BLD-Final | 5/22/2014 | 5/27/2014 | 5/28/2014 | P | PASS |
Dave Hannah
|
|
|
Brad Smith Phone #: ###-####
|
Letter of compliance/Occupancy | | | 5/28/2014 | | DONE |
Candy A. Nichols
|
|
|
|
DOC - Permit Finaled | | | 5/28/2014 | | DONE |
|
|
|
|
FIRE-Final Inspection | 5/22/2014 | 5/27/2014 | 5/27/2014 | A | PASS |
Forrest France
|
|
|
Fire life safety inspection completed acceptable. Contractor verified EM lighting located at the soffits.
|
BLD-Final | 5/22/2014 | 5/22/2014 | 5/22/2014 | P | NR |
Dave Hannah
|
|
|
Bradly Phone #: ###-####
|
FIRE-Final Inspection | 5/12/2014 | 5/12/2014 | 5/12/2014 | P | PART |
Forrest France
|
|
|
Final pending finishes. Trade related fire sprinkler permit work finaled.
|
BLD-Ceiling Grid Inspection | 5/5/2014 | 5/6/2014 | 5/6/2014 | A | PASS |
Dave Hannah
|
|
|
John Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 4/28/2014 | 4/29/2014 | 4/29/2014 | A | PASS |
Dave Hannah
|
|
|
John Phone #: ###-####
|
BLD-Framing/Rough-in | 4/28/2014 | 4/29/2014 | 4/29/2014 | A | PASS |
Dave Hannah
|
|
|
John Phone #: ###-####
|
Issue PAID IN FULL permit | | | 4/9/2014 | | DONE |
Christina Prado
|
|
|
|
Application received | | 4/3/2014 | 4/3/2014 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 4/3/2014 | | DONE |
Tim L. Woodard
|
|
|
|
Intake Approval | | | 4/3/2014 | | PASS |
Tim L. Woodard
|
|
|
|
Plan assigned to (TLW) | 4/3/2014 | | 4/3/2014 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 4/3/2014 | | 4/3/2014 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 4/3/2014 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/3/2014 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 4/3/2014 | | DONE |
Tim L. Woodard
|
|
|
|
Inspection Record Card- Bld | | | 4/3/2014 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 4/3/2014 | | DONE |
Tisha Gallop
|
|
|
|