Reopen Permit (ISS) | | | 3/30/2015 | | DONE |
|
|
|
Reopen per Bill
|
CHANGE STATUS TO (FNL) | | | 3/30/2015 | | DONE |
|
|
|
|
BLD-Final | 10/23/2014 | 10/24/2014 | 10/24/2014 | A | PASS |
Tony Young
|
|
|
bryan Phone #: ###-####
|
DOC - Permit Finaled | 10/24/2014 | 10/24/2014 | 10/24/2014 | P | PASS |
Tony Young
|
|
|
c of o issued
|
PubWorks Occupancy Approval | 10/24/2014 | 10/24/2014 | 10/24/2014 | | DONE |
Brian Murphy
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Final | 10/22/2014 | 10/23/2014 | 10/23/2014 | P | PEND |
Tony Young
|
|
|
bryan Phone #: ###-####,, ok after hillside sign off
|
BLD-Energy code compliance | 7/11/2014 | 7/11/2014 | 7/11/2014 | P | PART |
Tony Young
|
|
|
Bryan Phone #: ###-####,, interior ok to cover
|
BLD-Energy code compliance | 7/10/2014 | 7/11/2014 | 7/11/2014 | A | PART |
Tony Young
|
|
|
Bryan Phone #: ###-####,, interior ok to cover
|
BLD-Framing/Rough-in | 7/10/2014 | 7/11/2014 | 7/11/2014 | A | PEND |
Tony Young
|
|
|
Bryan Phone #: ###-####
|
BLD-Framing/Rough-in | 7/3/2014 | 7/7/2014 | 7/7/2014 | P | PART |
Jim Storey
|
|
|
Brian Phone #: ###-#### truss repair t-34/ exterior ok to cover and ok to insalate.
|
BLD-Foundation | 5/6/2014 | 5/8/2014 | 5/8/2014 | A | PART |
Tony Young
|
|
|
Eric Phone #: ###-####,, work in progress,, ok
|
BLD-Footing | 5/2/2014 | 5/5/2014 | 5/5/2014 | P | PART |
Tony Young
|
|
|
Eric Phone #: ###-####,, WORK IN PROGRESS
|
PubWorks Subgrade Approval | 5/1/2014 | 5/1/2014 | 5/1/2014 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
OVERRIDE | | | 4/29/2014 | | |
|
|
|
|
Plan assigned to (JG) | | 4/7/2014 | 4/29/2014 | | PASS |
Javier Guzman
|
|
|
1st reveiw completed, Pending planning, Due 4/24 TH L2 Hillside*
|
Routing - PLANNING | 4/29/2014 | | 4/29/2014 | | PASS |
David Moser
|
|
|
Common drive shall be paved
|
Case Summary (BLD) | | | 4/29/2014 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/29/2014 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/29/2014 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 4/29/2014 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 4/29/2014 | | DONE |
Christina Prado
|
|
|
|
Routing - PLAN CHECK | 4/28/2014 | | 4/28/2014 | | PASS |
Javier Guzman
|
|
|
|
Plan resubmittals received | | | 4/25/2014 | | DONE |
Christina Prado
|
|
|
Received two sets of revised plan sheets marked A-102, S-101, S104, S105, S106, S107 & S-110 as well as two truss calc specs, and two wood beam engineering specs;Plans taken to Javier for further review
|
1st review completed | | | 4/23/2014 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | | | 4/23/2014 | | FAIL |
Javier Guzman
|
|
|
emailed report to applicant
|
Routing - FIRE | 4/10/2014 | 4/7/2014 | 4/11/2014 | | PASS |
Scott Arellano
|
|
|
Per the Fire Marshal, fire sprinklers complying with NFPA13D are required in this single family residence.
|
Routing - Erosion and Sediment | 4/10/2014 | | 4/10/2014 | | PASS |
Andy J. Long
|
|
|
ESC site map and narrative submitted and approved. Valid PD and RP designated.
|
Routing - MECHANICAL | 4/8/2014 | | 4/10/2014 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 4/8/2014 | | 4/8/2014 | | FAIL |
David Moser
|
|
|
Plat Note 14 allows for driveway access location. Common drive easment on plat note 14 shall be paved. The developer shall build or bond for PUD amenity (walking trail a bench).
|
Routing - Addressing | | | 4/8/2014 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | | | 4/8/2014 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Grading-Hillside | | | 4/8/2014 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Route to Impact Fee Review | 4/7/2014 | 4/10/2014 | 4/7/2014 | | PASS |
Cindy M. Gould
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/7/2014 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 4/7/2014 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/7/2014 | | DONE |
Christina Prado
|
|
|
|
Application received | | 4/7/2014 | | | |
|
|
|
|