Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD14-00772
StatusFinaled
Name MCALVAIN CONSTRUCTION INC
Site Address 1105 S LA POINTE ST
Project NameWest Sherwood Apartments
Customer Number 
ePlanReviewYes
Description
West Sherwood Apartments - (Grading Drainage, Utilities, and Structural Foundation including First Floor Podium) - To construct the foundation and first level concrete podium for a new approximate 100,400 sq. ft., four story building and related site improvements. This permit will also includes site grading, drainage and underground utilities. The building will be constructed of concrete foundation with wood framed stucture above. Work under this permit shall not proceed beyond the foundation and first floor podium until final approval of the plans and issuance of the next phase building permit. That permit has not yet been applied for. As owner or designated agent, I acknowledge that I am performing this work at my own risk without assurance that the permit for the entire building structure will be granted, and I agree to make any modifications to the foundation and building structure work as may be required to comply with the City Codes and the final approved building plans and conditions. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection3/4/20163/4/20163/7/2016 PASS
DetailsDave Hannah
DOC - Permit Finaled3/7/20163/7/20163/7/2016APASS
DetailsDave Hannah
BLD-Final10/21/201510/22/201510/22/2015APASS
DetailsDave Hannah
Abel Phone #: ###-####
PubWorks Occupancy Approval9/24/20159/24/20159/24/2015 DONE
DetailsTiffany Lowery
BLD-Final9/10/20159/11/20159/11/2015ANR
DetailsPhil Shearer
Call 30min prior for access or questions - Abel Phone #: ###-####
BLD-Final9/10/20159/10/20159/10/2015PPEND
DetailsTony Young
Call 30min prior for access or questions - Abel Phone #: ###-####
PubWorks Temp Occupancy Appr7/27/20157/27/20157/27/2015 DONE
DetailsTiffany Lowery
Print Occupancy Form  7/14/2015 DONE
BLD-Concrete9/10/20149/12/20149/15/2014PPASS
DetailsDave Hannah
Podium deck pour is scheduled for Fri @ 12:00 am into Sat morning. The deck will be ready for inspections on Fri morning-Fri afternoon, 20,000 sq.ft. 625 (+-)yds Thank you. Phone #: ###-#### Inspection requested via web by Tony Inserra
BLD-Concrete8/19/20148/21/20148/21/2014PPART
DetailsDave Hannah
We are planning the first PT deck pour Friday night at 12;00 am approx. 500yd. 16000 sq.ft.
I would like to schedule inspections for Thursday afternoon. Thank you. Phone #: ###-#### >> Inspection requested via web by Tony Inserra
BLD-Concrete8/19/20148/19/20148/19/2014PPASS
DetailsPhil Shearer
Pouring shear wall S. side project, concrete is at 2;00 6 yds, Thank you. Phone #: ###-#### Inspection requested via web by Tony Inserra
BLD-Concrete8/14/20148/15/20148/15/2014APASS
DetailsPhil Shearer
We our pouring shear walls and stem walls, concrete is at 10:00 10+yds.
Thank you. Phone #: ###-#### Inspection requested via web by Tony Inserra
BLD-Footing8/8/20148/8/20148/8/2014PPART
DetailsDave Hannah
We are pouring footings at the N.E. side of the BLD, concrete is at 1;00 pm.
Thanks. Phone #: ###-#### >> Inspection requested via web by Tony Inserra
BLD-Foundation8/6/20148/6/20148/7/2014PPART
DetailsDave Hannah
We are pour elevator pit & shear wall on S.E.BLD.Concrete is at 3:00, MTI will also be inspecting,Thanks. Phone #: ###-#### >> Inspection requested via web by Tony Inserra
BLD-Foundation7/30/20148/1/20148/5/2014PPART
DetailsDave Hannah
Concrete is at 2:00 we are pouring shear walls & stem walls.
Thanks, Phone #: ###-#### >> Inspection requested via web by Tony Inserra
BLD-Concrete8/4/20148/4/20148/5/2014PPART
DetailsDave Hannah
We are pouring the shear wall on the S.W. corner, concrete is at 1;00. Phone #: ###-#### >> Inspection requested via web by Tony Inserra
BLD-Foundation7/30/20147/31/20147/31/2014ACANC
DetailsPhil Shearer
Concrete is at 11:00 we are pouring shear walls, 10+ yds.
Thanks. Phone #: ###-#### Inspection requested via web by Tony Inserra
BLD-Foundation7/30/20147/30/20147/31/2014PPART
DetailsDave Hannah
Concrete is at 2;00 we are pouring 4 columns & stem walls.
Thanks, Phone #: ###-#### >> Inspection requested via web by Tony Inserra mti on site
BLD-Foundation7/28/20147/29/20147/29/2014PPASS
DetailsPhil Shearer
Concrete is at 2:00 we are planning on pouring columns, footings ; stem walls. MTI will also be inspecting. Thanks. Phone #: ###-#### Inspection requested via web by Tony Inserra
per MTI inspection report
BLD-Foundation7/28/20147/28/20147/28/2014PPASS
DetailsPhil Shearer
Concrete is at 1:00 we are planning on pouring columns ; footing. MTI will also be inspecting. Phone #: ###-#### Inspection requested via web by Tony Inserra
per MTI's inspection report
BLD-Foundation7/23/20147/25/20147/25/2014PPASS
DetailsPhil Shearer
Concrete is scheduled for 2;00 we will be pouring 10 columns and stem walls. I will gone Thu ; Fri My concrete super Dan will be the contact ###-####. MTI will also be inspecting
,Thank you. Phone #: ###-#### Inspection requested via web by Tony Inserra

