Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD14-00613
StatusIssued
Name ALTA CONSTRUCTION
Site Address 1325 W IDAHO ST
Project NameIdaho Power Plaza 2
Customer Number 
ePlanReviewYes
Description
(IDAHO POWER)(PLAZA 2) Permit to renovate the interior and exterior of the existing Idaho Power Plaza 2 Office Building per approved plans. Work to include minor demolition of interior and exterior as shown on the plans. Structural work to include new exterior openings, roof top openings, interior columns, footings and shear frames. Special inspection per submitted form 310. Interior of building renovation includes new finish material compliant with finish materials in chapter 8, IBC. Scope of work to include the mechanical/ electrical room to be enlarged, 5 conference rooms, 2 offices, break room, document storage, vending area, mothers room and restrooms to have framed or enclosed walls. New windows and awnings to be installed. This building is NOT fire sprinklered.**ajs**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Telephone call  12/29/2015 DONE
left a message about scheduling a final inspection
Zoning Approval11/10/201411/10/201411/10/2014 DONE
DetailsAndrea Tuning
BLD-Final11/4/201411/5/201411/5/2014PPEND
DetailsDave Hannah
Jeremy Phone #: ###-#### ok for temp occ needs other trades to go perm and install ada hand rails and add ext on gaurd rail
Print Occupancy Form  11/4/2014 DONE
DetailsChristina Prado
Print Occupancy Form  11/4/2014 DONE
DetailsChristina Prado
FIRE-Final Inspection10/31/201411/3/201411/3/2014PPASS
DetailsForrest France
Previous correction items are finished with the exception of building address numbers, new EM light at the restroom hallway needs repaired. Items to be completed prior to structural final as discussed. Note: *no signature card available on site at the time of inspection.
BLD-Final10/30/201410/31/201410/31/2014PNR
DetailsTony Young
walk through only - Jeremy Phone #: ###-####,, need rail up
FIRE-Final Inspection10/30/201410/31/201410/31/2014PPART
DetailsCraig D. Hanson
1.Exit sign on main door needs to be installed. 2. bug eyes need added in back hallway by restrooms 3. verbal verification of smoke detector in HVAC units working.
BLD-Ceiling Grid Inspection10/29/201410/30/201410/30/2014APASS
DetailsTony Young
Jeremy Phone #: ###-####
BLD-Ceiling Grid Inspection10/29/201410/29/201410/29/2014PPASS
DetailsTony Young
Jeremy Phone #: ###-####
FIRE-Final Inspection10/23/201410/24/201410/24/2014PDONE
DetailsForrest France
Inspection request intended for an on site conference regarding fire life safety conditions and requirements. Discussed door hardware, fire extinguishers, exit signs and EM lights, HVAC duct SD, premise identification, approved plan set, review notes, etc.
BLD-Energy code compliance9/9/20149/9/20149/9/2014PPASS
DetailsTony Young
Jeremy Phone #: ###-####,, all mechanical will be left open,, ok to cover walls
BLD-Energy code compliance9/8/20149/9/20149/9/2014ACANC
DetailsTony Young
Jeremy Phone #: ###-####
BLD-Energy code compliance9/8/20149/8/20149/8/2014PPART
DetailsTony Young
Jeremy Phone #: ###-####,, work in progress,, ok so far
BLD-Framing/Rough-in9/4/20149/4/20149/4/2014PPART
DetailsTony Young
Jeremy Phone #: ###-####,, ok to insulate and one side the walls
BLD-Framing/Rough-in9/3/20149/4/20149/4/2014ANR
DetailsTony Young
Jeremy Phone #: ###-####
BLD-Framing/Rough-in9/3/20149/4/20149/4/2014ANR
DetailsTony Young
Jeremy Phone #: ###-####
BLD-Framing/Rough-in9/2/20149/3/20149/3/2014PNR
DetailsTony Young
Jeremy Phone #: ###-####
BLD-Footing8/25/20148/26/20148/26/2014APASS
DetailsDave Hannah
Jeremy Phone #: ###-####
BLD-Concrete5/29/20145/29/20145/29/2014PPART
DetailsTony Young
Jeremy Phone #: ###-####,, interior ftgs,, rebar to be added to "f-1" footings
Issue PAID IN FULL permit  5/14/2014 DONE
DetailsChristina Prado
Print Occupancy Form  5/14/2014 DONE
DetailsChristina Prado
OVERRIDE  5/12/2014  
Permit Ready to Issue  5/12/2014 DONE
DetailsTisha Gallop
Plan assigned to (AJS)4/3/20144/3/20145/8/2014 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed Due 4-29 Level 3 TI - ePlanReview - Idaho Power Plaza 2
PLANS/APPL TAKEN TO FRONT DESK  5/8/2014 DONE
Routing - Erosion and Sediment5/7/2014 5/8/2014 PASS
DetailsEvan Jenkins
signed off in e plan
Routing - PLAN CHECK5/7/2014 5/7/2014 PASS
DetailsAdele J Schaffeld-Griffin
Routing - Erosion and Sediment4/3/2014 5/6/2014 FAIL
DetailsEvan Jenkins
Some minor concrete work shown on structural plans.
ESC Waiver Request Required
2nd Review: No ESC Waiver Again
1st review completed  4/28/2014 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - PLAN CHECK4/3/2014 4/28/2014 FAIL
DetailsAdele J Schaffeld-Griffin
see comments in e plan
Routing - FIRE4/3/20144/3/20144/10/2014 PASS
DetailsCraig D. Hanson
See Fire Plan Review 04-10-14
Routing - PLUMBING4/3/2014 4/7/2014 PASS
DetailsBill VanDegrift
Per plan and ISPC.
Routing PW Sewer Rating4/3/2014 4/7/2014 PASS
DetailsConnie Baumgartner
Pending Assignment by JCB4/3/2014 4/3/2014 DONE
DetailsJason Blais
Routing - Design Review4/3/2014 4/3/2014 PASS
DetailsAndrea Tuning
Andrea Tuning - DRH14-00051
Routing - Addressing4/3/2014 4/3/2014 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS4/3/2014 4/3/2014 PASS
DetailsBeverly Mountain
Intake Approval  4/2/2014 PASS
DetailsJason Blais
Prescreen approved by Sam Zahorka on 3/20/14. Plan Review Fees paid on 4/2/14.
Application received  3/17/2014 DONE
Application submitted via PDS Online on Mar 17 2014 3:42PM