Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD14-00884
StatusFinaled
Name GUHO CORP
Site Address 421 E PARKCENTER BLVD
Project NameSAGE INTERNATIONAL SCHOOL
Customer Number 
ePlanReviewYes
Description
(SAGE INTERNATIONAL SCHOOL – Phase I) This project is to convert an existing covered mall building (Parkcenter Mall) into a new school. The building is fire sprinklered for area increase. Under Phase I 30,0000 square feet of the Northern part of the building will be built out with classrooms / cafeteria / administration area. Work is to include: [structural upgrades including: new wood sheer walls, new wood hold-downs, new drag sheer blocking and strapping, new wood headers, and concrete repairs], exterior site improvements, [construction of interior non-bearing walls to create 24 classrooms, 3 offices, 2 core restrooms, a staff room, and a cafeteria/commons], installation of new exterior windows, installation of a new roof on the entire structure, installation of accessible doors / hardware, installation of one side of a two-hour wall assembly (second side to be completed in phase II), convert a portion of the site to be a play field (connected on accessible route), and interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Agreement of Future work5/16/20149/1/20168/23/2016 DONE
DetailsTim L. Woodard
Upgrade Agreement attached to case. Due date 9/1/16.

8/23/16 - Phase I and II of Upgrade Agreement complete. Work completed under permits BLD14-00884 and BLD15-03767 along with other associated trade permit cases. Notice of Compliance attached to this case.
Print Statement  8/5/2015 DONE
Second Notice 11/13/201411/24/2014 DONE
This permit finaled on the web by Lisa Owen
First Notice 10/25/201411/3/2014 DONE
BLD-Final10/15/201410/15/201410/15/2014PPASS
DetailsJim Storey
Nate Phone #: ###-#### final ok
Temporary Occupancy10/15/20141/13/201510/15/2014 DONE
DetailsChristina Prado
Permanent Occupancy  10/15/2014 DONE
DetailsChristina Prado
BLD-Final8/11/20148/12/20148/12/2014APART
DetailsJim Storey
nate Phone #: ###-####tco ok pending partitions in resaroom
FIRE-Final Inspection8/8/20148/11/20148/11/2014APASS
DetailsForrest France
C/N items finished. Fire life safety inspection completed satisfactory.
PubWorks Occupancy Approval9/25/20149/25/20148/11/2014 DONE
DetailsLori Flook
Brian Murphy inspected
Zoning Approval8/11/20148/11/20148/11/2014 PASS
DetailsJosh Wilson
Final ok per CUP13-00066 and DRH14-00082
FIRE-Final Inspection8/8/20148/8/20148/8/2014PPART
DetailsForrest France
Fire life safety final pending project related fire alarm permit work, repair of one EM light, post building address numbers, repair one exit sign.
BLD-Other7/30/20147/31/20147/31/2014APASS
DetailsJim Storey
Nate-Drag connection Phone #: ###-#### roof drag ok to cover.
BLD-Ceiling Grid Inspection7/24/20147/24/20147/24/2014PPASS
DetailsJim Storey
Nate Phone #: ###-#### balance of ceillings ok/ drag strut hardware per drawing ok.
BLD-Ceiling Grid Inspection7/8/20147/8/20147/8/2014PPASS
DetailsJim Storey
Nate Phone #: ###-#### ceillings ok allbur center rms ok to cover upon hvac/ele and fire arrpvals.
BLD-Framing/Rough-in6/24/20146/24/20146/24/2014PPASS
DetailsJim Storey
Nate-fire wall Phone #: ###-#### coil strap nailling ok/ fire wall ok remove duct.
BLD-Framing/Rough-in6/12/20146/12/20146/12/2014PPASS
DetailsJim Storey
Nate Phone #: ###-#### sheer ok
BLD-Other6/9/20146/9/20146/9/2014PFAIL
