Permit Information
Permit NumberBLD14-00872
StatusFinaled
Name FLYNNER HOMES
Site Address 567 W PASO FINO DR
Project Name 
Customer Number 
ePlanReviewNo
Description
**Plan modification, 6’ retaining wall per attached engineering** WUI Zone A, Class A Roof, Permit for the construction of a new 3301 sq. ft., two story (first story 1404 sq. ft., second story 1897 sq. ft.) single family dwelling with 4 bedrooms, 2.5 bathrooms, approximately 408 sq. ft. of covered patio/porch and a 938 sq. ft. attached garage per the approved plans, plan review report and any notations. R-1A/DA zoning and setbacks per planning. JG A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/18/20156/19/20156/19/2015APASS
DetailsTony Young
Call for code // Scott Phone #: ###-####
DOC - Permit Finaled6/19/20156/19/20156/19/2015PPASS
DetailsTony Young
c of o issued
OVERRIDE  6/18/2015  
PubWorks Occupancy Approval6/18/20156/18/20156/18/2015 DONE
DetailsJason C. Taylor
**Revised calculations and as-built submitted for approval from building department***A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
Plan assigned to (JG)6/15/20156/15/20156/18/2015 PASS
DetailsJavier Guzman
retaining wall plan mod
Routing - PLAN CHECK6/15/2015 6/18/2015 PASS
DetailsJavier Guzman
Routing PW Grading-Hillside6/16/2015 6/18/2015 PASS
DetailsJason C. Taylor
Revised retaining wall calculations and as-built grading approved. jct
PLANS/APPL TAKEN TO FRONT DESK  6/18/2015 DONE
Case Summary (BLD)  6/18/2015 DONE
DetailsJavier Guzman
Permit Ready to Issue  6/18/2015 DONE
PLAN MOD fees due
Telephone call  6/18/2015 DONE
called GC- told him plan mod was ready for pick up and fees due
CHANGE STATUS TO (ISS)  6/18/2015 DONE
Plan Mod
Plan Modification Accepted  6/15/2015 DONE
DetailsChristina Prado
Received two sets of revised retaiing wall calculations as well as three revised Site Grading & Drainage plans; Plans taken to Javier for review
BLD-Final6/11/20156/12/20156/12/2015ANR
DetailsTony Young
Scott Phone #: ###-####,, need hillside 1st
BLD-Conference4/27/20154/28/20154/28/2015APEND
DetailsTony Young
Change time and day per Scott Phone #: ###-####// need hillside,, fire x2,, mec fireplace finals
BLD-Other2/12/20152/12/20152/12/2015PPASS
DetailsTony Young
fire rated vents // Scott Phone #: ###-####,, covering installed vulcan vents with regular style vents
BLD-Other1/30/20151/30/20151/30/2015PPASS
DetailsTony Young
Scott-fire soffit Phone #: ###-####,, soffit base ok,, 1 layer of 5/8"
BLD-Energy code compliance1/23/20151/23/20151/23/2015PPASS
DetailsJim Sly
Scott Phone #: ###-####
BLD-Wall Bracing1/21/20151/21/20151/21/2015PPASS
DetailsTony Young
Scott ###-####,, exterior shear ok
BLD-Framing/Rough-in1/13/20151/14/20151/14/2015PPART
DetailsTony Young
Scott Phone #: ###-####,, ok to insulate,, will make stair winders to code at final (6" min),, strap top plate not lapped 24",, need to verify 24" oc studs ok for shear with staple pattern,, need to nail green sill plate with galv nails
BLD-Foundation11/10/201411/12/201411/12/2014APASS
DetailsTony Young
scott Phone #: ###-####,, retrofitted hold downs
BLD-Foundation10/19/201410/20/201410/20/2014PPART
DetailsTony Young
Phone #: 2086971241 >> Inspection requested via mobile web by Heron,, retaining wall,, work in progress
BLD-Footing10/17/201410/17/201410/17/2014PPASS
DetailsTony Young
Phone #: 2086971241 >> Inspection requested via mobile web by Heron,, retaining wall footing
BLD-Footing10/16/201410/17/201410/17/2014APEND
DetailsTony Young
Phone #: 2086971241 >> Inspection requested via mobile web by Heron,, retaining wall footing
PubWorks Subgrade Approval10/17/201410/17/201410/17/2014 DONE
DetailsJason C. Taylor
*RETAINING WALL FOOTING* A letter from the applicant’s geotechnical engineer indicating that the retaining wall footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
BLD-Footing10/16/201410/16/201410/16/2014PNR
DetailsTony Young
Phone #: 2086971241 >> Inspection requested via mobile web by Heron,, retaining wall footing,, need soils
BLD-Footing10/15/201410/16/201410/16/2014APEND
DetailsTony Young
Phone #: 2086971241 >> Inspection requested via mobile web by Heron,, retaining wall footing,, need soils report
BLD-Foundation10/15/201410/15/201410/15/2014PPART
DetailsTony Young
Phone #: 2086971241 >> Inspection requested via mobile web by Heron,, house wall ok
BLD-Footing10/14/201410/14/201410/14/2014PPART
DetailsTony Young
Phone #: 2086971241 >> Inspection requested via mobile web by Heron,, house part ok
BLD-Foundation10/13/201410/14/201410/14/2014ANR
DetailsTony Young
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
PubWorks Subgrade Approval10/9/201410/9/201410/9/2014 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.

