BLD-Final | 10/13/2015 | 10/14/2015 | 10/14/2015 | A | PASS |
Jim Sly
|
|
|
Please call about 30min to an hour for access - Steve Phone #: ###-####
|
DOC - Permit Finaled | 10/14/2015 | 10/14/2015 | 10/14/2015 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 7/14/2014 | 7/15/2014 | 7/15/2014 | A | NR |
Jim Sly
|
|
|
Joe Phone #: ###-#### Need Electr and Mech finals.
|
BLD-Wall cover | 5/14/2014 | 5/15/2014 | 5/15/2014 | A | PASS |
Jim Sly
|
|
|
Joe Phone #: ###-#### Energy code pass
|
BLD-Framing/Rough-in | 5/12/2014 | 5/13/2014 | 5/13/2014 | A | PASS |
Jim Sly
|
|
|
Joe Phone #: ###-#### and energy code inspection also please
|
BLD-Conference | 4/17/2014 | 4/17/2014 | 4/17/2014 | P | DONE |
Jim Sly
|
|
|
Steve Phone #: ###-####
|
BLD-Footing | 3/28/2014 | 3/28/2014 | 3/28/2014 | P | PASS |
Mike Jordan
|
|
|
Joe or ###-#### Steve-Please call at least 30 mins prior to inspection Phone #: ###-####
|
Routing Walk-In (BLD) | 3/18/2014 | 3/18/2014 | 3/18/2014 | P | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 3/18/2014 | 3/18/2014 | 3/18/2014 | | PASS |
Perry Paine
|
|
|
|
Application received | | 3/17/2014 | 3/18/2014 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/18/2014 | | |
|
|
|
|
1st review completed | | | 3/18/2014 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/18/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/18/2014 | | DONE |
Tisha Gallop
|
|
|
|
Issue PAID IN FULL permit | | | 3/18/2014 | | DONE |
Tisha Gallop
|
|
|
|
Routing Walk-In (Zoning) | 3/17/2014 | 3/17/2014 | 3/17/2014 | P | DONE |
Leon Letson
|
|
|
|
Routing Walk-In (BLD) | 3/17/2014 | 3/17/2014 | 3/17/2014 | P | FAIL |
Carl D Madsen
|
|
|
The plan sheets do not match with the engineering. CDM
|
1st review completed | | | 3/17/2014 | | FAIL |
|
|
|
|