Permanent Occupancy | | | 4/1/2016 | | DONE |
|
|
|
|
Permanent Occupancy | | | 4/1/2016 | | DONE |
|
|
|
|
BLD-Final | 3/30/2016 | 3/30/2016 | 3/30/2016 | P | PASS |
Jim Storey
|
|
|
Xavier Phone #: ###-#### fire ok per scott. exit signage ok
|
CHANGE STATUS TO (ISS) | | | 3/8/2016 | | DONE |
|
|
|
|
FIRE-Final Inspection | 5/29/2014 | 5/29/2014 | 5/29/2014 | A | PASS |
Craig D. Hanson
|
|
|
|
Routing - FIRE | 4/8/2014 | 4/8/2014 | 4/16/2014 | | PASS |
Craig D. Hanson
|
|
|
As per submitted and attached HMIS, hazardous materials are below maximum allowable quantities.
|
BLD-Final | 3/14/2014 | 3/14/2014 | 3/14/2014 | P | PART |
Jim Storey
|
|
|
Ron Ramza-PLease call at least 30 mins prior to inspection Phone #: ###-#### pending fire/ rackibng permit if over height 12 ft after fire c/n
|
FIRE-Final Inspection | 3/14/2014 | 3/14/2014 | 3/14/2014 | P | PART |
Craig D. Hanson
|
|
|
Temp OK. need follolwing corrections. 1. Hazmat list, needs evaluation of products 2. Storage within 24" of celeiling, everywhere. 3. Exit signs out. 4. Bags suspended from celing need removed. 5. Racks may need permit. defer to building inspector 6. CO2 system in use for incubators. 7. Signage of hazmat and bio hazaeds will need to be added. will determine after list is evaluated. Renter is going to email me hazmat list within two weeks. I will evaluate space at that time.
|
Temporary Occupancy | 3/14/2014 | 6/12/2014 | 3/14/2014 | | DONE |
Tisha Gallop
|
|
|
|
Issue PAID IN FULL permit | | | 3/14/2014 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (AJS) | 3/11/2014 | 3/11/2014 | 3/13/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 3/12/2014 | | 3/13/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Case Summary (BLD) | | | 3/13/2014 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
1st review completed | | | 3/13/2014 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/13/2014 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/13/2014 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 3/13/2014 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 3/13/2014 | | DONE |
Christina Prado
|
|
|
called Ron to advise permit is ready and gave fees due
|
Routing - Addressing | 3/12/2014 | | 3/12/2014 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 3/12/2014 | | 3/12/2014 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Rating | 3/12/2014 | | 3/12/2014 | | PASS |
Connie Baumgartner
|
|
|
|
Application received | | 3/11/2014 | 3/11/2014 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/11/2014 | | DONE |
Tisha Gallop
|
|
|
|
First Notice | | 4/11/2016 | | | |
|
|
|
|
First Notice | | 4/11/2016 | | | |
|
|
|
|
Routing - PLAN CHECK | 4/16/2014 | | | | |
|
|
|
|