Permit Information
Permit NumberBLD14-00681
StatusFinaled
Name MCALVAIN CONSTRUCTION INC
Site Address 1570 S LUSK PL
Project NameLusk Place Apartments
Customer Number 
ePlanReviewYes
Description
VISTA WEST (formerly known as Lusk Apartments) - This permit if for the tenant finish of the approximate 85,500 sq. ft. first floor parking garage and office areas and to construct a three story apartment building above a three-hour fire-resistive concrete structural podium. The first story garage is constructed of concrete and is Type 1A construction. The apartment building is constructed of wood frame one-hour fire-resistive construction. The apartment building is being divided by a two-hour fire-resistive fire wall, area one is approximately 58,500 sq. ft. and area two is approximately 103,435 sq. ft.. The second floor has approximately 5,385 square feet of community activity areas and an approximate 2,275 sq. ft. outdoor patio area. The fire wall also functions as a horizontal exit to satisfy travel distance requirements. This building is fully fire sprinklered with an NFPA 13 sprinkler system. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance/Occupancy  8/1/2016 DONE
Letter of compliance/Occupancy  7/22/2016 DONE
Telephone call  6/29/2016 DONE
called Michelle about past due amount-was transferred to Steve (CO) he asked me to email me the statemnets so he can pay them online
Print Statement  6/29/2016 DONE
sent statement so Steve (CO)
Print Statement  6/9/2016 DONE
Print Statement  4/14/2016 DONE
Stamped past due
Print Statement  4/1/2016 DONE
Print Statement  12/22/2015 DONE
Permanent Occupancy  12/8/2015 DONE
BLD-Final12/4/201512/7/201512/7/2015APASS
DetailsJim Storey
would like call ahead; Abel Phone #: ###-#### f offinal ok pending fire sign
Zoning Approval12/4/201512/4/201512/4/2015 DONE
DetailsAndrea Tuning
Case Summary (BLD)  11/20/2015 DONE
Temporary Occupancy11/6/20152/4/201611/6/2015 DONE
DetailsCandy A. Nichols
BLD-Aging Inspection10/28/201510/28/201510/28/2015 DEFR
DetailsJim Storey
pending fire c/n///Test of the area of refuge emergency communication system. Floors 1 thru 3 tested satisfactorily, however floor # 4 did not call out. Contractor agreed to trouble shoot problem and will schedule a final inspection when corrected
Meeting  10/6/2015 DONE
DetailsScott Arellano
Meeting with Boise Fire Department. Prior to Final sign off of project:

1) Two additional "No Parking Fire Lane Signs" will be required along the east side of Lusk street.

2) Two wall hyrant connections with appropriate placards shall be installed at the northeast and south east locations.
FIRE-Final Inspection10/3/201512/7/201510/3/2015APASS
DetailsThomas Walsh
I went by Lusk St. Apts and we tested the one remaining area of refuge comm. system panel (4th floor) that did not work last visit , and that worked – so this system is completed for this building. Tom Walsh
FIRE-Final Inspection8/28/20158/28/20158/28/2015PFAIL
DetailsThomas Walsh
Test of the area of refuge emergency communication system. Floors 1 thru 3 tested satisfactorily, however floor # 4 did not call out. Contractor agreed to trouble shoot problem and will schedule a final inspection when corrected.
PubWorks Occupancy Approval8/14/20158/14/20158/14/2015 DONE
DetailsTiffany Lowery
FIRE-Final Inspection8/10/20158/10/20158/10/2015PDONE
DetailsThomas Walsh
Reinspection to confirm two (2) added no parking signs for fire access road. Also completed inspection of fire sprinkler punchlist items. ROCs docs to be completed when ready.
FIRE-Final Inspection8/7/20158/7/20158/7/2015PPASS
DetailsThomas Walsh
Final FireLife-Safety inspection. Fire sprinklers and fire alarm systems signed off. Exit signage and EM lighting completed. EVAC signs posted in elevator lobbies. Fire access road completed on south side of building. Need to add two (2) addtional "No Parking" signs for cul-de-sac that leads into the fire access road. Fire extinguishers located throughout.
