BLD-Final | 10/1/2014 | 10/2/2014 | 10/2/2014 | P | PASS |
Tony Young
|
|
|
Please call 30mins ahead for access - Brian Phone #: ###-####
|
DOC - Permit Finaled | 10/2/2014 | 10/2/2014 | 10/2/2014 | P | PASS |
Tony Young
|
|
|
c of o issued. A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Final | 10/1/2014 | 10/1/2014 | 10/1/2014 | P | PEND |
Tony Young
|
|
|
Please call 30min ahead for walk through - Bryan Phone #: ###-####
|
BLD-Final | 9/29/2014 | 10/1/2014 | 10/1/2014 | A | PEND |
Tony Young
|
|
|
Please call 30min ahead for walk through - Bryan Phone #: ###-####,, walk through only,, need hillside,, blower door test, fire caulk seal garage
|
BLD-Wall cover | 7/24/2014 | 7/25/2014 | 7/25/2014 | A | PASS |
Tony Young
|
|
|
interior shear
|
BLD-Conference | 7/23/2014 | 7/23/2014 | 7/23/2014 | P | PASS |
Tony Young
|
|
|
soffit vents - installed per supplied information
|
BLD-Energy code compliance | 7/18/2014 | 7/21/2014 | 7/21/2014 | A | PASS |
Tony Young
|
|
|
Brian Phone #: ###-####
|
BLD-Energy code compliance | 7/17/2014 | 7/18/2014 | 7/18/2014 | A | PART |
Tony Young
|
|
|
Brian Phone #: ###-####,, need insulation under upper deck area, above living area, other areas ok to cover
|
BLD-Framing/Rough-in | 7/17/2014 | 7/17/2014 | 7/17/2014 | P | PART |
Tony Young
|
|
|
Late afternoon-Brian Phone #: ###-####,, still need soffits
|
BLD-Framing/Rough-in | 7/16/2014 | 7/17/2014 | 7/17/2014 | A | PART |
Tony Young
|
|
|
Late afternoon-Brian Phone #: ###-####
|
BLD-Framing/Rough-in | 7/15/2014 | 7/16/2014 | 7/16/2014 | P | PART |
Tony Young
|
|
|
Late afternoon-Brian Phone #: ###-####,, frame corrections in progress,, ok to insulate,, need sprinklers passed fully
|
BLD-Framing/Rough-in | 7/15/2014 | 7/16/2014 | 7/16/2014 | A | PART |
Tony Young
|
|
|
Call ahead for access - Ryan Phone #: ###-####,, conf only
|
BLD-Framing/Rough-in | 7/14/2014 | 7/15/2014 | 7/15/2014 | A | PART |
Tony Young
|
|
|
Call ahead for access - Ryan Phone #: ###-####,, walk through w/ builder,, c/n on 2nd plans
|
BLD-Framing/Rough-in | 7/11/2014 | 7/14/2014 | 7/14/2014 | P | NR |
Tony Young
|
|
|
Call ahead for access - Ryan Phone #: ###-####,, needs sprinklers 1st
|
Plan Modification Accepted | | | 7/10/2014 | | DONE |
|
|
|
new manual j
|
Routing - MECHANICAL | 7/10/2014 | | 7/10/2014 | | PASS |
Troy James
|
|
|
resubmitted manual j
|
BLD-Foundation | 5/21/2014 | 5/22/2014 | 5/22/2014 | P | PART |
Tony Young
|
|
|
Ron Phone #: ###-####,, wip,, ok
|
BLD-Footing | 5/20/2014 | 5/21/2014 | 5/21/2014 | A | PASS |
Tony Young
|
|
|
Ron Phone #: ###-####
|
PubWorks Subgrade Approval | 5/21/2014 | 5/21/2014 | 5/21/2014 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 5/8/2014 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (JG) | 4/8/2014 | 4/8/2014 | 5/7/2014 | | PASS |
Javier Guzman
|
|
|
1st review completed, Due 4/25 F L2 Hillside**
|
Routing PW Grading-Hillside | 5/7/2014 | | 5/7/2014 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - PLAN CHECK | 5/7/2014 | | 5/7/2014 | | PASS |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 5/7/2014 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/7/2014 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/7/2014 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 5/7/2014 | | DONE |
Christina Prado
|
|
|
called Jim to advise permit is ready and gave fees due
|
Permit Ready to Issue | | | 5/7/2014 | | DONE |
Christina Prado
|
|
|
|
Plan resubmittals received | | | 5/2/2014 | | DONE |
Tisha Gallop
|
|
|
received two copies of plan sheets C1, A2, S1, S2, S3, S4
|
Routing - PLANNING | 4/29/2014 | | 4/29/2014 | | PASS |
David Moser
|
|
|
|
Plan resubmittals received | | | 4/28/2014 | | DONE |
Christina Prado
|
|
|
received one large set of revised plan sheet marked "site grading & drainage plan" as well as one reduced site plan;Taken to Javier for further review
|
Routing - PLAN CHECK | 4/17/2014 | | 4/25/2014 | | FAIL |
Javier Guzman
|
|
|
Sent review report to applicant
|
Plan resubmittals received | | | 4/25/2014 | | DONE |
Tisha Gallop
|
|
|
received two copies of plan sheets S1(foundation) & S4(Sections); taken to Javier
|
1st review completed | | | 4/25/2014 | | FAIL |
Javier Guzman
|
|
|
|
Routing - MECHANICAL | 4/22/2014 | | 4/22/2014 | | PASS |
Troy James
|
|
|
|
Routing - Erosion and Sediment | 4/16/2014 | | 4/17/2014 | | PASS |
Andy J. Long
|
|
|
ESC plan and narrative with BMPs provided. Valid RP and PD designated.
|
Routing - MECHANICAL | 4/16/2014 | | 4/16/2014 | | FAIL |
Troy James
|
|
|
emailed correction to legend
|
Routing - PLANNING | 4/15/2014 | | 4/16/2014 | | FAIL |
David Moser
|
|
|
the building permit has two different site plans and I need to know which one is correct. I left two messages (4/15/14 and 4/16/14) with the listed agent on the building permit application.
|
Routing - PUBLIC WORKS | 4/9/2014 | | 4/15/2014 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Grading-Hillside | 4/9/2014 | | 4/15/2014 | | FAIL |
Jason C. Taylor
|
|
|
Need multiple revisions: Geotechnical Report, Grading Plan, Structural Calc's. Jason Taylor ###-####.
|
Routing - FIRE | | | 4/14/2014 | | PASS |
Scott Arellano
|
|
|
Fire Sprinklers are required. See attached Fire safety plan.
|
Routing - Addressing | 4/9/2014 | | 4/14/2014 | | PASS |
Jason C. Taylor
|
|
|
|
Route to Impact Fee Review | 4/8/2014 | 4/11/2014 | 4/9/2014 | | PASS |
Cindy M. Gould
|
|
|
|
Application received | | 4/8/2014 | 4/9/2014 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/8/2014 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/8/2014 | | DONE |
Tisha Gallop
|
|
|
|
Intake Approval | | | 4/8/2014 | | PASS |
Tisha Gallop
|
|
|
|