Print Statement | | | 12/22/2015 | | DONE |
|
|
|
sent statement with past due stamp
|
Print Statement | | | 11/9/2015 | | DONE |
|
|
|
sent past due notices
|
Print Statement | | | 9/18/2015 | | DONE |
|
|
|
|
Print Statement | | | 7/29/2015 | | DONE |
|
|
|
|
Third Notice | | 6/14/2015 | 7/13/2015 | | DONE |
|
|
|
|
Third Notice | | 5/9/2015 | 6/9/2015 | | DONE |
|
|
|
|
Second Notice | | 3/13/2015 | 5/4/2015 | | DONE |
|
|
|
mailed second notice 5-4-15
|
First Notice | | 2/6/2015 | 3/3/2015 | | DONE |
|
|
|
|
Permanent Occupancy UNPAID FEE | | | 1/27/2015 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 1/15/2015 | 1/15/2015 | 1/15/2015 | P | PASS |
Mike Jordan
|
|
|
Chris Phone #: ###-####. Ok for perm occ.
|
BLD-Final | 1/14/2015 | 1/14/2015 | 1/14/2015 | P | NR |
Mike Jordan
|
|
|
Chris Phone #: ###-####. Will reschedule and provide approved plans.
|
Place hold on job | 1/5/2015 | | 1/14/2015 | | DONE |
Brittany Hill
|
|
|
DO NOT ISSUE CO UNTIL SWR14-00291 is paid in full.
|
Print Occupancy Form | | | 1/12/2015 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 8/6/2014 | 8/7/2014 | 8/7/2014 | P | PART |
Mike Jordan
|
|
|
Chris Phone #: ###-####. ok for temp occ.
|
FIRE-Final Inspection | 8/6/2014 | 8/7/2014 | 8/7/2014 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Wood above the ceiling has been changed to fire treated. Building contractor to provide panic hardware on door 111 prior to a building sign off
|
FIRE-Conference | 8/6/2014 | 8/6/2014 | 8/6/2014 | P | DONE |
Forrest France
|
|
|
On site conference with contractor regarding fire life safety conditions and inspection items necessary for final. Noted door hardware issues, one exit sign to be repaired, noted curtain partitions are not yet installed and may create obstructions to fire alarm and sprinkler coverage.
|
BLD-Framing/Rough-in | 8/4/2014 | 8/5/2014 | 8/5/2014 | A | CANC |
Mike Jordan
|
|
|
Chric Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 8/4/2014 | 8/5/2014 | 8/5/2014 | A | PASS |
Mike Jordan
|
|
|
Chric Phone #: ###-####
|
BLD-Framing/Rough-in | 6/24/2014 | 6/25/2014 | 6/25/2014 | P | PASS |
Mike Jordan
|
|
|
Michael Phone #: ###-####. iNterior steel stud framed walls only, no grid.
|
Permit Ready to Issue | | | 5/28/2014 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 5/28/2014 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 5/28/2014 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (AJS) | 4/14/2014 | 4/14/2014 | 5/27/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed CWI-Dental Assistant Program
|
Routing - Erosion and Sediment | 5/22/2014 | | 5/27/2014 | | PASS |
Evan Jenkins
|
|
|
signed off on e plan BLD14-00794
|
Routing - PLAN CHECK | 5/22/2014 | | 5/27/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/27/2014 | | DONE |
|
|
|
|
1st review completed | | | 5/7/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 4/14/2014 | | 5/7/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - Erosion and Sediment | 4/14/2014 | | 5/7/2014 | | FAIL |
Andy J. Long
|
|
|
failed in e plan
|
Routing - FIRE | 4/14/2014 | 4/14/2014 | 4/23/2014 | | PASS |
Craig D. Hanson
|
|
|
See Fire Plan Review 04-23-14
|
Routing - PLUMBING | 4/14/2014 | | 4/16/2014 | | PASS |
Daryl Spivey
|
|
|
May require additional backflow protection on installed equipment.
|
Routing - Addressing | 4/14/2014 | | 4/16/2014 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 4/14/2014 | | 4/14/2014 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Sewer Rating | 4/14/2014 | | 4/14/2014 | | PASS |
Connie Baumgartner
|
|
|
|
Intake Approval | | | 4/14/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Intake Approval | | | 4/4/2014 | | FAIL |
John Menard
|
|
|
1. The checklist indicated that some of the required information was on plan sheet S1.1; however, it does not appear that plan sheet S1.1 was uploaded. Please upload plan sheet S1.1.
2. The description on the permit application does not appear to match the scope of work on the construction documents. Please review the description on the application and verify the requested permit scope of work.
|
Application received | | | 4/3/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 3 2014 3:47PM
|