NOTE: Per BO email, elevator lobbies not longer required per latest ICC interp.
Signed off Bldg. Permit inspection card for full occupancy.
BLD-Final8/7/20158/7/20158/7/2015PPART
DetailsJim Storey
temp occ. ok c/n on site for perm
Temporary Occupancy8/7/201511/5/20158/7/2015 DONE
DetailsChristina Prado
Zoning Approval Temp8/7/20158/7/20158/7/2015 DONE
DetailsAndrea Tuning
Temporary approval has been provided with a bond. The bond is for the required bicycle parking, the unfinished landscaping, the unfinished exterior painting and the rooftop mechanical screens.
BLD-Final8/6/20158/6/20158/6/2015PNR
DetailsJim Storey
Jose Phone #: ###-####
FIRE-Final Inspection8/6/20158/6/20158/6/2015PPART
DetailsThomas Walsh
Fire life satey inspection to test new exit signs installed on floors 2-4 to improve egress signage. Also looked at EM lights that were repositioned to improve lighting along the pathway.
Fire lane and signage for the fire access road on the south side not completed yet.
Also had two (2) portable BBQ units removed from the clubhouse patios, as these are not permitted for R2 buildings of Type V constuction.
FIRE-Final Inspection8/5/20158/5/20158/5/2015PPART
DetailsThomas Walsh
Final fire life-safety inspection for apartment building. Tested some new exit signs added to clarify egress paths in some areas. Also retested some emerg. lights that were not working last visit. Tested last dry pipe fire sprinkler system, that failed last test. All fire sprinklers are fully tested, however some systems are still shutdown as some painted heads have to be changed out. The fire alarm system has been fully tested however, it is not being monitored off-site because of the fire sprinkler work being done.
I have approved TCO for staff only personel to work in the leasing office only. I have not approved TCO for any use of the building for public use, access for residents, or for any overnight stays.
BLD-Final8/4/20158/4/20158/4/2015PPART
DetailsJim Storey
Jose Phone #: ###-#### stair enclosers ok/ pending sign offs
BLD-Final7/30/20157/30/20157/30/2015PFAIL
DetailsJim Storey
Jose Phone #: ###-#### stair b hardware to outside smoke seal both doors leval 1//stair a 4th and 2 not latching level 1 smoke seal screwed closed and need hardware//stair c 1 level smoke seals/ 4th floor no latch// stair d smoke seal screwed shut no hardware. clean all exit sys.elvator machine rm snoke seal and fire chalk top of wall and holes.
BLD-Ceiling Grid Inspection7/28/20157/29/20157/29/2015APASS
DetailsJim Storey
Jose Phone #: ###-####
BLD-Ceiling Grid Inspection7/20/20157/21/20157/21/2015APASS
DetailsJim Storey
Jose Phone #: ###-####
BLD-Ceiling Grid Inspection7/20/20157/20/20157/20/2015PPASS
DetailsJim Storey
Jose Phone #: ###-#### level 4 1&2
BLD-Ceiling Grid Inspection7/8/20157/8/20157/8/2015PCANC
DetailsJim Storey
Jose Phone #: ###-#### lev 2/3 sec 2/3
BLD-Ceiling Grid Inspection6/22/20156/23/20156/23/2015PPASS
DetailsJim Storey
Jose Phone #: ###-#### as noted in office sign off
BLD-Other6/8/20156/8/20156/8/2015PPART
DetailsJim Storey
sofits; Jose Phone #: ###-#### ceilling ok pool house area.
BLD-Ceiling Grid Inspection6/5/20156/5/20156/5/2015APASS
DetailsJim Storey
Level 2, Section 1 - Jose Phone #: ###-#### and first floor insulation and grid ok
BLD-Ceiling Grid Inspection6/4/20156/4/20156/5/2015PDEFR
DetailsDave Hannah
Level 2, Section 1 - Jose Phone #: ###-#### out of time reschduled this for jim 6/5
BLD-Framing/Rough-in5/20/20155/21/20155/21/2015PNR
DetailsJim Storey
Soffit framing, level 4 section 3 - Jose Phone #: ###-####
BLD-Framing/Rough-in5/20/20155/21/20155/21/2015APASS
DetailsJim Storey
Soffit framing, level 4 section 2 - Jose Phone #: ###-####
BLD-Framing/Rough-in5/15/20155/15/20155/15/2015PPASS
DetailsJim Storey
Jose-level 4 section 1 Phone #: ###-#### soffits ok
BLD-Energy code compliance5/12/20155/12/20155/12/2015PPASS
DetailsJim Storey
Jose Phone #: ###-####club house ok insulation ok to cover.
