Print Statement | | | 12/22/2015 | | DONE |
|
|
|
sent statement with past due stamp
|
Print Statement | | | 12/15/2015 | | DONE |
|
|
|
|
Print Statement | | | 11/9/2015 | | DONE |
|
|
|
sent past due notices
|
Print Statement | | | 9/18/2015 | | DONE |
|
|
|
|
Print Statement | | | 7/29/2015 | | DONE |
|
|
|
|
Third Notice | | 6/14/2015 | 7/13/2015 | | DONE |
|
|
|
sent with letter
|
Third Notice | | 5/9/2015 | 6/9/2015 | | DONE |
|
|
|
|
Third Notice | | 3/8/2015 | 5/4/2015 | | DONE |
|
|
|
|
Second Notice | | 3/13/2015 | 3/3/2015 | | DONE |
Candy A. Nichols
|
|
|
sent in mail today, sent 1 notice because the 2nd didn't print out
|
First Notice | | 1/25/2015 | 3/3/2015 | | DONE |
|
|
|
|
Permanent Occupancy | | | 1/15/2015 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 1/14/2015 | 1/14/2015 | 1/14/2015 | P | PASS |
Mike Jordan
|
|
|
Chris Phone #: ###-####. Ok for perm occ.
|
FIRE-Final Inspection | 1/12/2015 | 1/13/2015 | 1/13/2015 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 1/12/2015 | 1/13/2015 | 1/13/2015 | A | CANC |
Mike Jordan
|
|
|
Chris Phone #: ###-####
|
Print Occupancy Form | | | 1/12/2015 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 7/25/2014 | 7/25/2014 | 7/25/2014 | P | PART |
Mike Jordan
|
|
|
Michael Phone #: ###-####. temp ooc ok. Will be ok for perm occ. once fire/life/safety signs perm.
|
FIRE-Final Inspection | 7/25/2014 | 7/25/2014 | 7/25/2014 | P | PART |
Troy Cobbley
|
|
|
Life safety passed for second floor work only and the exiting to the first floor. Need the project related fire alarm approved.
|
BLD-Final | 7/22/2014 | 7/23/2014 | 7/23/2014 | A | FAIL |
Mike Jordan
|
|
|
Mike Phone #: ###-####. the realted fire alarm permit still needs finaled. Provide smoke and flame spread data for office partitions, extend handrail 12 inches to make code compliant, provide transition from tile to cocnrete floor, this exit area is a required exit and must be fully fuctional prior to final. Also recieved RFI noting accordian door framing ok as is.
|
FIRE-Final Inspection | 7/22/2014 | 7/22/2014 | 7/22/2014 | P | FAIL |
Troy Cobbley
|
|
|
Need the project related fire alarm work completed for the second floor. Need small documents and the exit signs/emergency lights repaired in the existing corridor system.
|
FIRE-Final Inspection | 7/16/2014 | 7/17/2014 | 7/17/2014 | P | FAIL |
Troy Cobbley
|
|
|
I spoke to Michael about gettig the fire alarm inspection and fire sprinkler inspections prior to a fire life safety inspection. We also spoke about the outstanding FIR12-00001 that needs to be addressed. No actual inspection was performed. Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 7/11/2014 | 7/11/2014 | 7/11/2014 | P | PART |
Mike Jordan
|
|
|
Chris Phone #: ###-####. ceiling grid ok. welding on new rtu curb and according door ok per special inspection report. Stiil issue with threaded rod support spacing at end of wall stack.
|
BLD-Conference | 7/9/2014 | 7/10/2014 | 7/10/2014 | A | DONE |
Mike Jordan
|
|
|
Chris-Please call prior to inspection Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 6/24/2014 | 6/25/2014 | 6/25/2014 | P | PART |
Mike Jordan
|
|
|
Mikael Phone #: ###-####. No cover at accordian door at this time. Remainder of 2nd. floor ok, except at windows.
|
BLD-Framing/Rough-in | 6/24/2014 | 6/25/2014 | 6/25/2014 | P | CANC |
Mike Jordan
|
|
|
Michael Phone #: ###-####
|
BLD-Framing/Rough-in | 5/28/2014 | 5/29/2014 | 5/29/2014 | P | PART |
Mike Jordan
|
|
|
chris Phone #: ###-####. Interior steel stud framed walls ok, pending plumbing rough in inspection.
|
Permit Ready to Issue | | | 5/28/2014 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 5/28/2014 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 5/28/2014 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (AJS) | 4/14/2014 | 4/14/2014 | 5/27/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed CWI-CNA Class rooms
|
Routing - Erosion and Sediment | 5/22/2014 | | 5/27/2014 | | PASS |
Evan Jenkins
|
|
|
signed off in e plan under BLD14-00794
|
Routing - PLAN CHECK | 5/22/2014 | | 5/27/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/27/2014 | | DONE |
|
|
|
|
Place hold on job | 5/27/2014 | | 5/27/2014 | | DONE |
Candy A. Nichols
|
|
|
there are 2 other permits # BLD14-00794 & BLD14-00796. All three need paid before we can issue this one.
|
Routing - Erosion and Sediment | 4/14/2014 | | 5/7/2014 | | FAIL |
Andy J. Long
|
|
|
failed in e plan
|
Routing - PLAN CHECK | 4/14/2014 | | 5/7/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
1st review completed | | | 5/7/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - FIRE | | | 4/23/2014 | | PASS |
Scott Arellano
|
|
|
See Fire Plan Review 04-23-14
|
Routing - PLUMBING | 4/14/2014 | | 4/16/2014 | | PASS |
Daryl Spivey
|
|
|
May require additional backflow protection on installed equipment.
|
Routing - Addressing | 4/14/2014 | | 4/16/2014 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 4/14/2014 | | 4/14/2014 | | PASS |
Beverly Mountain
|
|
|
|
Intake Approval | | | 4/14/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing PW Sewer Rating | 4/14/2014 | | 4/14/2014 | | PASS |
Connie Baumgartner
|
|
|
|
Application received | | 4/14/2014 | | | |
|
|
|
|