | FAIL |
Jim Storey
|
|
|
Mike Phone #: ###-#### need handrail
|
PubWorks Occupancy Approval | 6/10/2015 | 6/10/2015 | 6/10/2015 | | DONE |
Tiffany Lowery
|
|
|
|
Temporary Occupancy | 5/7/2015 | 8/5/2015 | 5/7/2015 | | DONE |
Kristal Soland
|
|
|
|
Zoning Approval | 5/4/2015 | 5/4/2015 | 5/4/2015 | | PASS |
Josh Wilson
|
|
|
|
BLD-Final | 4/30/2015 | 5/1/2015 | 5/1/2015 | P | PART |
Jim Storey
|
|
|
Mike Phone #: ###-#### temp occ ok no storage or occ. of mez. no card on site
|
FIRE-Final Inspection | 4/30/2015 | 5/1/2015 | 5/1/2015 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
Print Occupancy Form | | | 5/1/2015 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/1/2015 | | DONE |
|
|
|
|
FIRE-Final Inspection | 4/29/2015 | 4/30/2015 | 4/30/2015 | A | FAIL |
Troy Cobbley
|
|
|
All life safety items are ok except the project related fire alarm and fire sprinkler permits need addressed
|
BLD-Final | 4/29/2015 | 4/30/2015 | 4/30/2015 | P | CANC |
Jim Storey
|
|
|
Cancel per Mike Phone #: ###-####
|
BLD-Final | 4/28/2015 | 4/28/2015 | 4/28/2015 | P | NR |
Jim Storey
|
|
|
Mike Phone #: ###-####
|
BLD-Final | 4/23/2015 | 4/24/2015 | 4/24/2015 | P | CANC |
Jim Storey
|
|
|
Mike Phone #: ###-####
|
FIRE-Final Inspection | 4/23/2015 | 4/24/2015 | 4/24/2015 | A | FAIL |
Troy Cobbley
|
|
|
Not ready for a final due to the project related fire alarm and fire sprinkler permits. Mike and I did discuss life safety items. I noted that the two electric gates may require Opticon opening devices. Per Idaho Power a access card will be provided in the Knox Box for access. I will need Boise Fire approval for this prior to final sign off.
|
OVERRIDE | | | 2/27/2015 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/27/2015 | | DONE |
Candy A. Nichols
|
|
|
|
Plan Modification Accepted | | | 2/27/2015 | | DONE |
Christina Prado
|
|
|
Per request from Chris, plan mod started for revisions to mechanical & plumbing drawings
|
Plan assigned to (CDM) | 2/27/2015 | | 2/27/2015 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 2/27/2015 | | 2/27/2015 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/27/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/27/2015 | | DONE |
Candy A. Nichols
|
|
|
no fees due for plan mod-all requirements met for plan mod
|
BLD-Framing/Rough-in | 1/23/2015 | 1/26/2015 | 1/26/2015 | P | PASS |
Jim Storey
|
|
|
Mike Phone #: ###-####
|
BLD-Foundation | 1/14/2015 | 1/14/2015 | 1/14/2015 | P | PASS |
Jim Storey
|
|
|
Mike-rebar Phone #: ###-#### top out cmu ok
|
BLD-Foundation | 12/9/2014 | 12/9/2014 | 12/9/2014 | P | PASS |
Jim Storey
|
|
|
Mike-rebar Phone #: ###-####2nd lift ok
|
BLD-Foundation | 12/5/2014 | 12/8/2014 | 12/8/2014 | A | PART |
Jim Storey
|
|
|
rebar// Jermey Phone #: ###-#### wip ok
|
BLD-Foundation | 11/4/2014 | 11/5/2014 | 11/5/2014 | P | PASS |
Jim Storey
|
|
|
slab insp// Jeremy Phone #: ###-####
|
BLD-Footing | 8/20/2014 | 8/21/2014 | 8/21/2014 | P | PART |
Jim Storey
|
|
|
please call first-Jeremy Phone #: ###-#### all pads ok pending south wall line bar clearance to be inspected by si prior to placment.
|
BLD-Foundation | 8/13/2014 | 8/14/2014 | 8/14/2014 | A | PASS |
Jim Storey
|
|
|
Jeremy Phone #: ###-####
|
BLD-Footing | 8/11/2014 | 8/12/2014 | 8/12/2014 | A | PASS |
Jim Storey
|
|
|
Jeremy Phone #: ###-#### need compacktion report for fill.
