Permit Information
Permit NumberBLD14-00734
StatusFinaled
Name RUSS MCCREA BUILDERS
Site Address 802 W BANNOCK ST STE Unit: 1400
Project NameHoff Buiding
Customer NumberREF BLD14-00664 ALSO
ePlanReviewNo
Description
(TELIC INTERNATIONAL)(HOFF BUILDING - 14TH STORY SHELL - SUITE #1400) . I added the tenant name in and changed the sign off to include a certificate of occupancy per Jenifer. I spoke with Randy Mason the applicant for this permit. When the permit was submitted for review the final lease was not signed for the tenant but was in negotiations. The lease was signed while construction was being completed under the scope of this permit. Randy would like the permit for suite 1400 changed to issue a certificate of occupancy for BLD14-00734 4-30-14 ajs.Fire sprinklers used for high rise. In the past the 12th story, the 14th story, and the 14 story mezzanine have all been one tenant space. To create an office tenant space on the 14th story, including the 14th story mezzanine, separate from the 12th story common area. The 12th story common area was created under permit BLD14-00664. The 14th story will have an occupant load of 9 (1,042 square feet) and the 14th story mezzanine will have an occupant load of 29 (434 square feet). Access to both building stairways is required from the 14th story. One access will be directly to the Northwest stairway. The other access will be down an open stairway to the 12th story and then to the central building stairway. The 14th story mezzanine has one egress stairway down to the 14th story. Work is to include interior nonbearing walls, new interior doors, and exit signs. Every occupant on the 14th story must always have access to both building stairways. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. This is a shell permit and does not establish a Certificate of Occupancy for any tenant. A separate permit is required to establish a Certificate of Occupancy. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 9/3/20149/8/2014 DONE
DetailsChristina Prado
Mailed in 9-8-14
Third Notice 7/14/20148/29/2014 DONE
mailed to Russ Mccrea Builders
Second Notice 6/21/20147/9/2014 DONE
First Notice 5/10/20146/11/2014 DONE
DetailsBarbara Stitt
Mailed 6-11-14
BLD-Final4/29/20144/30/20144/30/2014APASS
DetailsMike Jordan
Russ Phone #: ###-####. ok for perm occ.
FIRE-Final Inspection4/29/20144/30/20144/30/2014APASS
DetailsForrest France
Scope of remodel work at the 14th floor okayed pending door seal at the south exit, provide EM lighting at stair #3. Fire extinguishers are due annual certification next month- elevator machine room PFE is overdue.
Plan Reviewer's activity  4/30/2014 DONE
DetailsAdele J Schaffeld-Griffin
As per Jenifer, called Forest, he is okay to issue the permenate C of O for the 14th floor only. He entered some items that need to be addressed prior to the approval of the other permit on these plans. The contractor Russ Mccrea was in wanting certificate of occupancy. I added the tenant name in and changed the sign off to include a certificate of occupancy per Jenifer. I spoke with Randy Mason the applicant for this permit. When the permit was submitted for review the final lease was not signed for the tenant but was in negotiations. The lease was signed while construction was being completed under the scope of this permit. Randy would like the permit for suite 1400 changed to issue a certificate of occupancy for BLD14-00734 4-30-14 ajs
Case Summary (BLD)  4/30/2014 DONE
DetailsAdele J Schaffeld-Griffin
Permanent Occupancy  4/30/2014 DONE
BLD-Framing/Rough-in4/21/20144/22/20144/22/2014APASS
DetailsDave Hannah
Russ Phone #: ###-####
Plan assigned to (CJW)4/1/20144/1/20144/21/2014 PASS
DetailsCarl Westfall
HOFF BUILDING - 14TH STORY SHELL - Level 3 TI - (15 days - April 18)
Routing - PLAN CHECK4/18/2014 4/21/2014 PASS
DetailsCarl Westfall
Routing - FIRE4/21/2014 4/21/2014 PASS
DetailsCraig D. Hanson
See Fire Plan Report 04-21-14
Routing - PLAN CHECK4/21/2014 4/21/2014 DONE
DetailsCarl Westfall
Routing complete
PLANS/APPL TAKEN TO FRONT DESK  4/21/2014 DONE
Inspection Record Card- Bld  4/21/2014 DONE
DetailsChristina Prado
Permit Ready to Issue  4/21/2014 DONE
DetailsTisha Gallop
Issue PAID IN FULL permit  4/21/2014 DONE
DetailsTisha Gallop
1st review completed  4/18/2014 DONE
Routing - FIRE4/16/2014 4/18/2014 FAIL
DetailsCraig D. Hanson
Resubmital has come in, failed so that I can review new prints
Plan resubmittals received  4/17/2014 DONE
Routing - PLAN CHECK4/1/2014 4/16/2014 PASS
DetailsCarl Westfall
The 12th story has egress and accessibility issues. The 14th story is approved.
Routing - Addressing4/1/2014 4/1/2014 PASS
DetailsJason C. Taylor
Pending Assignment by JCB3/31/2014 4/1/2014 DONE
DetailsJason Blais
Routing PW Sewer Rating4/1/2014 4/1/2014 PASS
DetailsConnie Baumgartner
Application received 3/28/20143/31/2014 DONE
Intake Approval  3/31/2014 PASS
DetailsJason Blais
Prescreen passed by Carl Madsen.
Plans ACCEPTED BY PLAN TECH  3/28/2014 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  3/28/2014 DONE
DetailsTisha Gallop