Per MTI inspection report
BLD-Foundation7/23/20147/24/20147/24/2014PPASS
DetailsPhil Shearer
per specail inspection
BLD-Foundation7/22/20147/23/20147/23/2014PPASS
DetailsPhil Shearer
Concrete is scheduled for 2;00 we will be pouring 10 columns, and stem walls
MTI will also be inspecting. Thanks. Phone #: ###-#### Inspection requested via web by Tony Inserra

pending special inspection
BLD-Foundation7/22/20147/22/20147/22/2014PPASS
DetailsPhil Shearer
Concrete is set for 2;00, we pouring 10 columns ; exterior footings. MTI will also inspect.
Pending MTI inspection report.
BLD-Foundation7/21/20147/21/20147/21/2014PPASS
DetailsPhil Shearer
Concrete is at 3:00 we planning on pouring 10 columns.
pending special inspection report
BLD-Footing7/17/20147/18/20147/18/2014APASS
DetailsPhil Shearer
Contact is Tony-Pouring exterior footings, concrete is at 12:30, MTI is also inspecting.
Thank you. Phone #: ###-#### Inspection requested via web by Tony Inserra

Pending special inspection.
BLD-Footing7/11/20147/14/20147/14/2014PPART
DetailsPhil Shearer
column footings east side of bulding. pending special inspection report.
BLD-Footing7/10/20147/10/20147/10/2014PPART
DetailsJim Storey
Concrete is schedule for 9;00 am on the 11th but would like to get re-bar inspection late after noon today, thanks. Phone #: ###-#### >> Inspection requested via web by Tony Inserra pending si reports
OVERRIDE  6/25/2014  
Issue PAID IN FULL permit  6/25/2014 DONE
DetailsBarbara Stitt
Inspection Record Card- Bld  6/25/2014 DONE
DetailsBarbara Stitt
Permit Ready to Issue  6/25/2014 DONE
DetailsChristina Prado
Routing PW Sewer Design6/23/2014 6/24/2014 PASS
DetailsMike Sheppard
PLANS/APPL TAKEN TO FRONT DESK  6/24/2014 DONE
DetailsJohn Menard
Routing - PLAN CHECK6/23/2014 6/24/2014 PASS
DetailsJohn Menard
Plan assigned to (JCM)5/19/2014 6/24/2014 PASS
DetailsJohn Menard
1st Review Complete 6/6/2014
Routing - PUBLIC WORKS6/23/2014 6/23/2014 PASS
DetailsBeverly Mountain
Routing PW Sewer Design6/23/2014 6/23/2014 PASS
DetailsMike Sheppard
Notes have been added to plans
Routing - PLAN CHECK6/11/2014 6/23/2014 PASS
DetailsJohn Menard
Routing Off Site - STRUCTURAL6/11/2014 6/23/2014 PASS
DetailsJohn Menard
Routing PW Drainage6/11/2014 6/20/2014 PASS
DetailsBrian Murphy
Routing PW Sewer Design6/11/2014 6/16/2014 PASS
DetailsKyle S. Rosenmeyer
Add the following to the Boise City Sewer Note:
Contact Boise City Public Works 48 hours prior to sewer connection to obtain tap permit and schedule inspection.