BLD-Framing/Rough-in5/7/20155/8/20155/8/2015APASS
DetailsJim Storey
soffits/ 3 an4 2hr corridor wall penatrations ok Jose// level 3-section 3 Phone #: ###-####
BLD-Framing/Rough-in5/5/20155/5/20155/5/2015PPASS
DetailsJim Storey
Jose-section 3 level 2-sofit framing Phone #: ###-#### club house exterior framing ok paretpet.
BLD-Energy code compliance4/30/20155/1/20155/1/2015APASS
DetailsJim Storey
Insulation // Jose Phone #: ###-#### sec 2 /3 level 4
BLD-Energy code compliance4/27/20154/28/20154/28/2015APASS
DetailsJim Storey
Jose-level 4 area 1 Phone #: ###-####
BLD-Framing/Rough-in4/23/20154/24/20154/24/2015PPASS
DetailsJim Storey
Jose-soffits-section 2 level 3 Phone #: ###-####and shafts
BLD-Energy code compliance4/22/20154/22/20154/22/2015PPASS
DetailsJim Storey
Area 3, level 3 - Jose Phone #: ###-####
BLD-Framing/Rough-in4/16/20154/17/20154/17/2015APASS
DetailsJim Storey
John-level 2 area 2 Phone #: ###-#### drops ok to cover
BLD-Energy code compliance4/13/20154/14/20154/14/2015PPASS
DetailsJim Storey
Insulations // Jose Phone #: ###-####sec3 2 floor fire chalk ok/ 3fl insulation ok
BLD-Energy code compliance4/13/20154/13/20154/13/2015PPASS
DetailsJim Storey
Insulation // Jose Phone #: ###-#### sec 123 floor 4 exterior walls
BLD-Framing/Rough-in4/13/20154/13/20154/13/2015PPASS
DetailsJim Storey
Insulation // Jose Phone #: ###-#### sec 123 floor 4 pass
BLD-Energy code compliance4/8/20154/9/20154/9/2015APASS
DetailsJim Storey
Jose Phone #: ###-#### drops 1sec3rdfloor
BLD-Framing/Rough-in4/7/20154/7/20154/7/2015PPASS
DetailsJim Storey
- Jose Phone #: ###-#### elavator lobby/ libary rm/ stair enclosers ok to cover
BLD-Energy code compliance4/6/20154/7/20154/7/2015APASS
DetailsJim Storey
Jose Phone #: ###-#### 3 sec 2nd floor
BLD-Framing/Rough-in4/1/20154/2/20154/2/2015APASS
DetailsJim Storey
Jose Phone #: ###-####exterior walls sec3/2 &3 floors/ shaft ok to cover trash shoot.
BLD-Framing/Rough-in3/23/20153/24/20153/24/2015ANR
DetailsJim Storey
lvl 2 area 1 soffit framing- Jose Phone #: ###-####
BLD-Energy code compliance3/19/20153/20/20153/23/2015PPASS
DetailsJim Storey
Jose Phone #: ###-####sec2 fl2
BLD-Framing/Rough-in3/16/20153/16/20153/16/2015PPASS
DetailsJim Storey
Jose Phone #: ###-#### 2nd sec 1 and 2 frame ok
BLD-Framing/Rough-in3/12/20153/12/20153/13/2015PPASS
DetailsJim Storey
Jose Phone #: ###-####1st floor office area ok to cover
BLD-Energy code compliance3/4/20153/5/20153/5/2015PPASS
DetailsJim Storey
insulation // Jose Phone #: ###-####sec 1 floor 3 ok to cover
BLD-Framing/Rough-in3/2/20153/3/20153/3/2015APART
DetailsJim Storey
Jose Phone #: ###-#### clubhouse roof deck ok will check blk. on perimitor from under deck.
