Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD14-00709
StatusFinaled
Name ESI
Site Address 800 W MAIN ST Unit: 1800
Project Name8th and Main Suite 1800
Customer Number 
ePlanReviewNo
Description
(OBSERVATION DECK – 8th & Main Building – Suite # 1800) This building is sprinklered to comply as a high-rise building. Permit is to build out for the first time a 696 square foot limited use private observation area under the spire. This project has a specific alternate to allow very limited use and occupancy of no more than 10 occupants (to be posted - Alternate attached). Work is to include: construction of exterior stairway, installation of new exit signs / emergency lighting, and new interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 9/3/201410/9/2014 DONE
This permit finaled on the web by Adam Johnson
Second Notice 7/27/20148/29/2014 DONE
e-mailed to Adam Johnson
First Notice 7/4/20147/17/2014 DONE
faxed 7-17-14
FIRE-Final Inspection6/24/20146/24/20146/24/2014PPASS
DetailsForrest France
Previous items verified for completion. Final walkthrough passed. Fire life safety finaled.
BLD-Final6/24/20146/24/20146/24/2014PPASS
DetailsDave Hannah
Adam Phone #: ###-####
Permanent Occupancy  6/24/2014 DONE
BLD-Final6/19/20146/20/20146/20/2014ADONE
DetailsDave Hannah
Final inspection of Observation Deck. Please contact Adam prior to inspection to coordinate access. Thanks. AKJ. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Final6/20/20146/20/20146/20/2014PPART
DetailsDave Hannah
Final inspection of Observation Deck. Please contact Adam prior to inspection to coordinate access. Thanks. AKJ. Phone #: ###-#### Inspection requested via web by Adam Johnson ok for temp occ
FIRE-Final Inspection6/19/20146/20/20146/20/2014APASS
DetailsForrest France
Fire life safety passed provided exit sign per key note #13 is installed, post 'watch step' sign per key note #15, mount PFE to the wall or column as discussed, designated walkway components to be provided once roofing repairs are finished.
Temporary Occupancy6/20/20149/18/20146/20/2014 DONE
DetailsBarbara Stitt
BLD-Final6/13/20146/13/20146/13/2014ACANC
DetailsDave Hannah
18th Floor Observation Deck Final Inspection Request with Adam Johnson, ESI. Must call adam for Access, ###-####. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
FIRE-Final Inspection6/13/20146/13/20146/13/2014ACANC
DetailsTroy Cobbley
Will reschedule for when the fire alarm can be tested. No inspection was performed.
Issue PAID IN FULL permit  5/30/2014 DONE
DetailsBarbara Stitt
Issue PAID IN FULL permit  5/30/2014 DONE
DetailsBarbara Stitt
Print Occupancy Form  5/30/2014 DONE
DetailsBarbara Stitt
Routing - PLAN CHECK5/29/2014 5/29/2014 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  5/29/2014 DONE
DetailsTim L. Woodard
Case Summary (BLD)  5/29/2014 DONE
DetailsTim L. Woodard
Print Occupancy Form  5/29/2014 DONE
DetailsTisha Gallop
Telephone call  5/29/2014 DONE
DetailsChristina Prado
called Jason to advise permit is ready pending GC form and gave fees due
Permit Ready to Issue  5/29/2014 DONE
DetailsChristina Prado
Plan assigned to (TLW)3/26/2014 5/29/2014 PASS
DetailsTim L. Woodard
Plan resubmittals received  5/15/2014 DONE
DetailsTisha Gallop
received response comments and two copies of plan sheets G100A, A108A, F108A, and stair details on 11"x17" sheets; taken to Tim Woodard
Routing - PLAN CHECK4/7/2014 4/22/2014 FAIL
DetailsTim L. Woodard
Resubmittals reviewed. TLW
Plan resubmittals received  4/17/2014  
Recieved cover letter, two sets of drawings sheets G100A, A108A,F108A,two sets each-plan review response & report, project keying legend, struc cals from CTA & detail fab drawings
Routing - PLANNING4/1/2014 4/7/2014 PASS
DetailsSarah Schafer
In speaking with Jason Butler from CTA, the new stairs will be screened by the parapet, not even visible in flat elevation. Change is approved through the buidling permit without need for further planning review.
Routing - FIRE4/7/2014 4/7/2014 PASS
DetailsCraig D. Hanson
Approved as noted. No separate fire code plan review comments attached.
1st review completed  4/7/2014 FAIL
Failed Plan Check
Routing - PLAN CHECK4/1/2014 4/1/2014 FAIL
DetailsTim L. Woodard
Refer to Plan Review Report for Corrections. TLW
Application received 3/26/20143/26/2014 DONE
Plans ACCEPTED BY PLAN TECH  3/26/2014 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  3/26/2014 DONE
DetailsTisha Gallop