BLD-Final | 8/5/2014 | 8/5/2014 | 8/5/2014 | P | PASS |
Jim Sly
|
|
|
david-###-####
|
DOC - Permit Finaled | 8/5/2014 | 8/5/2014 | 8/5/2014 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 6/18/2014 | 6/18/2014 | 6/18/2014 | P | NR |
Jim Sly
|
|
|
Call ahead for access and Perry with questions on calcs - David Phone #: ###-#### Need HD's ar corners.....Header W.Wall.
|
BLD-Footing | 5/21/2014 | 5/21/2014 | 5/22/2014 | P | DONE |
Jim Sly
|
|
|
Dan French ###-#### call to meet onsite to discuss sheetrock adjacent ot two hour firewall
|
Routing Walk-In (BLD) | 5/15/2014 | 5/15/2014 | 5/15/2014 | P | PASS |
Adele J Schaffeld-Griffin
|
|
|
Defferred submittal of engineering calculations for pier design
|
Case Summary (BLD) | | | 5/15/2014 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
Case Summary (BLD) | | | 5/15/2014 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Bld | | | 5/15/2014 | | DONE |
Christina Prado
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/15/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/15/2014 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 5/15/2014 | | DONE |
Christina Prado
|
|
|
|
Routing Walk-In (BLD) | 4/29/2014 | 4/29/2014 | 4/29/2014 | A | FAIL |
Perry Paine
|
|
|
With Tough-shed reps, Explained new proposed policy for small accessory buildings and told them to have the engineer address that draft policy. Their proposal will likely be for a pier foundation. Also went over the new proposed policy. They left with copies of the residential applications, and a copy of the draft. Engineer is to contact me directly with questions and e-mail me with the engineering designs sealed with BLD14-00828 referenced.. pep
|
Meeting | | | 4/29/2014 | | DONE |
|
|
|
With Tough-shed reps, Explained new proposed policy for small accessory buildings and told them to have the engineer address that draft policy. Their proposal will likely be for a pier foundation. Also went over the new proposed policy. They left with copies of the residential applications, and a copy of the draft. Engineer is to contact me directly with questions and e-mail me with the engineering designs sealed with BLD14-00828 referenced.. pep
|
Routing Walk-In (Zoning) | 4/11/2014 | 4/11/2014 | 4/11/2014 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 4/11/2014 | 4/11/2014 | 4/11/2014 | A | FAIL |
Carl D Madsen
|
|
|
I informed Mr. Prince that a foundation was required for this 384 sq. ft. storage building.
|
1st review completed | | | 4/11/2014 | | FAIL |
|
|
|
|
Routing Walk-In (Zoning) | 4/8/2014 | 4/8/2014 | 4/8/2014 | P | FAIL |
Leon Letson
|
|
|
Proposed shed does not meet setbacks.
|
Application received | | 4/8/2014 | | | |
|
|
|
|