Print Statement | | | 5/15/2015 | | DONE |
|
|
|
|
Print Statement | | | 5/15/2015 | | DONE |
|
|
|
|
First Notice | | 3/16/2015 | 5/4/2015 | | DONE |
Candy A. Nichols
|
|
|
mailed first notice 5-4-15
|
Permanent Occupancy | | | 3/6/2015 | | DONE |
|
|
|
|
Zoning Approval | 3/5/2015 | 3/5/2015 | 3/5/2015 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Aging Inspection | 3/2/2015 | 3/2/2015 | 3/2/2015 | | DEFR |
Jim Storey
|
|
|
pending p&z sign off
|
Temporary Occupancy | 12/31/2014 | 3/31/2015 | 12/31/2014 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 12/30/2014 | 12/30/2014 | 12/30/2014 | P | PASS |
Jim Storey
|
|
|
Jim Phone #: ###-#### pending p&z sign off
|
Zoning Approval Temp | 12/30/2014 | 12/30/2014 | 12/30/2014 | | DONE |
Andrea Tuning
|
|
|
A bond has been provided for the parking lot striping, landscaping and bike rack. These items must be installed prior to permanent occupancy being issued.
|
FIRE-Final Inspection | 12/22/2014 | 12/22/2014 | 12/22/2014 | P | PASS |
Forrest France
|
|
|
Inspection passed. Fire life safety finaled.
|
FIRE-Final Inspection | 12/19/2014 | 12/19/2014 | 12/19/2014 | P | PART |
Forrest France
|
|
|
Fire life safety inspection completed- Final pending project related fire sprinkler permit C/N items and final.
|
BLD-Final | 12/9/2014 | 12/9/2014 | 12/9/2014 | P | NR |
Jim Storey
|
|
|
sign off card is right inside the building//Jim Phone #: ###-####
|
FIRE-Final Inspection | 11/7/2014 | 11/7/2014 | 11/7/2014 | P | DONE |
Forrest France
|
|
|
On site conference regarding project related fire alarm work, knox box, address numbers, outside WF bell and FDC placements.
|
BLD-Framing/Rough-in | 10/24/2014 | 10/24/2014 | 10/24/2014 | P | PASS |
Jim Storey
|
|
|
Jim Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 10/6/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Routing - PLAN CHECK | 10/1/2014 | | 10/2/2014 | | PASS |
John Menard
|
|
|
|
Routing Off Site - STRUCTURAL | 10/1/2014 | | 10/2/2014 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/2/2014 | | DONE |
John Menard
|
|
|
|
Plan assigned to (JCM) | 9/16/2014 | | 10/2/2014 | | PASS |
John Menard
|
|
|
Plan Modification for main entry. JCM
|
Routing Off Site - STRUCTURAL | 9/25/2014 | | 9/29/2014 | | FAIL |
John Menard
|
|
|
|
Routing - Design Review | 9/16/2014 | | 9/25/2014 | | PASS |
Andrea Tuning
|
|
|
|
Routing - FIRE | 9/16/2014 | | 9/22/2014 | | PASS |
Craig D. Hanson
|
|
|
See Fire Plan Review Rev 3 09-22-14
|
Routing Off Site - STRUCTURAL | 9/16/2014 | | 9/19/2014 | | FAIL |
John Menard
|
|
|
|
Routing - PLAN CHECK | 9/16/2014 | | 9/17/2014 | | PASS |
John Menard
|
|
|
|
BLD-Other | 8/13/2014 | 8/14/2014 | 8/14/2014 | A | PASS |
Jim Storey
|
|
|
rebar .. Jim Phone #: ###-####
|
BLD-Foundation | 7/25/2014 | 7/28/2014 | 7/28/2014 | A | PASS |
Jim Storey
|
|
|
Jim-rebar Phone #: ###-#### wall panel rebar pending si report
|
CHANGE STATUS TO (ISS) | | | 7/17/2014 | | DONE |
Tisha Gallop
|
|
|
plan mod approved and paid
|
BLD-Foundation | 7/15/2014 | 7/15/2014 | 7/15/2014 | P | PASS |
Jim Storey
|
|
|
after 5:00 vapor barrior in place for slab floor ok to place.
|
OVERRIDE | | | 7/9/2014 | | |
|
|
|
|
BLD-Footing | 7/8/2014 | 7/9/2014 | 7/9/2014 | A | PART |
Jim Sly
|
|
|
Jim-###-####-pour time 10:00 90% footing.......Less ramp area and approx 12' section West wall .......OK .Pending MTI special inspection, tests and approvals.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/9/2014 | | DONE |
John Menard
|
|
|
|
Permit Ready to Issue | | | 7/9/2014 | | DONE |
Tisha Gallop
|
|
|
per JCM no hourly fee for plan modification. There is additional fee due to increased value.