BLD-Framing/Rough-in2/26/20152/27/20152/27/2015APASS
DetailsJim Storey
Jose-section 1 level 3 Phone #: ###-####
BLD-Framing/Rough-in2/24/20152/25/20152/25/2015APASS
DetailsJim Storey
Jose-level 3 section 2 Phone #: ###-#### exterior airseal ok/ 1st floor b occ framing ok.
BLD-Framing/Rough-in2/23/20152/23/20152/23/2015PPASS
DetailsJim Storey
Jose Phone #: ###-#### elavator ok to cover
BLD-Energy code compliance2/23/20152/23/20152/23/2015PPASS
DetailsJim Storey
Jose Phone #: ###-####exterior air sealsec2 all/238 237 240 239
BLD-Energy code compliance2/19/20152/20/20152/20/2015PPASS
DetailsJim Storey
Section 1 Level 2 // Jose Phone #: ###-####
BLD-Framing/Rough-in2/17/20152/18/20152/18/2015APART
DetailsJim Storey
Jose-Section 1 2nd floor Phone #: ###-#### c/n posted/riser in coridor gyp ok
BLD-Framing/Rough-in2/17/20152/17/20152/17/2015PDEFR
DetailsJim Storey
Jose-Section 1 2nd floor Phone #: ###-#### out of time defr. ot am
BLD-Framing/Rough-in2/10/20152/11/20152/11/2015APASS
DetailsJim Storey
Jose Phone #: ###-#### 4th floor sec 1 exterior walls ok to insulate
BLD-Wall Bracing2/3/20152/3/20152/3/2015PPART
DetailsJim Sly
Jose-roofing & exterior walls Phone #: ###-####
Roof deck nailing and fire resistive ply at 2 hr walls......Sect 3......level 3 OK. Anchor bolts/ hold down bolts, nuts and washers at exterior walls of Sect.3..... level 2 and 3 OK........ except for 6 nuts not tightened on anchor bolts ......room 236 ext wall level 2.......OK to insulate. (Electr OKd). Steel stud framing OK level 1 (Garage)........OK to cover Ext.
BLD-Other1/21/20151/21/20151/21/2015PPASS
DetailsJim Storey
roof decking// Jose Phone #: ###-#### sec 2 ok// corridors 234 sec ok to prerock.
BLD-Wall Bracing1/9/20151/12/20151/12/2015PPASS
DetailsJim Storey
Jose-sheathing for the roof Phone #: ###-#### phase 1
Permit Ready to Issue  10/3/2014 DONE
Issue PAID IN FULL permit  10/3/2014 DONE
Print Occupancy Form  10/3/2014 DONE
Routing - MECHANICAL10/2/2014 10/2/2014 PASS
DetailsTroy James
Routing - PLAN CHECK10/2/2014 10/2/2014 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  10/2/2014 DONE
DetailsJohn Menard
Plan assigned to (JCM)7/14/2014 10/2/2014 PASS
DetailsJohn Menard
1st Review Completed 8/19/2014 - Failed 1st Review to allow upload of updated plans.
Routing - PLAN CHECK9/19/2014 9/24/2014 FAIL
DetailsJohn Menard
Routing - PUBLIC WORKS9/19/2014 9/23/2014 PASS
DetailsBeverly Mountain
Routing PW Street Lights9/19/2014 9/23/2014 PASS
DetailsMike D Hedge
Routing PW Sewer Design9/23/2014 9/23/2014 PASS
DetailsKyle S. Rosenmeyer
Routing - MECHANICAL9/19/2014 9/22/2014 FAIL
DetailsTroy James
Equipment schedule needs to show correct tonage with model number and duct smoke detectors.
Routing - PLAN CHECK8/21/2014 9/10/2014 FAIL
DetailsJohn Menard
Routing - MECHANICAL8/25/2014 8/25/2014 FAIL
DetailsTroy James
Previous correction has not been addressed. Still need to show smoke damper to ducts penetrating the corridor assembly.
