BLD-Final | 9/9/2014 | 9/10/2014 | 9/10/2014 | A | PASS |
Jim Sly
|
|
|
Gary Phone #: ###-####
|
DOC - Permit Finaled | 9/10/2014 | 9/10/2014 | 9/10/2014 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 7/15/2014 | 7/16/2014 | 7/16/2014 | P | PASS |
Tony Young
|
|
|
|
BLD-Energy code compliance | 7/14/2014 | 7/15/2014 | 7/15/2014 | A | NR |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 7/14/2014 | 7/14/2014 | 7/14/2014 | P | PASS |
Tony Young
|
|
|
Doug-please do after 1 if possible Phone #: ###-####
|
BLD-Wall Bracing | 6/6/2014 | 6/9/2014 | 6/9/2014 | A | PASS |
Tony Young
|
|
|
Gary Phone #: ###-####
|
BLD-Wall Bracing | 6/5/2014 | 6/6/2014 | 6/6/2014 | A | PART |
Tony Young
|
|
|
Gary Phone #: ###-####,, ok pending staple conversion from engineer
|
BLD-Foundation | 5/7/2014 | 5/8/2014 | 5/8/2014 | P | PASS |
Tony Young
|
|
|
-Anton Phone #: ###-####
|
BLD-Foundation | 5/6/2014 | 5/7/2014 | 5/7/2014 | A | NR |
Tony Young
|
|
|
-Anton Phone #: ###-####
|
BLD-Footing | 5/5/2014 | 5/6/2014 | 5/6/2014 | A | PART |
Tony Young
|
|
|
Concrete will be onsite at 11:45am--Anton Phone #: ###-####
|
PubWorks Subgrade Approval | 5/5/2014 | 5/5/2014 | 5/5/2014 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 5/1/2014 | 5/2/2014 | 5/2/2014 | A | CANC |
Tony Young
|
|
|
antone - 11 am please Phone #: ###-#### -- customer called to cancel and will reschedule at a later date ///5-1-14ps
|
Issue PAID IN FULL permit | | | 4/14/2014 | | DONE |
Candy A. Nichols
|
|
|
|
OVERRIDE | | | 4/8/2014 | | |
|
|
|
|
Routing Walk-In (BLD) | 4/4/2014 | 4/4/2014 | 4/8/2014 | P | PASS |
Carl D Madsen
|
|
|
|
Application received | | 4/3/2014 | 4/8/2014 | | DONE |
|
|
|
|
Routing - MECHANICAL | 4/8/2014 | | 4/8/2014 | | PASS |
Troy James
|
|
|
|
Case Summary (BLD) | | | 4/8/2014 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/8/2014 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/8/2014 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 4/8/2014 | | DONE |
Tisha Gallop
|
|
|
called Trey Hoff and told him permit is ready and fee due.
|
Permit Ready to Issue | | | 4/8/2014 | | DONE |
Tisha Gallop
|
|
|
|
Routing Walk-In (Zoning) | 4/4/2014 | 4/4/2014 | 4/4/2014 | P | PASS |
Leon Letson
|
|
|
R-1C Setbacks OK Per PUD approval
|
Routing Walk-In (PW Hillside) | 4/3/2014 | 4/3/2014 | 4/3/2014 | P | PASS |
Jason C. Taylor
|
|
|
Subgrade inspection required prior to foundation inspections by building departement. A copy of the subgrade report, stamped by a professional enginner is required. Jason Taylor ###-####.
|
Routing Walk-In (Zoning) | 4/3/2014 | 4/3/2014 | 4/3/2014 | P | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 4/3/2014 | 4/3/2014 | 4/3/2014 | P | FAIL |
Javier Guzman
|
|
|
Hillside home needed engineer stamp on foundation plan sheet, ESI report for foam insulation, Type of siding to meet WUI A requirements
|
1st review completed | | | 4/3/2014 | | FAIL |
Javier Guzman
|
|
|
|