First Notice | 9/26/2014 | 9/26/2014 | 3/15/2016 | | DONE |
Phil Shearer
|
|
|
This permit finaled on the web by Krista Ratterree
|
BLD-Final | 9/26/2014 | 9/26/2014 | 9/26/2014 | P | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Rhonda Zamagni
|
DOC - Permit Finaled | 9/26/2014 | 9/26/2014 | 9/26/2014 | P | PASS |
Phil Shearer
|
|
|
|
Permit Ready to Issue | | | 9/24/2014 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 9/24/2014 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Bld | | | 9/24/2014 | | DONE |
Christina Prado
|
|
|
|
Expiration Notice | 9/8/2014 | 9/29/2014 | 9/8/2014 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (CDM) | 4/29/2014 | 4/29/2014 | 5/22/2014 | | PASS |
Carl D Madsen
|
|
|
Cell tower antena exchange
First review completed.
|
Routing - PLAN CHECK | 5/22/2014 | | 5/22/2014 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/22/2014 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/29/2014 | | 5/7/2014 | | FAIL |
Carl D Madsen
|
|
|
|
1st review completed | | | 5/7/2014 | | FAIL |
|
|
|
|
Routing - PLANNING | 4/29/2014 | | 5/1/2014 | | PASS |
David Moser
|
|
|
|
Intake Approval | | | 4/29/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Intake Approval | | | 4/23/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Please review the electronic plan submittal requirements at
http://pds.cityofboise.org/media/105041/electronicstandards.pdf
Please refer to the minimum drawing size in the electronic standard requirements
Please provide the stamping areas required in the electronic standard requirements
|
Intake Approval | | | 4/1/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Please review the electronic plan submittal requirements at
http://pds.cityofboise.org/media/105041/electronicstandards.pdf
Please upload each drawing sheet individually with conventional naming A0.0-Cover sheet in the drawing folder
Please refer to the minimum drawing size in the electronic standard requirements
Please provide the stamping areas required in the electronic standard requirements
Please upload the 304 form, completed
Please upload the 518 completed check list
Please upload all documents in the document file.
|
Application received | | | 3/31/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 31 2014 3:03PM
|