Routing PW Grading-Hillside8/21/2014 8/25/2014 PASS
DetailsJason C. Taylor
Routing PW Street Lights8/21/2014 8/22/2014 FAIL
DetailsMike D Hedge
Routing - PLANNING8/21/2014 8/22/2014 PASS
DetailsSusan Riggs
Routing - Addressing8/21/2014 8/22/2014 PASS
DetailsJason C. Taylor
see uploaded apartment addresses for details (ePlan). JCT
Routing PW Sewer Design8/21/2014 8/21/2014 FAIL
DetailsKyle S. Rosenmeyer
Sheet C-6 not updated per 7/17 comments.
Routing - Design Review8/21/2014 8/21/2014 PASS
DetailsAndrea Tuning
Routing - MECHANICAL8/13/2014 8/19/2014 FAIL
DetailsTroy James
smoke protection corridor duct penetration
1st review completed  8/19/2014 FAIL
DetailsJohn Menard
Failed 1st Review to allow upload of updated plans
Routing - PLAN CHECK7/14/2014 8/19/2014 FAIL
DetailsJohn Menard
Failed 1st Review to allow upload of updated plans. JCM
Routing PW Grading-Hillside8/7/2014 8/7/2014 PASS
DetailsJason C. Taylor
Retaining wall permit approved under BLD14-01629. JCT
Routing - PLUMBING7/14/2014 7/23/2014 PASS
DetailsDaryl Spivey
1/4 inch per foot grade min. due to fixture loading
Routing Off Site - STRUCTURAL7/14/2014 7/22/2014 PASS
DetailsJohn Menard
Routing - FIRE7/14/20147/14/20147/18/2014 PASS
DetailsScott Arellano
Attached comments to plans. Approved with red-lined annotations.
Routing PW Sewer Design7/14/2014 7/17/2014 FAIL
DetailsKyle S. Rosenmeyer
Install 8" sewer service with Kor-N-Seal Boot to ensure watertight connection with manhole. Re-channel manhole base with 90 degree sweep (show detail if necessary).
Routing PW Environmental7/14/2014 7/16/2014 PASS
DetailsRick Christenson
Routing - Addressing7/14/2014 7/16/2014 FAIL
DetailsJason C. Taylor
Apartment addresses need to be identifed on plans. Room numbers identifed currently do not meet BoiseCity addressing code. Jason Taylor ###-####
Routing - PLANNING7/14/2014 7/15/2014 FAIL
DetailsSusan Riggs
Routing PW Solid Waste7/14/2014 7/15/2014 PASS
DetailsPeter J. McCullough
Routing PW Street Lights7/14/2014 7/15/2014 FAIL
DetailsMike D Hedge
E-mail sent to electrical engineer with list of corrections required.
Routing PW Grading-Hillside7/15/2014 7/15/2014 FAIL
DetailsJason C. Taylor
Need retaining wall application approval prior to approval of building permit. Jason Taylor ###-####
Route to Impact Fee Review7/14/20147/17/20147/14/2014 PASS
DetailsCindy M. Gould
Routing PW Sewer Rating7/14/2014 7/14/2014 PASS
DetailsBeverly Mountain
Pending Assignment by JCM7/14/2014 7/14/2014 DONE
DetailsJohn Menard
Intake Approval  7/14/2014 PASS
DetailsJohn Menard
Routing - PUBLIC WORKS7/14/2014 7/14/2014 PASS
DetailsBeverly Mountain
Routing - Erosion and Sediment7/14/2014 7/14/2014 PASS
DetailsAndy J. Long
Project covered under active ESC permit. Reference ESC14-00212.
Routing - Design Review7/14/2014 7/14/2014 FAIL
DetailsAndrea Tuning
The applicant has not obtained Design Review approval for the revised elevations. The DR application is scheduled for August 13, 2014 with staff recommending additional changes.
Intake Approval  6/30/2014 FAIL
DetailsTim L. Woodard
Brett,

Please address all redlines on submittal checklist. Upload revised plans and documents and then sign off on your task for a rereview.

Best regards,

Tim Woodard
Plans Examiner II / City of Boise
###-####
twoodard@cityofboise.org

Application received  3/24/2014 DONE
Application submitted via PDS Online on Mar 24 2014 3:37PM