|
BLD-Footing | 8/11/2014 | 8/11/2014 | 8/11/2014 | P | CANC |
Jim Storey
|
|
|
Jeremy Phone #: ###-#### - canceled
|
OVERRIDE | | | 7/16/2014 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 7/16/2014 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 7/16/2014 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 7/16/2014 | | DONE |
Christina Prado
|
|
|
|
Place hold on job | 5/13/2014 | | 7/16/2014 | | DONE |
Christina Prado
|
|
|
BLD14-00586 must be issued at same time. Two permits with one set of plans in Eplan review
|
Plan assigned to (CDM) | 6/30/2014 | | 7/9/2014 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 7/9/2014 | | 7/9/2014 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/9/2014 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 5/8/2014 | | 5/12/2014 | | PASS |
Carl D Madsen
|
|
|
Signed off in E-Plan
|
Routing PW Sewer Design | 5/9/2014 | | 5/12/2014 | | PASS |
Kyle S. Rosenmeyer
|
|
|
Approval applies to sewer in Public R/W ONLY. DEQ Approval required for private 8" sewer extension.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/12/2014 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 3/21/2014 | | 5/12/2014 | | PASS |
John Menard
|
|
|
First review completed
|
Routing - PLAN CHECK | 5/8/2014 | | 5/9/2014 | | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 4/22/2014 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 3/21/2014 | | 4/22/2014 | | FAIL |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 3/21/2014 | | 4/22/2014 | | FAIL |
Carl D Madsen
|
|
|
Failed per E-Plan
|
Routing PW Solid Waste | 3/21/2014 | | 4/1/2014 | | PASS |
Pamela Williams
|
|
|
|
Routing PW Sewer Design | 3/21/2014 | | 3/28/2014 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Rename SSMH -1 to: "SSMH 362E1". Pre-Cast Manhole Base Required. Contact Boise City Public Works 48 hours prior to construction and obtain tap permit for sewer work in public R/W.
|
Routing PW Drainage | 3/21/2014 | | 3/28/2014 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLUMBING | 3/21/2014 | | 3/27/2014 | | PASS |
Daryl Spivey
|
|
|
Trap and vent hub drain and vent and install flammable interceptor vent as shown per redlines on plans.
|
Routing - FIRE | 3/21/2014 | 3/21/2014 | 3/25/2014 | | PASS |
Scott Arellano
|
|
|
See attached Fire Plan Review 03-25-14
|
Route to Impact Fee Review | 3/21/2014 | | 3/25/2014 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - Erosion and Sediment | 3/21/2014 | | 3/25/2014 | | PASS |
Evan Jenkins
|
|
|
|
Routing PW Sewer Rating | 3/21/2014 | | 3/24/2014 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Street Lights | 3/21/2014 | | 3/24/2014 | | PASS |
Mike D Hedge
|
|
|
|
Routing - PLANNING Land Div | 3/21/2014 | | 3/24/2014 | | PASS |
Dave Abo
|
|
|
|
Routing - Addressing | 3/21/2014 | | 3/24/2014 | | PASS |
Emily Dixon
|
|
|
|
Routing - Design Review | 3/21/2014 | | 3/24/2014 | | PASS |
Josh Wilson
|
|
|
|
Routing - PUBLIC WORKS | 3/21/2014 | | 3/21/2014 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Environmental | 3/21/2014 | | 3/21/2014 | | PASS |
Walt Baumgartner
|
|
|
|
Pending Assignment by JCM | 3/21/2014 | | 3/21/2014 | | DONE |
John Menard
|
|
|
|
Intake Approval | | | 3/12/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
1. Please see the change marks on the items that need addressed prior to accepting the pre screen.
2. Each structure is required to have its own building permit number. Please upload in the documents an additional completed building permit application. Please do not start a new electronic permit simply upload the new application in the documents. You will need to separate out the project valuations for each building for this as well. If you have questions on this please contact our permit counter at ###-#### and ask for Alex, Christina or Tisha.
|
Application received | | | 3/11/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 11 2014 10:56AM
|
Routing - PUBLIC WORKS | 5/8/2014 | | | | |
|
|
|
|