BLD-Final | 12/2/2014 | 12/3/2014 | 12/3/2014 | A | PASS |
Jim Sly
|
|
|
call before // Allen Phone #: ###-####
|
DOC - Permit Finaled | 12/3/2014 | 12/3/2014 | 12/3/2014 | P | PASS |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 5/30/2014 | 5/30/2014 | 5/30/2014 | P | PASS |
Jim Sly
|
|
|
Allen-call to get access Phone #: ###-#### Frame and Energy.......OK.
|
CHANGE STATUS TO (ISS) | | | 5/30/2014 | | DONE |
Candy A. Nichols
|
|
|
as per 408 change back to iss. was finaled by mistake
|
BLD-Framing/Rough-in | 4/14/2014 | 4/14/2014 | 4/14/2014 | P | CANC |
Tom Arcoraci
|
|
|
|
BLD-Wall Bracing | 4/14/2014 | 4/14/2014 | 4/14/2014 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 4/14/2014 | 4/14/2014 | 4/14/2014 | P | CANC |
Tom Arcoraci
|
|
|
Cecil Phone #: ###-####
|
DOC - Permit Finaled | 4/14/2014 | 4/14/2014 | 4/14/2014 | P | CANC |
Tom Arcoraci
|
|
|
(This activity was added in error so we have changed the case status back to Issued.)
|
BLD-Footing | 3/27/2014 | 3/28/2014 | 3/28/2014 | A | PASS |
Tom Arcoraci
|
|
|
andy Phone #: ###-####
|
OVERRIDE | | | 3/24/2014 | | |
|
|
|
|
Application received | | 3/24/2014 | 3/24/2014 | | DONE |
Barbara Stitt
|
|
|
|
Routing Walk-In (Zoning) | 3/24/2014 | 3/24/2014 | 3/24/2014 | A | DONE |
Leon Letson
|
|
|
|
Routing Walk-In (BLD) | 3/24/2014 | 3/24/2014 | 3/24/2014 | A | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 3/24/2014 | 3/24/2014 | 3/24/2014 | | PASS |
Perry Paine
|
|
|
|
Inspection Record Card- Bld | | | 3/24/2014 | | |
|
|
|
|
1st review completed | | | 3/24/2014 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/24/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/24/2014 | | DONE |
Tisha Gallop
|
|
|
|
Issue PAID IN FULL permit | | | 3/24/2014 | | DONE |
Tisha Gallop
|
|
|
|