BLD-Final | 6/24/2015 | 6/24/2015 | 6/24/2015 | P | PASS |
Tony Young
|
|
|
Please call ###-####. Thanks Dylan Phone #: ###-#### Inspection requested via web by Dylan Schneider
|
DOC - Permit Finaled | 6/24/2015 | 6/24/2015 | 6/24/2015 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 6/11/2015 | 6/12/2015 | 6/12/2015 | A | PART |
Tony Young
|
|
|
Please call before inspection. ThankS, Dylan ###-#### Phone #: ###-#### Inspection requested via web by Dylan Schneider,, vents
|
BLD-Wall cover | 12/15/2014 | 12/18/2014 | 12/18/2014 | A | PASS |
Jim Sly
|
|
|
Please call when heading to job. Thank You! Dylan Schneider Phone #: ###-#### Inspection requested via web by Dylan Schneider
|
BLD-Wall cover | 12/12/2014 | 12/15/2014 | 12/15/2014 | P | NR |
Tony Young
|
|
|
Please call when heading to job. Thank You! Dylan Schneider Phone #: ###-#### Inspection requested via web by Dylan Schneider,, waiting on sprinkler company
|
BLD-Wall cover | 12/11/2014 | 12/12/2014 | 12/12/2014 | A | NR |
Tony Young
|
|
|
Please call when heading to job. Thank You! Dylan Schneider Phone #: ###-#### Inspection requested via web by Dylan Schneider,, still waiting on sprinkler company to complete the job and call for reinspection
|
BLD-Wall cover | 12/10/2014 | 12/11/2014 | 12/11/2014 | A | PART |
Tony Young
|
|
|
Please call when heading to job. Thank You! Dylan Schneider Phone #: ###-#### Inspection requested via web by Dylan Schneider,, ok to cover hallway area where fix has been done,, still need sprinkler full pass
|
BLD-Energy code compliance | 12/8/2014 | 12/10/2014 | 12/10/2014 | A | PEND |
Tony Young
|
|
|
Please call when heading to job. Thank You! Dylan Schneider Phone #: ###-#### Inspection requested via web by Dylan Schneider,, energy ok,,, just need sprinkler company to fix/complete and to get approval to cover all areas
|
BLD-Energy code compliance | 12/5/2014 | 12/8/2014 | 12/8/2014 | A | PART |
Tony Young
|
|
|
Please call when heading to job. Thank You! Dylan Schneider Phone #: ###-#### Inspection requested via web by Dylan Schneider/// ok only in areas allowed by sprinkler pass
|
BLD-Energy code compliance | 12/4/2014 | 12/5/2014 | 12/5/2014 | A | PART |
Tony Young
|
|
|
Please call when heading to job. Thank You! Dylan Schneider Phone #: ###-#### Inspection requested via web by Dylan Schneider,, interior walls ok to cover and exterior that have sprinkler approval
|
BLD-Framing/Rough-in | 12/4/2014 | 12/5/2014 | 12/5/2014 | A | PASS |
Tony Young
|
|
|
Please call when heading to job. Thank You! Dylan Schneider Phone #: ###-#### Inspection requested via web by Dylan Schneider
|
BLD-Framing/Rough-in | 12/4/2014 | 12/4/2014 | 12/4/2014 | P | PART |
Tony Young
|
|
|
Please call when heading to job. Thank You! Dylan Schneider Phone #: ###-#### Inspection requested via web by Dylan Schneider,, need fire sprinklers,, ok to insulate
|
BLD-Conference | 12/3/2014 | 12/4/2014 | 12/4/2014 | A | PEND |
Tony Young
|
|
|
Please call when heading to job. Thank You! Dylan Schneider Phone #: ###-#### Inspection requested via web by Dylan Schneider,, need fire pass
|
BLD-Framing/Rough-in | 12/2/2014 | 12/3/2014 | 12/3/2014 | A | PEND |
Tony Young
|
|
|
Please call when heading to job. Thank You! Dylan Schneider Phone #: ###-#### Inspection requested via web by Dylan Schneider
|
BLD-Framing/Rough-in | 12/2/2014 | 12/2/2014 | 12/3/2014 | P | PART |
Tony Young
|
|
|
Please call when heading to job. Thank You! Dylan Schneider Phone #: ###-#### Inspection requested via web by Dylan Schneider,, some areas ok,, will go back to site on 3rd,, sprinklers are vwork in progress
|
BLD-Framing/Rough-in | 12/1/2014 | 12/2/2014 | 12/2/2014 | A | PEND |
Tony Young
|
|
|
Please call when heading to job. Thank You! Dylan Schneider Phone #: ###-#### Inspection requested via web by Dylan Schneider
|
BLD-Framing/Rough-in | 12/1/2014 | 12/1/2014 | 12/1/2014 | P | PART |
Tony Young
|
|
|
Please call when heading to job. Thank You! Dylan Schneider Phone #: ###-#### Inspection requested via web by Dylan Schneider,, correction notice posted,, need fire sprinklers passed,, point loads,, fasteners in connectors, etc
|
BLD-Framing/Rough-in | 11/29/2014 | 12/1/2014 | 12/1/2014 | A | DEFR |
Tony Young
|
|
|
Please call when heading to job. Thank You! Dylan Schneider Phone #: ###-#### Inspection requested via web by Dylan Schneider,, need trades
|
Plan Modification Accepted | | | 10/21/2014 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 10/21/2014 | | 10/21/2014 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Wall Bracing | 10/6/2014 | 10/7/2014 | 10/7/2014 | A | PASS |
Tony Young
|
|
|
Dylan Phone #: ###-####,, exterior shear ok
|
BLD-Foundation | 7/18/2014 | 7/18/2014 | 7/18/2014 | P | PART |
Tony Young
|
|
|
Andy Phone #: ###-####,, pier columns ok
|
BLD-Footing | 7/15/2014 | 7/16/2014 | 7/16/2014 | A | PART |
Tony Young
|
|
|
Andy Phone #: ###-####,, pier and basement ftgs work in progress,, ok
|
BLD-Footing | 7/15/2014 | 7/16/2014 | 7/15/2014 | A | CANC |
Phil Shearer
|
|
|
|
BLD-Footing | 7/9/2014 | 7/10/2014 | 7/10/2014 | A | PART |
Tony Young
|
|
|
Andy Phone #: ###-####,, house ftgs ok
|
PubWorks Subgrade Approval | 7/10/2014 | 7/10/2014 | 7/10/2014 | | DONE |
Jason C. Taylor
|
|
|
**BASEMENT & GARAGE FOOTINGS**A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Foundation | 6/23/2014 | 6/24/2014 | 6/24/2014 | P | PART |
Jim Sly
|
|
|
Andy Phone #: ###-#### Bsmnt walls and footing pads for Pt. loads (Bsmnt slab) .........OK.
