Letter of compliance/Occupancy | | | 11/6/2014 | | DONE |
|
|
|
|
BLD-Final | 10/24/2014 | 10/24/2014 | 10/24/2014 | P | PASS |
Dave Hannah
|
|
|
Bill Phone #: ###-####
|
DOC - Permit Finaled | 10/24/2014 | 10/24/2014 | 10/24/2014 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Conference | 9/19/2014 | 9/22/2014 | 9/22/2014 | A | PASS |
Dave Hannah
|
|
|
Bill Phone #: ###-####
|
BLD-Energy code compliance | 4/30/2014 | 5/1/2014 | 5/1/2014 | A | PASS |
Jim Sly
|
|
|
Bill Phone #: ###-####
|
BLD-Framing/Rough-in | 4/29/2014 | 4/29/2014 | 4/29/2014 | P | PASS |
Dave Hannah
|
|
|
Bill Phone #: ###-####
|
BLD-Conference | 4/14/2014 | 4/15/2014 | 4/15/2014 | A | DONE |
Dave Hannah
|
|
|
Phone #: ###-####
|
OVERRIDE | | | 3/26/2014 | | |
|
|
|
|
OVERRIDE | | | 3/26/2014 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/26/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/26/2014 | | |
|
|
|
|
Routing Walk-In (BLD) | 3/25/2014 | 3/25/2014 | 3/25/2014 | P | DONE |
Perry Paine
|
|
|
|
Inspection Record Card- Bld | | | 3/25/2014 | | |
|
|
|
|
1st review completed | | | 3/25/2014 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/25/2014 | | DONE |
|
|
|
|
Routing Walk-In (PW Hillside) | 3/14/2014 | 3/14/2014 | 3/14/2014 | P | PASS |
Jason C. Taylor
|
|
|
Subgrade inspection is required for deck piers/footings and for entire detached garage. Gutters will be required on detached garage. Guttesr to be piped to street or directed onto driveway for draiange into right of way. Subgrade inspection must be provided to Public Works prior to scheduling for footing inspections from Building Department. Jason Taylor ###-####.
|
Routing Walk-In (Zoning) | 3/14/2014 | 3/14/2014 | 3/14/2014 | P | DONE |
Leon Letson
|
|
|
|
Routing Walk-In (BLD) | 3/14/2014 | 3/14/2014 | 3/14/2014 | P | FAIL |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 3/14/2014 | 3/14/2014 | 3/14/2014 | | FAIL |
Perry Paine
|
|
|
|
1st review completed | | | 3/14/2014 | | FAIL |
|
|
|
need foundation engineering
|
Application received | | 3/14/2014 | | | |
|
|
|
|