Issue PAID IN FULL permit  9/26/2014 DONE
DetailsChristina Prado
Expiration Notice9/16/201410/7/20149/16/2014 DONE
DetailsChristina Prado
OVERRIDE  8/28/2014  
Plan assigned to (JG)4/11/20144/11/20148/28/2014 PASS
DetailsJavier Guzman
1st review completed, Pending Hillside, Due 4/30 W L2 Hillside**
Application received 4/10/20148/28/2014 DONE
Telephone call  8/28/2014 DONE
DetailsTisha Gallop
called Bill Haas and left vm permit is ready and fee due.
Routing PW Grading-Hillside8/27/2014 8/28/2014 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Routing - PUBLIC WORKS8/28/2014 8/28/2014 PASS
DetailsJennifer Bruner
Case Summary (BLD)  8/28/2014 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  8/28/2014 DONE
Inspection Record Card- Bld  8/28/2014 DONE
DetailsChristina Prado
Permit Ready to Issue  8/28/2014 DONE
DetailsTisha Gallop
Plan resubmittals received  8/27/2014 DONE
DetailsChristina Prado
Received three sets of revised grading sheets marked 1 of 2 and 2 of 2 as well as two sets of manual J; Plans stamped and taken to Javier for review
Routing - PLAN CHECK8/21/2014 8/22/2014 PASS
DetailsJavier Guzman
Routing - PLANNING8/20/2014 8/21/2014 PASS
DetailsLeon Letson
Routing - MECHANICAL8/19/2014 8/21/2014 PASS
DetailsTroy James
Routing PW Grading-Hillside8/19/2014 8/20/2014 FAIL
DetailsJason C. Taylor
Grading plan needs revised to capture/direct stormwater on northern propoerty line. Also, slopes are steeper than 2:1 max as required by hillside manual. Jason Taylor ###-####.
Plan resubmittals received  8/19/2014 DONE
DetailsCandy A. Nichols
home is to be flipped so 2 new sets of plans were submitted-A1.0, sheets 1 of 2, A2.0, A3.0, A4.0, A5.0, A6.0, A7.0, A8.0, A9.0, A10.0, A11.0 and 1 8 1/2 X 10 site plan-took to Javier
Plan resubmittals requested  7/10/2014 DONE
DetailsJavier Guzman
re-emailed applicant 7-10-2014 of requested re-submittals
1st review completed  4/29/2014 FAIL
DetailsJavier Guzman
Routing - PLAN CHECK4/17/2014 4/29/2014 FAIL
DetailsJavier Guzman
emailed applicant review report
Route to Impact Fee Review4/11/20144/14/20144/17/2014 PASS
DetailsCindy M. Gould
Routing - MECHANICAL  4/17/2014 PASS
DetailsTroy James
Routing - Erosion and Sediment4/17/2014 4/17/2014 PASS
DetailsAndy J. Long
ESC plan and narrative submitted and approved. Valid RP and PD designated.
Routing PW Grading-Hillside  4/15/2014 FAIL
DetailsJason C. Taylor
Side yard retaining walls are not engineered. Submit engineering for approval. Jason Taylor ###-####
Routing - PLANNING4/15/2014 4/15/2014 PASS
DetailsLeon Letson
Routing - Addressing4/14/2014 4/15/2014 PASS
DetailsJason C. Taylor
Routing - PUBLIC WORKS  4/15/2014 PASS
DetailsConnie Baumgartner
Routing - FIRE 4/14/20144/14/2014 PASS
DetailsScott Arellano
Fire Sprinkers are required. See attached Fire Safety Plan.
Intake Approval  4/11/2014 PASS
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  4/11/2014 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  4/11/2014 DONE
DetailsTisha Gallop
Intake Approval  4/10/2014 FAIL
DetailsTisha Gallop
engineers stamp on plans, WUI details for eaves and patio covers, 1 extra copy full size grading plan.