Telephone call | | | 12/29/2015 | | DONE |
|
|
|
left a message about scheduling a final inspection
|
Zoning Approval | 11/10/2014 | 11/10/2014 | 11/10/2014 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Final | 11/4/2014 | 11/5/2014 | 11/5/2014 | P | PEND |
Dave Hannah
|
|
|
Jeremy Phone #: ###-#### ok for temp occ needs other trades to go perm and install ada hand rails and add ext on gaurd rail
|
Print Occupancy Form | | | 11/4/2014 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 11/4/2014 | | DONE |
Christina Prado
|
|
|
|
FIRE-Final Inspection | 10/31/2014 | 11/3/2014 | 11/3/2014 | P | PASS |
Forrest France
|
|
|
Previous correction items are finished with the exception of building address numbers, new EM light at the restroom hallway needs repaired. Items to be completed prior to structural final as discussed. Note: *no signature card available on site at the time of inspection.
|
BLD-Final | 10/30/2014 | 10/31/2014 | 10/31/2014 | P | NR |
Tony Young
|
|
|
walk through only - Jeremy Phone #: ###-####,, need rail up
|
FIRE-Final Inspection | 10/30/2014 | 10/31/2014 | 10/31/2014 | P | PART |
Craig D. Hanson
|
|
|
1.Exit sign on main door needs to be installed. 2. bug eyes need added in back hallway by restrooms 3. verbal verification of smoke detector in HVAC units working.
|
BLD-Ceiling Grid Inspection | 10/29/2014 | 10/30/2014 | 10/30/2014 | A | PASS |
Tony Young
|
|
|
Jeremy Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 10/29/2014 | 10/29/2014 | 10/29/2014 | P | PASS |
Tony Young
|
|
|
Jeremy Phone #: ###-####
|
FIRE-Final Inspection | 10/23/2014 | 10/24/2014 | 10/24/2014 | P | DONE |
Forrest France
|
|
|
Inspection request intended for an on site conference regarding fire life safety conditions and requirements. Discussed door hardware, fire extinguishers, exit signs and EM lights, HVAC duct SD, premise identification, approved plan set, review notes, etc.
|
BLD-Energy code compliance | 9/9/2014 | 9/9/2014 | 9/9/2014 | P | PASS |
Tony Young
|
|
|
Jeremy Phone #: ###-####,, all mechanical will be left open,, ok to cover walls
|
BLD-Energy code compliance | 9/8/2014 | 9/9/2014 | 9/9/2014 | A | CANC |
Tony Young
|
|
|
Jeremy Phone #: ###-####
|
BLD-Energy code compliance | 9/8/2014 | 9/8/2014 | 9/8/2014 | P | PART |
Tony Young
|
|
|
Jeremy Phone #: ###-####,, work in progress,, ok so far
|
BLD-Framing/Rough-in | 9/4/2014 | 9/4/2014 | 9/4/2014 | P | PART |
Tony Young
|
|
|
Jeremy Phone #: ###-####,, ok to insulate and one side the walls
|
BLD-Framing/Rough-in | 9/3/2014 | 9/4/2014 | 9/4/2014 | A | NR |
Tony Young
|
|
|
Jeremy Phone #: ###-####
|
BLD-Framing/Rough-in | 9/3/2014 | 9/4/2014 | 9/4/2014 | A | NR |
Tony Young
|
|
|
Jeremy Phone #: ###-####
|
BLD-Framing/Rough-in | 9/2/2014 | 9/3/2014 | 9/3/2014 | P | NR |
Tony Young
|
|
|
Jeremy Phone #: ###-####
|
BLD-Footing | 8/25/2014 | 8/26/2014 | 8/26/2014 | A | PASS |
Dave Hannah
|
|
|
Jeremy Phone #: ###-####
|
BLD-Concrete | 5/29/2014 | 5/29/2014 | 5/29/2014 | P | PART |
Tony Young
|
|
|
Jeremy Phone #: ###-####,, interior ftgs,, rebar to be added to "f-1" footings
|
Issue PAID IN FULL permit | | | 5/14/2014 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 5/14/2014 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 5/12/2014 | | |
|
|
|
|
Permit Ready to Issue | | | 5/12/2014 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (AJS) | 4/3/2014 | 4/3/2014 | 5/8/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed Due 4-29 Level 3 TI - ePlanReview - Idaho Power Plaza 2
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/8/2014 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 5/7/2014 | | 5/8/2014 | | PASS |
Evan Jenkins
|
|
|
signed off in e plan
|
Routing - PLAN CHECK | 5/7/2014 | | 5/7/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - Erosion and Sediment | 4/3/2014 | | 5/6/2014 | | FAIL |
Evan Jenkins
|
|
|
Some minor concrete work shown on structural plans.
ESC Waiver Request Required
2nd Review: No ESC Waiver Again
|
1st review completed | | | 4/28/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 4/3/2014 | | 4/28/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
see comments in e plan
|
Routing - FIRE | 4/3/2014 | 4/3/2014 | 4/10/2014 | | PASS |
Craig D. Hanson
|
|
|
See Fire Plan Review 04-10-14
|
Routing - PLUMBING | 4/3/2014 | | 4/7/2014 | | PASS |
Bill VanDegrift
|
|
|
Per plan and ISPC.
|
Routing PW Sewer Rating | 4/3/2014 | | 4/7/2014 | | PASS |
Connie Baumgartner
|
|
|
|
Pending Assignment by JCB | 4/3/2014 | | 4/3/2014 | | DONE |
Jason Blais
|
|
|
|
Routing - Design Review | 4/3/2014 | | 4/3/2014 | | PASS |
Andrea Tuning
|
|
|
Andrea Tuning - DRH14-00051
|
Routing - Addressing | 4/3/2014 | | 4/3/2014 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 4/3/2014 | | 4/3/2014 | | PASS |
Beverly Mountain
|
|
|
|
Intake Approval | | | 4/2/2014 | | PASS |
Jason Blais
|
|
|
Prescreen approved by Sam Zahorka on 3/20/14. Plan Review Fees paid on 4/2/14.
|
Application received | | | 3/17/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 17 2014 3:42PM
|