First Notice | 9/26/2014 | 9/26/2014 | 3/15/2016 | | DONE |
Jim Sly
|
|
|
This permit finaled on the web by Krista Ratterree
|
BLD-Final | 9/26/2014 | 9/26/2014 | 9/26/2014 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Rhonda Zamagni
|
DOC - Permit Finaled | 9/26/2014 | 9/26/2014 | 9/26/2014 | P | PASS |
Jim Sly
|
|
|
|
Permit Ready to Issue | | | 9/24/2014 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 9/24/2014 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Bld | | | 9/24/2014 | | DONE |
Christina Prado
|
|
|
|
Expiration Notice | 9/8/2014 | 9/29/2014 | 9/8/2014 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (CDM) | 4/30/2014 | 4/30/2014 | 5/19/2014 | | PASS |
Carl D Madsen
|
|
|
cell tower antena replacement
|
1st review completed | | | 5/19/2014 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/19/2014 | | DONE |
|
|
|
|
Routing - PLANNING | 4/30/2014 | | 5/8/2014 | | PASS |
David Moser
|
|
|
|
Routing - PLAN CHECK | 4/30/2014 | | 5/7/2014 | | PASS |
Carl D Madsen
|
|
|
|
Intake Approval | | | 4/30/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Intake Approval | | | 4/23/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Please review the electronic plan submittal requirements at
http://pds.cityofboise.org/media/105041/electronicstandards.pdf
Please refer to the minimum drawing size in the electronic standard requirements
Please provide the stamping areas required in the electronic standard requirements
|
Intake Approval | | | 4/1/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Please review the electronic plan submittal requirements at
http://pds.cityofboise.org/media/105041/electronicstandards.pdf
Please upload each drawing sheet individually with conventional naming A0.0-Cover sheet in the drawing folder
Please refer to the minimum drawing size in the electronic standard requirements
Please provide the stamping areas required in the electronic standard requirements
Please upload the 304 form, completed
Please upload the 518 completed check list
Please upload all documents in the document file.
|
Application received | | | 3/31/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 31 2014 3:35PM
|