BLD-Final | 6/18/2015 | 6/19/2015 | 6/19/2015 | A | PASS |
Tony Young
|
|
|
Call for code // Scott Phone #: ###-####
|
DOC - Permit Finaled | 6/19/2015 | 6/19/2015 | 6/19/2015 | P | PASS |
Tony Young
|
|
|
c of o issued
|
OVERRIDE | | | 6/18/2015 | | |
|
|
|
|
PubWorks Occupancy Approval | 6/18/2015 | 6/18/2015 | 6/18/2015 | | DONE |
Jason C. Taylor
|
|
|
**Revised calculations and as-built submitted for approval from building department***A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
Plan assigned to (JG) | 6/15/2015 | 6/15/2015 | 6/18/2015 | | PASS |
Javier Guzman
|
|
|
retaining wall plan mod
|
Routing - PLAN CHECK | 6/15/2015 | | 6/18/2015 | | PASS |
Javier Guzman
|
|
|
|
Routing PW Grading-Hillside | 6/16/2015 | | 6/18/2015 | | PASS |
Jason C. Taylor
|
|
|
Revised retaining wall calculations and as-built grading approved. jct
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/18/2015 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/18/2015 | | DONE |
Javier Guzman
|
|
|
|
Permit Ready to Issue | | | 6/18/2015 | | DONE |
|
|
|
PLAN MOD fees due
|
Telephone call | | | 6/18/2015 | | DONE |
|
|
|
called GC- told him plan mod was ready for pick up and fees due
|
CHANGE STATUS TO (ISS) | | | 6/18/2015 | | DONE |
|
|
|
Plan Mod
|
Plan Modification Accepted | | | 6/15/2015 | | DONE |
Christina Prado
|
|
|
Received two sets of revised retaiing wall calculations as well as three revised Site Grading & Drainage plans; Plans taken to Javier for review
|
BLD-Final | 6/11/2015 | 6/12/2015 | 6/12/2015 | A | NR |
Tony Young
|
|
|
Scott Phone #: ###-####,, need hillside 1st
|
BLD-Conference | 4/27/2015 | 4/28/2015 | 4/28/2015 | A | PEND |
Tony Young
|
|
|
Change time and day per Scott Phone #: ###-####// need hillside,, fire x2,, mec fireplace finals
|
BLD-Other | 2/12/2015 | 2/12/2015 | 2/12/2015 | P | PASS |
Tony Young
|
|
|
fire rated vents // Scott Phone #: ###-####,, covering installed vulcan vents with regular style vents
|
BLD-Other | 1/30/2015 | 1/30/2015 | 1/30/2015 | P | PASS |
Tony Young
|
|
|
Scott-fire soffit Phone #: ###-####,, soffit base ok,, 1 layer of 5/8"
|
BLD-Energy code compliance | 1/23/2015 | 1/23/2015 | 1/23/2015 | P | PASS |
Jim Sly
|
|
|
Scott Phone #: ###-####
|
BLD-Wall Bracing | 1/21/2015 | 1/21/2015 | 1/21/2015 | P | PASS |
Tony Young
|
|
|
Scott ###-####,, exterior shear ok
|
BLD-Framing/Rough-in | 1/13/2015 | 1/14/2015 | 1/14/2015 | P | PART |
Tony Young
|
|
|
Scott Phone #: ###-####,, ok to insulate,, will make stair winders to code at final (6" min),, strap top plate not lapped 24",, need to verify 24" oc studs ok for shear with staple pattern,, need to nail green sill plate with galv nails
|
BLD-Foundation | 11/10/2014 | 11/12/2014 | 11/12/2014 | A | PASS |
Tony Young
|
|
|
scott Phone #: ###-####,, retrofitted hold downs
|
BLD-Foundation | 10/19/2014 | 10/20/2014 | 10/20/2014 | P | PART |
Tony Young
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron,, retaining wall,, work in progress
|
BLD-Footing | 10/17/2014 | 10/17/2014 | 10/17/2014 | P | PASS |
Tony Young
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron,, retaining wall footing
|
BLD-Footing | 10/16/2014 | 10/17/2014 | 10/17/2014 | A | PEND |
Tony Young
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron,, retaining wall footing
|
PubWorks Subgrade Approval | 10/17/2014 | 10/17/2014 | 10/17/2014 | | DONE |
Jason C. Taylor
|
|
|
*RETAINING WALL FOOTING* A letter from the applicant’s geotechnical engineer indicating that the retaining wall footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 10/16/2014 | 10/16/2014 | 10/16/2014 | P | NR |
Tony Young
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron,, retaining wall footing,, need soils
|
BLD-Footing | 10/15/2014 | 10/16/2014 | 10/16/2014 | A | PEND |
Tony Young
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron,, retaining wall footing,, need soils report
|
BLD-Foundation | 10/15/2014 | 10/15/2014 | 10/15/2014 | P | PART |
Tony Young
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron,, house wall ok
|
BLD-Footing | 10/14/2014 | 10/14/2014 | 10/14/2014 | P | PART |
Tony Young
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron,, house part ok
|
BLD-Foundation | 10/13/2014 | 10/14/2014 | 10/14/2014 | A | NR |
Tony Young
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
PubWorks Subgrade Approval | 10/9/2014 | 10/9/2014 | 10/9/2014 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 9/26/2014 | | DONE |
Christina Prado
|
|
|
|
Expiration Notice | 9/16/2014 | 10/7/2014 | 9/16/2014 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 8/28/2014 | | |
|
|
|
|
Plan assigned to (JG) | 4/11/2014 | 4/11/2014 | 8/28/2014 | | PASS |
Javier Guzman
|
|
|
1st review completed, Pending Hillside, Due 4/30 W L2 Hillside**
|
Application received | | 4/10/2014 | 8/28/2014 | | DONE |
|
|
|
|
Telephone call | | | 8/28/2014 | | DONE |
Tisha Gallop
|
|
|
called Bill Haas and left vm permit is ready and fee due.