DetailsJim Storey
1st layer sheet rock// Nate Phone #: ###-####
BLD-Framing/Rough-in5/28/20145/28/20145/28/2014PPART
DetailsJim Storey
Nate Phone #: ###-#### need si for hold downs/ ok to one sde south end
OVERRIDE  5/13/2014  
OVERRIDE  5/13/2014  
CHANGE STATUS TO (FEE)  5/13/2014 DONE
DetailsTisha Gallop
permit not RDY, still need ACHD
Permit Ready to Issue  5/13/2014 DONE
DetailsChristina Prado
Issue PAID IN FULL permit  5/13/2014 DONE
DetailsChristina Prado
Print Occupancy Form  5/13/2014 DONE
DetailsChristina Prado
Permit Ready to Issue  5/13/2014 DONE
DetailsBarbara Stitt
Routing - PLAN CHECK5/2/2014 5/12/2014 PASS
DetailsTim L. Woodard
Approved with Upgrade Agreement attached. TLW
Case Summary (BLD)  5/12/2014 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  5/12/2014 DONE
DetailsTim L. Woodard
Plan assigned to (TLW)4/17/2014 5/12/2014 PASS
DetailsTim L. Woodard
GREEN TAG - Level 3 TI - ePlanReview - Sage International School
Plan resubmittals received  5/9/2014 DONE
DetailsChristina Prado
Received one copy of upgrade agreement addressed to Jason Blais;Taken to Jason for review
Routing - FIRE5/2/2014 5/6/2014 PASS
DetailsCraig D. Hanson
See Fire Plan Review Rev 1 05-06-14
Routing - Addressing5/2/2014 5/5/2014 PASS
DetailsEmily Dixon
Plan resubmittals received  5/2/2014 DONE
DetailsTim L. Woodard
Routing PW Drainage4/18/2014 4/30/2014 PASS
DetailsBrian Murphy
1st review completed  4/30/2014 DONE
DetailsTim L. Woodard
Routing - PLAN CHECK4/17/2014 4/29/2014 FAIL
DetailsTim L. Woodard
Refer to change marks on e-plan.TLW
Routing - ELECTRICAL4/17/2014 4/29/2014 PASS
DetailsJavier Guzman
Approved in E-plan review. TLW
Routing PW Solid Waste4/18/2014 4/29/2014 PASS
DetailsPeter J. McCullough
Approved in E-plan review. TLW
Routing - FIRE4/17/20144/17/20144/22/2014 FAIL
DetailsCraig D. Hanson
See Fire Plan Review 04-22-14
Routing PW Sewer Rating4/18/2014 4/22/2014 PASS
DetailsConnie Baumgartner
Routing - Erosion and Sediment4/17/2014 4/22/2014 PASS
DetailsAndy J. Long
Redlines are located on the Site Maps. Site maps shall be updated Prior to the Site Prep Inspection. Also, All BMP's shall be installed Prior to Site Prep Inspection: including Construction Entrance and Perimeter BMP's ALL installed Per Manufacturer Spec. Construction Entrance: Per Idaho DEQ's BMP Manual
Routing - PLUMBING4/17/2014 4/21/2014 PASS
DetailsBill VanDegrift
Per plan and ISPC.
Routing - MECHANICAL4/17/2014 4/21/2014 PASS
DetailsTroy James
Routing - PUBLIC WORKS4/17/2014 4/18/2014 PASS
DetailsBeverly Mountain
Routing - Design Review4/17/2014 4/18/2014 PASS
DetailsJosh Wilson
Josh Wilson - DRH14-00082
Routing - PLANNING4/17/2014 4/17/2014 PASS
DetailsJoshua Johnson
Josh Johnson - CUP13-00066
Routing - Addressing4/17/2014 4/17/2014 FAIL
This needs a new address or new suite number to distinguish it from Smoky Mountain Pizza.
Intake Approval  4/17/2014 PASS
DetailsJason Blais
Prescreen approved by Tim Woodard and plan review fees paid.
Pending Assignment by JCB4/17/2014 4/17/2014 DONE
DetailsJason Blais
Intake Approval  4/14/2014 FAIL
DetailsTim L. Woodard
Adrienne,

Please address the changemarks on the submitted #520 Major TI Checklist. After these are addressed the review cycle will begin.

Best regards,

Tim Woodard
Plans Examiner II
###-####
twoodard@cityofboise.org
Application received  4/11/2014 DONE
Application submitted via PDS Online on Apr 11 2014 4:31PM