BLD-Final | 7/16/2014 | 7/16/2014 | 7/16/2014 | P | PASS |
Tony Young
|
|
|
Kevin Phone #: ###-####
|
DOC - Permit Finaled | 7/16/2014 | 7/16/2014 | 7/16/2014 | P | PASS |
Tony Young
|
|
|
done
|
BLD-Footing | 4/22/2014 | 4/24/2014 | 4/24/2014 | P | PASS |
Tony Young
|
|
|
kevin Phone #: ###-####
|
Routing Walk-In (BLD) | 4/22/2014 | 4/22/2014 | 4/22/2014 | A | DONE |
Perry Paine
|
|
|
|
PubWorks Subgrade Approval | 4/22/2014 | 4/22/2014 | 4/22/2014 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Permit Ready to Issue | | | 4/22/2014 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/22/2014 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/22/2014 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/22/2014 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 4/17/2014 | 4/17/2014 | 4/17/2014 | P | FAIL |
Perry Paine
|
|
|
need wui questions answered and referred to the engeer of record
|
Routing Walk-In (PW Hillside) | 4/7/2014 | 4/7/2014 | 4/7/2014 | A | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Routing Walk-In (Zoning) | 4/7/2014 | 4/7/2014 | 4/7/2014 | A | PASS |
Todd Tucker
|
|
|
|
Routing Walk-In (BLD) | 4/7/2014 | 4/7/2014 | 4/7/2014 | A | FAIL |
Carl D Madsen
|
|
|
The deck and foundation system is required to be engineered and comply with WUI zone A. CDM 4-7-14
|
1st review completed | | | 4/7/2014 | | DONE |
Carl D Madsen
|
|
|
|
Application received | | 4/7/2014 | | | |
|
|
|
|