|
Routing PW Grading-Hillside | 8/27/2014 | | 8/28/2014 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - PUBLIC WORKS | 8/28/2014 | | 8/28/2014 | | PASS |
Jennifer Bruner
|
|
|
|
Case Summary (BLD) | | | 8/28/2014 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/28/2014 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/28/2014 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 8/28/2014 | | DONE |
Tisha Gallop
|
|
|
|
Plan resubmittals received | | | 8/27/2014 | | DONE |
Christina Prado
|
|
|
Received three sets of revised grading sheets marked 1 of 2 and 2 of 2 as well as two sets of manual J; Plans stamped and taken to Javier for review
|
Routing - PLAN CHECK | 8/21/2014 | | 8/22/2014 | | PASS |
Javier Guzman
|
|
|
|
Routing - PLANNING | 8/20/2014 | | 8/21/2014 | | PASS |
Leon Letson
|
|
|
|
Routing - MECHANICAL | 8/19/2014 | | 8/21/2014 | | PASS |
Troy James
|
|
|
|
Routing PW Grading-Hillside | 8/19/2014 | | 8/20/2014 | | FAIL |
Jason C. Taylor
|
|
|
Grading plan needs revised to capture/direct stormwater on northern propoerty line. Also, slopes are steeper than 2:1 max as required by hillside manual. Jason Taylor ###-####.
|
Plan resubmittals received | | | 8/19/2014 | | DONE |
Candy A. Nichols
|
|
|
home is to be flipped so 2 new sets of plans were submitted-A1.0, sheets 1 of 2, A2.0, A3.0, A4.0, A5.0, A6.0, A7.0, A8.0, A9.0, A10.0, A11.0 and 1 8 1/2 X 10 site plan-took to Javier
|
Plan resubmittals requested | | | 7/10/2014 | | DONE |
Javier Guzman
|
|
|
re-emailed applicant 7-10-2014 of requested re-submittals
|
1st review completed | | | 4/29/2014 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 4/17/2014 | | 4/29/2014 | | FAIL |
Javier Guzman
|
|
|
emailed applicant review report
|
Route to Impact Fee Review | 4/11/2014 | 4/14/2014 | 4/17/2014 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - MECHANICAL | | | 4/17/2014 | | PASS |
Troy James
|
|
|
|
Routing - Erosion and Sediment | 4/17/2014 | | 4/17/2014 | | PASS |
Andy J. Long
|
|
|
ESC plan and narrative submitted and approved. Valid RP and PD designated.
|
Routing PW Grading-Hillside | | | 4/15/2014 | | FAIL |
Jason C. Taylor
|
|
|
Side yard retaining walls are not engineered. Submit engineering for approval. Jason Taylor ###-####
|
Routing - PLANNING | 4/15/2014 | | 4/15/2014 | | PASS |
Leon Letson
|
|
|
|
Routing - Addressing | 4/14/2014 | | 4/15/2014 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | | | 4/15/2014 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - FIRE | | 4/14/2014 | 4/14/2014 | | PASS |
Scott Arellano
|
|
|
Fire Sprinkers are required. See attached Fire Safety Plan.
|
Intake Approval | | | 4/11/2014 | | PASS |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/11/2014 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/11/2014 | | DONE |
Tisha Gallop
|
|
|
|
Intake Approval | | | 4/10/2014 | | FAIL |
Tisha Gallop
|
|
|
engineers stamp on plans, WUI details for eaves and patio covers, 1 extra copy full size grading plan.
|