BLD-Final | 3/21/2014 | 3/21/2014 | 3/21/2014 | P | PASS |
Dave Hannah
|
|
|
brad - call 15 mins prior to meet Phone #: ###-####
|
FIRE-Final Inspection | 3/20/2014 | 3/21/2014 | 3/21/2014 | A | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
FIRE-Final Inspection | 3/20/2014 | 3/21/2014 | 3/21/2014 | A | PASS |
Forrest France
|
|
|
Fire life safety inspection passed.
|
Permanent Occupancy | | | 3/21/2014 | | DONE |
Barbara Stitt
|
|
|
|
Issue PAID IN FULL permit | | | 3/20/2014 | | DONE |
|
|
|
|
Application received | | 3/19/2014 | 3/19/2014 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/19/2014 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/19/2014 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (TLW) | 3/19/2014 | | 3/19/2014 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 3/19/2014 | | 3/19/2014 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 3/19/2014 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/19/2014 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 3/19/2014 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 3/19/2014 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 3/19/2014 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 3/19/2014 | | DONE |
Tisha Gallop
|
|
|
called Brad Smith/Babcock Design Group and left vm permit is ready.
|
First Notice | | 3/31/2014 | | | |
|
|
|
|