Permit Information
Permit NumberBLD14-00700
StatusFinaled
Name ASPEN CONSTRUCTION LLC
Site Address 3077 S BOWN WAY
Project NameTempleton T.I.
Customer Number 
ePlanReviewYes
Description
(TEMPLETON)Permit for the first time tenant in a 1,093 sq ft vanilla tenant space. The building was constructed under BLD03-02288. Scope of work to include; new nonbearing noncombustible walls creating waiting area, reception area, open office space, conference room, one ADA restroom, coffee bar area. Plumbing, mechanical and electrical scope of work to be permitted. Interior finish material shall meet the requirements of IBC chapter 8. NOTE: This building is fully fire sprinklered per NFPA 13 and is being used for occupancy separation reduction and fire flow. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **ajs**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 9/5/20149/11/2014 DONE
DetailsChristina Prado
completed 9-11-14
First Notice 8/10/20148/26/2014 DONE
BLD-Final7/30/20147/31/20147/31/2014PPASS
DetailsJim Storey
call before to meet // Norm Jordan Phone #: ###-####
FIRE-Final Inspection7/30/20147/31/20147/31/2014APASS
DetailsForrest France
Fire life safety finaled. Door hardware at the conference room to be revised prior to structural final as discussed 7/30.
Permanent Occupancy  7/31/2014 DONE
DetailsChristina Prado
BLD-Final7/29/20147/30/20147/30/2014PCANC
DetailsJim Storey
Norm Phone #: ###-####-pleae call to meet fire called c/n will resch.
FIRE-Final Inspection7/29/20147/30/20147/30/2014APART
DetailsForrest France
Items needed prior to final include; install remainder of drop ceiling at the IT closet per keynote #5, provide approved hardware at the new conference room door, post tenant space address numbers.
Print Occupancy Form  5/12/2014 DONE
DetailsChristina Prado
Permit Ready to Issue  5/12/2014 DONE
DetailsChristina Prado
Issue PAID IN FULL permit  5/12/2014 DONE
DetailsChristina Prado
Plan assigned to (AJS)4/23/20144/23/20145/6/2014 PASS
DetailsAdele J Schaffeld-Griffin
Due 5/6 Templetion TI
Routing - PLAN CHECK4/23/2014 5/6/2014 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed  5/6/2014 DONE
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  5/6/2014 DONE
Routing - Design Review4/23/2014 4/24/2014 PASS
DetailsSarah Schafer
Routing PW Sewer Rating4/23/2014 4/24/2014 PASS
DetailsConnie Baumgartner
Intake Approval  4/23/2014 PASS
DetailsAdele J Schaffeld-Griffin
Routing - Addressing4/23/2014 4/23/2014 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS4/23/2014 4/23/2014 PASS
DetailsBeverly Mountain
Application received  3/25/2014 DONE
Application submitted via PDS Online on Mar 25 2014 3:20PM