|
BLD-Footing | 6/16/2014 | 6/17/2014 | 6/17/2014 | A | PASS |
Tony Young
|
|
|
Andy-soil test is located at mail boxes Phone #: ###-####,, basement ftgs ok
|
BLD-Footing | 6/13/2014 | 6/16/2014 | 6/16/2014 | P | NR |
Tony Young
|
|
|
Andy-soil test is located at mail boxes Phone #: ###-####
|
PubWorks Subgrade Approval | 5/30/2014 | 5/30/2014 | 5/30/2014 | | DONE |
Jason C. Taylor
|
|
|
*BASEMENT ONLY**A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 5/19/2014 | | DONE |
Tisha Gallop
|
|
|
|
OVERRIDE | | | 4/30/2014 | | |
|
|
|
|
Application received | | 4/9/2014 | 4/30/2014 | | DONE |
|
|
|
|
Telephone call | | | 4/30/2014 | | DONE |
Tisha Gallop
|
|
|
called Dylan and left vm permit is ready and fee due.
|
Inspection Record Card- Bld | | | 4/30/2014 | | DONE |
Christina Prado
|
|
|
|
Routing - PLAN CHECK | 4/30/2014 | | 4/30/2014 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/30/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/30/2014 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (CDM) | 4/28/2014 | 4/28/2014 | 4/29/2014 | | PASS |
Carl D Madsen
|
|
|
First review completed
|
Routing PW Grading-Hillside | 4/29/2014 | | 4/29/2014 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Case Summary (BLD) | | | 4/29/2014 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/29/2014 | | DONE |
|
|
|
|
Plan assigned to (JG) | | 4/10/2014 | 4/28/2014 | | DEFR |
Javier Guzman
|
|
|
Due 4/29 T L2 Hillside**
|
Routing - PLAN CHECK | 4/22/2014 | | 4/28/2014 | | FAIL |
Carl D Madsen
|
|
|
EERO openings in the bedrooms do not comply with the 5.7 sq. ft. of clear opening. Spoke with the Architect and they want to change the windows to 3'0 x 5'0 SH. This will require a minimum of redlines on the plans and a letter from the structural engineer stating that the changes in the windows will not affect the engineering. 4-28-14 CDM
|
1st review completed | | | 4/28/2014 | | FAIL |
|
|
|
EERO openings in the bedrooms do not comply with the 5.7 sq. ft. of clear opening. Spoke with the Architect and they want to change the windows to 3'0 x 5'0 SH. This will require a minimum of redlines on the plans and a letter from the structural engineer stating that the changes in the windows will not affect the engineering. 4-28-14 CDM
|
Plan resubmittals received | | | 4/25/2014 | | DONE |
Tisha Gallop
|
|
|
received two copies of addendum to Geotech report, additional structural calcs, and plan sheet S1; taken to Javier
|
Routing - Erosion and Sediment | 4/17/2014 | | 4/22/2014 | | PASS |
Andy J. Long
|
|
|
ESC plan and narrative submitted and approved. Valid PD and RP designated.
|
Routing - MECHANICAL | 4/18/2014 | | 4/18/2014 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 4/10/2014 | 4/13/2014 | 4/17/2014 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - MECHANICAL | | | 4/17/2014 | | FAIL |
Troy James
|
|
|
emailed A1 heating, to verify duct load is correct
|
Routing - PLANNING | 4/15/2014 | | 4/15/2014 | | PASS |
Leon Letson
|
|
|
Plans have been redlined concerning driveway width.
|
Routing - Addressing | 4/10/2014 | | 4/15/2014 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | | | 4/15/2014 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Grading-Hillside | | | 4/15/2014 | | FAIL |
Jason C. Taylor
|
|
|
Need revised Geotechnical report. Jason Taylor ###-####.
|
Routing - FIRE | | 4/10/2014 | 4/14/2014 | | PASS |
Scott Arellano
|
|
|
Fire sprinklers are required. See attached Fire Safety plan.
|
Plans ACCEPTED BY PLAN TECH | | | 4/10/2014 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 4/10/2014 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/10/2014 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 4/9/2014 | | FAIL |
Christina Prado
|
|
|
Needs to call out garage seperation on second door, CO detectors, 2 full ESC plans as well as 3 full size grading plans
|