|
Plan assigned to (JCM) | 7/7/2014 | | 7/9/2014 | | PASS |
John Menard
|
|
|
|
Routing - PLAN CHECK | 7/7/2014 | | 7/9/2014 | | PASS |
John Menard
|
|
|
|
Routing - Design Review | 7/7/2014 | | 7/7/2014 | | PASS |
Andrea Tuning
|
|
|
|
Plan Modification Accepted | | | 7/7/2014 | | DONE |
|
|
|
started workflow
|
BLD-Conference | 6/24/2014 | 6/25/2014 | 6/25/2014 | A | PASS |
Jim Storey
|
|
|
Jim Phone #: ###-####
|
BLD-Conference | 6/24/2014 | 6/24/2014 | 6/24/2014 | P | DEFR |
Jim Storey
|
|
|
Jim Phone #: ###-####
|
OVERRIDE | | | 6/12/2014 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/12/2014 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 6/12/2014 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 6/12/2014 | | DONE |
Tisha Gallop
|
|
|
|
Routing - FIRE | 6/11/2014 | 6/11/2014 | 6/11/2014 | | PASS |
Craig D. Hanson
|
|
|
See Fire Plan Review Rev 2 06-11-14. Removed Spec warehouse requirement
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/10/2014 | | DONE |
John Menard
|
|
|
|
Routing - PLAN CHECK | 6/4/2014 | | 6/10/2014 | | PASS |
John Menard
|
|
|
|
Routing Off Site - STRUCTURAL | 6/4/2014 | | 6/10/2014 | | PASS |
John Menard
|
|
|
|
Plan assigned to (JCM) | 4/21/2014 | | 6/10/2014 | | PASS |
John Menard
|
|
|
1st Review Complete 5/12/2014
|
Routing - PLANNING Land Div | 6/4/2014 | | 6/4/2014 | | PASS |
Dave Abo
|
|
|
|
Routing Off Site - STRUCTURAL | 5/19/2014 | | 5/27/2014 | | FAIL |
John Menard
|
|
|
|
Routing - PLAN CHECK | 5/19/2014 | | 5/21/2014 | | PASS |
John Menard
|
|
|
|
Routing - FIRE | 5/19/2014 | | 5/21/2014 | | PASS |
Craig D. Hanson
|
|
|
See Fire Plan Review Rev 1 05-21-14
|
Routing - PLANNING Land Div | 5/19/2014 | | 5/19/2014 | | FAIL |
Dave Abo
|
|
|
|
1st review completed | | | 5/12/2014 | | DONE |
John Menard
|
|
|
|
1st review completed | | | 5/12/2014 | | FAIL |
John Menard
|
|
|
|
Routing - PLAN CHECK | 4/21/2014 | | 5/12/2014 | | FAIL |
John Menard
|
|
|
|
Routing PW Drainage | 4/21/2014 | | 5/5/2014 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Solid Waste | 4/21/2014 | | 5/5/2014 | | PASS |
Peter J. McCullough
|
|
|
|
Routing Off Site - STRUCTURAL | 4/21/2014 | | 5/2/2014 | | FAIL |
John Menard
|
|
|
|
Routing PW Street Lights | 4/21/2014 | | 5/1/2014 | | PASS |
Mike D Hedge
|
|
|
No lights required
|
Routing - FIRE | 4/21/2014 | 4/21/2014 | 4/28/2014 | | FAIL |
Craig D. Hanson
|
|
|
See Fire Plan Review 04-28-14
|
Routing PW Sewer Design | 4/21/2014 | | 4/23/2014 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing - Erosion and Sediment | 4/21/2014 | | 4/22/2014 | | PASS |
Evan Jenkins
|
|
|
|
Routing - PLUMBING | 4/21/2014 | | 4/22/2014 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - PLANNING Land Div | 4/21/2014 | | 4/22/2014 | | FAIL |
Todd Tucker
|
|
|
ROS14-00020 must be recorded prior to issuance of the Building Permit.
|
Routing PW Environmental | 4/21/2014 | | 4/22/2014 | | PASS |
Walt Baumgartner
|
|
|
|
Route to Impact Fee Review | 4/21/2014 | 4/24/2014 | 4/21/2014 | | PASS |
Cindy M. Gould
|
|
|
|
Routing PW Sewer Rating | 4/21/2014 | | 4/21/2014 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PUBLIC WORKS | 4/21/2014 | | 4/21/2014 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Design Review | 4/21/2014 | | 4/21/2014 | | PASS |
Andrea Tuning
|
|
|
|
Intake Approval | | | 4/21/2014 | | PASS |
Tim L. Woodard
|
|
|
Approved. Legal Lot form not signed. OK by Todd to take in; however, project cannot be issued until complete. TLW
|
Pending Assignment by JCM | 4/21/2014 | | 4/21/2014 | | DONE |
John Menard
|
|
|
|
Routing - Addressing | 4/21/2014 | | 4/21/2014 | | PASS |
Emily Dixon
|
|
|
|
Application received | | | 4/15/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 15 2014 8:45AM
|