Maintain groundwater below manhole elevation during manhole installation. Dewatering operations may not be discharged into city sewer.
Routing PW Flood Plain6/11/2014 6/12/2014 PASS
DetailsJim Wyllie
Routing PW Street Lights6/11/2014 6/12/2014 PASS
DetailsMike D Hedge
Routing - PUBLIC WORKS6/11/2014 6/11/2014 PASS
DetailsBeverly Mountain
1st review completed  6/6/2014 DONE
DetailsJohn Menard
Routing - PLAN CHECK5/19/2014 6/6/2014 PASS
DetailsJohn Menard
Routing PW Flood Plain5/19/2014 6/5/2014 FAIL
DetailsJim Wyllie
Routing PW Sewer Design5/19/2014 6/5/2014 FAIL
DetailsKyle S. Rosenmeyer
Contact Boise City Public Works 48 hours prior to sewer connection to obtain tap permit and schedule inspection.

Maintain groundwater below manhole elevation during manhole installation. Dewatering operations may not be discharged into city sewer.
Routing - Erosion and Sediment5/19/2014 6/4/2014 PASS
DetailsEvan Jenkins
Routing - PLUMBING5/19/2014 6/2/2014 PASS
DetailsDaryl Spivey
per plan and ISPC.
Routing Off Site - STRUCTURAL5/19/2014 5/30/2014 FAIL
DetailsJohn Menard
Routing PW Drainage5/19/2014 5/30/2014 FAIL
DetailsBrian Murphy
needs strucural letter,variance on 3 to 1 slope 20 % rock
Routing - Design Review5/19/2014 5/29/2014 PASS
DetailsJosh Wilson
Routing - FIRE5/19/20145/19/20145/23/2014 PASS
DetailsCraig D. Hanson
See Fire Plan Review 05-23-14
Route to Impact Fee Review5/19/20145/22/20145/21/2014 PASS
DetailsCindy M. Gould
this is not the shell permit for the appartments. John Maynard said they would probably submit a full permit later.
Routing - PLANNING5/19/2014 5/20/2014 PASS
DetailsJoshua Johnson
Routing PW Solid Waste5/19/2014 5/20/2014 PASS
DetailsPeter J. McCullough
Routing - PLANNING Land Div5/19/2014 5/19/2014 PASS
DetailsDave Abo
Routing - Addressing5/19/2014 5/19/2014 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS5/19/2014 5/19/2014 PASS
DetailsBeverly Mountain
Intake Approval  5/19/2014 PASS
DetailsJohn Menard
Pending Assignment by JCM5/19/2014 5/19/2014 DONE
DetailsJohn Menard
Routing PW Street Lights5/19/2014 5/19/2014 FAIL
DetailsMike D Hedge
Missing street light plans.
Intake Approval  5/16/2014 FAIL
DetailsJohn Menard
1. Please submit all applicable structural calculatioins for this project phase.

2. Please revise all civil sheets to provide the required area in the lower right hand
corner for the City approal stamp.
Application received  4/2/2014 DONE
Application submitted via PDS Online on Apr 2 2014 1:06PM
First Notice3/7/20163/7/2016   
DetailsDave Hannah