Permit Information
Permit NumberBLD14-00811
StatusFinaled
Name W R GANN COMPANY LLC
Site Address 533 W PASO FINO DR
Project NameHon Residence
Customer Number 
ePlanReviewYes
Description
WUI Zone A, Class A Roof, Permit for the construction of a new 3593 sq. ft., two story (first story 2600 sq. ft., second story 993 sq. ft.) single family dwelling with 3 bedrooms, 3.5 bathrooms, approximately 495 sq. ft. of covered patio/porch and a 797 sq. ft. attached garage per the approved plans, plan review report and any notations. R-1A/DA zoning and setbacks per planning. JG A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/4/201412/5/201412/5/2014PPASS
DetailsTony Young
Walt Phone #: ###-#### Or Mike ###-####
DOC - Permit Finaled12/5/201412/5/201412/5/2014PPASS
DetailsTony Young
c of o issued
PubWorks Occupancy Approval12/5/201412/5/201412/5/2014 DONE
DetailsJason C. Taylor
Bond in place for grading/drainage/roof downspouts. Occupancy is approved.

Jason Taylor ###-####
BLD-Energy code compliance7/31/20148/1/20148/1/2014PPASS
DetailsTony Young
Mike Phone #: ###-####
BLD-Framing/Rough-in7/24/20147/25/20147/25/2014PPART
DetailsTony Young
Mike Phone #: ###-####,, ok to insulate pend mech pass in system on f/p,, ok to do seal layer for air seal
BLD-Conference7/16/20147/16/20147/16/2014PPASS
DetailsTony Young
BLD-Conference7/15/20147/16/20147/16/2014APASS
DetailsTony Young
Mike Phone #: ###-####,, with framer
BLD-Conference7/10/20147/11/20147/11/2014PPASS
DetailsTony Young
Mike Phone #: ###-#### frame ?s,, seal pack will be done w/ foam blow in,, need trades
BLD-Wall Bracing6/17/20146/17/20146/17/2014PPASS
DetailsTony Young
Mike Phone #: ###-####
BLD-Wall Bracing6/16/20146/17/20146/17/2014ANR
DetailsTony Young
Mike Phone #: ###-####
BLD-Foundation5/7/20145/7/20145/7/2014PPASS
DetailsTony Young
Robert Phone #: ###-####
OVERRIDE  5/7/2014  
BLD-Footing5/5/20145/5/20145/5/2014PPART
DetailsTony Young
Robert Phone #: ###-####,, work in progress,, ok to pour when ready
PubWorks Subgrade Approval5/5/20145/5/20145/5/2014 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Plan assigned to (JG)4/8/20144/8/20144/28/2014 PASS
DetailsJavier Guzman
1st review completed, pending hillside, Due 4/25 F L2 Hillside ePlan**
Routing - PLAN CHECK4/28/2014 4/28/2014 PASS
DetailsJavier Guzman
Routing PW Grading-Hillside4/28/2014 4/28/2014 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.

PLANS/APPL TAKEN TO FRONT DESK  4/28/2014 DONE
Issue PAID IN FULL permit  4/28/2014 DONE
Inspection Record Card- Bld  4/28/2014 DONE
Routing - PLAN CHECK4/24/2014 4/28/2014 PASS
DetailsJavier Guzman
CHANGE STATUS TO (ISS)  4/28/2014 DONE
DetailsAlexandra L. DeYoung
Permit Ready to Issue  4/28/2014 DONE
DetailsAlexandra L. DeYoung
Routing PW Grading-Hillside4/25/2014 4/25/2014 FAIL
DetailsJason C. Taylor
Need original geotechnical report uploaded. Jason Taylor ###-####.
Routing - PLANNING4/25/2014 4/25/2014 PASS
DetailsDavid Moser
1st review completed  4/24/2014 FAIL
DetailsJavier Guzman
Routing - PLAN CHECK4/8/2014 4/24/2014 FAIL
DetailsJavier Guzman
Routing - MECHANICAL4/16/2014 4/16/2014 PASS
DetailsTroy James
Routing - FIRE4/8/20144/8/20144/14/2014 PASS
DetailsScott Arellano
Fire Sprinklers are required. See attached fire safety plan.
Routing - MECHANICAL4/8/2014 4/14/2014 FAIL
DetailsTroy James
eplan
Route to Impact Fee Review4/8/20144/11/20144/9/2014 PASS
DetailsCindy M. Gould
Routing - PUBLIC WORKS4/8/2014 4/9/2014 PASS
DetailsConnie Baumgartner
Routing - PLANNING4/8/2014 4/8/2014 FAIL
DetailsDavid Moser
The amenity for PUD12-00017 (a hiking trail, landscaping and bench) shall be built or bonded for
Routing PW Grading-Hillside4/8/2014 4/8/2014 FAIL
DetailsJason C. Taylor
Routing - Erosion and Sediment4/8/2014 4/8/2014 PASS
DetailsEvan Jenkins
Routing - Addressing4/8/2014 4/8/2014 PASS
DetailsEmily Dixon
Intake Approval  4/8/2014 FAIL
Intake Approval  4/8/2014 PASS
Application received  4/6/2014 DONE
Application submitted via PDS Online on Apr 6 2014 12:08PM