BLD-Final | 5/27/2014 | 5/27/2014 | 5/27/2014 | P | PASS |
Dave Hannah
|
|
|
Chris Phone #: ###-####
|
DOC - Permit Finaled | 5/27/2014 | 5/27/2014 | 5/27/2014 | P | PASS |
Dave Hannah
|
|
|
|
PubWorks Occupancy Approval | 5/22/2014 | 5/22/2014 | 5/22/2014 | | DONE |
Jason C. Taylor
|
|
|
Wall is built as designed per visual inspection. Frost protection over footing has been placed. JCT
|
BLD-Footing | 4/23/2014 | 4/23/2014 | 4/24/2014 | P | PASS |
Dave Hannah
|
|
|
Pat Phone #: ###-####
|
BLD-Footing | 4/22/2014 | 4/23/2014 | 4/24/2014 | A | PASS |
Dave Hannah
|
|
|
Pat Phone #: ###-####
|
PubWorks Subgrade Approval | 4/23/2014 | 4/23/2014 | 4/23/2014 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the retaining wall footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 4/17/2014 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 4/14/2014 | | |
|
|
|
|
1st review completed | | | 4/14/2014 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/14/2014 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 4/14/2014 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 4/14/2014 | | DONE |
|
|
|
|
Telephone call | | | 4/14/2014 | | DONE |
Christina Prado
|
|
|
Called Chris to advise permit is ready pending RP and gave fees due
|
Permit Ready to Issue | | | 4/14/2014 | | DONE |
Christina Prado
|
|
|
|
Routing PW Grading-Hillside | 4/9/2014 | | 4/11/2014 | | PASS |
Jim Wyllie
|
|
|
Retaining wall construction is subject to the following requirements: The retaining wall footing subgrade must be inspected and approved by the geotechnical engineer.
Approval shall consist of a letter to the Public Works Department approving footing subgrade.
Geotechnical engineer shall confirm that wall excavation limits will not adversly effect foundation for existing house. Documentation shall be sent to Jason Taylor (###-####).
Notes by Jim Wyllie (###-####)
|
Routing Walk-In (Zoning) | 4/9/2014 | 4/9/2014 | 4/9/2014 | P | DONE |
Leon Letson
|
|
|
|
Routing Walk-In (BLD) | 4/9/2014 | 4/9/2014 | 4/9/2014 | P | PASS |
Carl D Madsen
|
|
|
|
Routing - Erosion and Sediment | 4/9/2014 | | 4/9/2014 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver submitted and approved. Contractor needs to provide valid RP on permit or become an Interim RP with agreement to take next class.
|
BLD-Conference | 5/12/2014 | 5/12/2014 | | P | |
Dave Hannah
|
|
|
Chris Phone #: ###-####
|
Application received | | 4/9/2014 | | | |
|
|
|
|