Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD14-00905
StatusFinaled
Name DOUG LASHER CONSTRUCTION
Site Address 2971 E WINDSONG DR
Project Name 
Customer Number 
ePlanReviewNo
Description
***Note: Plan modification of a new hillside/grading and site plan have been submitted to widen asphalt driveway to 20’ and to satisfy the requirements of the Fire plan review approval of no sprinkler requirements*** WUI Zone A, Class A Roof, Permit for the construction of a new 3,279 sq. ft., two story (main level 2,042 sq. ft., finished basement 1,237 sq. ft.) single family dwelling with 4 bedrooms, 2.5 bathrooms, approximately 576 sq. ft. of covered patio/porch and a 821 sq. ft. attached garage per the approved plans, plan review report and any notations. R-1A/DA zoning and setbacks per planning. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/15/20149/16/20149/17/2014PPASS
DetailsPhil Shearer
Bryan Phone #: ###-####
DOC - Permit Finaled9/17/20149/17/20149/17/2014PPASS
DetailsPhil Shearer
PubWorks Occupancy Approval9/17/20149/17/20149/17/2014 DONE
DetailsJason C. Taylor
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
BLD-Energy code compliance7/14/20147/15/20147/15/2014APASS
DetailsDave Hannah
Bryan Phone #: ###-####
BLD-Framing/Rough-in7/10/20147/11/20147/11/2014PPART
DetailsJim Sly
Bryan Phone #: ###-####
C/N posted.
BLD-Wall Bracing7/8/20147/9/20147/9/2014APASS
DetailsDave Hannah
Bryan Phone #: ###-####
CHANGE STATUS TO (ISS)  7/8/2014 DONE
DetailsBarbara Stitt
(F) Reprint permit  7/8/2014 DONE
DetailsBarbara Stitt
OVERRIDE  6/24/2014  
CHANGE STATUS TO (ISS)  6/24/2014 DONE
Permit Ready to Issue  6/24/2014 DONE
OVERRIDE  6/2/2014  
Routing - PLAN CHECK5/29/2014 6/2/2014 PASS
DetailsJavier Guzman
resubmittals of site plan and grading
Case Summary (BLD)  6/2/2014 DONE
DetailsJavier Guzman
Inspection Record Card- Bld  6/2/2014 DONE
PLANS/APPL TAKEN TO FRONT DESK  6/2/2014 DONE
Permit Ready to Issue  6/2/2014 DONE
DetailsTisha Gallop
plan mod
Routing - FIRE5/30/20145/30/20145/30/2014 PASS
DetailsScott Arellano
Approved; per resubmitted plan sheet C1, received May 28th 2014, indicating the installation of a 20 foot wide paved asphalt driveway.
Routing PW Grading-Hillside5/29/2014 5/29/2014 PASS
DetailsJason C. Taylor
Approved widened driveway. JCT
Plan resubmittals received  5/28/2014 DONE
DetailsCandy A. Nichols
received 3 sheets of C-1- took to Jason Taylor
BLD-Foundation5/21/20145/22/20145/22/2014PPASS
DetailsDave Hannah
Eric Phone #: ###-####
Routing - PLANNING5/21/2014 5/21/2014 PASS
DetailsLeon Letson
resubmittals
Routing PW Grading-Hillside5/21/2014 5/21/2014 FAIL
DetailsJason C. Taylor
Need 3 copies of grading plan showing 20' wide driveway submitted to permit counter. JCT
Plan resubmittals received  5/20/2014 DONE
DetailsCandy A. Nichols
resubmittal recieved, 2 sheets of A-101, took to JG
BLD-Footing5/13/20145/15/20145/15/2014PPASS
DetailsJim Storey
Eric Phone #: ###-####
PubWorks Subgrade Approval5/15/20145/15/20145/15/2014 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
OVERRIDE  5/7/2014  
Plan assigned to (JG)4/15/20144/15/20145/7/2014 PASS
DetailsJavier Guzman
1st review completed, Due 5/02 F L2 Hillside**
Routing - PLAN CHECK5/2/2014 5/7/2014 PASS
DetailsJavier Guzman
Issue PAID IN FULL permit  5/7/2014 DONE
DetailsChristina Prado
Inspection Record Card- Bld  5/7/2014 DONE
DetailsChristina Prado
Case Summary (BLD)  5/7/2014 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  5/7/2014 DONE
Permit Ready to Issue  5/7/2014 DONE
DetailsChristina Prado
Plan resubmittals received  5/5/2014 DONE
DetailsChristina Prado
Received two revised plan sets marked A-103, A-104, S-104, S-106, S-107 & S-108;Plans taken to Javier for further review
1st review completed  5/2/2014 FAIL
DetailsJavier Guzman
Routing - PLAN CHECK4/24/2014 5/2/2014 FAIL
DetailsJavier Guzman
emailed review report
Routing - FIRE4/28/20144/28/20144/28/2014 PASS
DetailsScott Arellano
Approved with conditions. This building will be fire sprinklered as an approved IFC code alternative to deficient fire department vehicle access.
Routing - FIRE4/23/2014 4/24/2014 FAIL
DetailsScott Arellano
Emailed and faxed plan review comments to applicant.
Routing - Erosion and Sediment4/23/2014 4/23/2014 PASS
DetailsAndy J. Long
ESC site map and narrative submitted and approved. Valid RP and PD designated for project.
Routing - MECHANICAL  4/21/2014 PASS
DetailsTroy James
Routing - PLANNING4/18/2014 4/18/2014 PASS
DetailsLeon Letson
Routing - PUBLIC WORKS4/16/2014 4/18/2014 PASS
DetailsJennifer Bruner
Route to Impact Fee Review4/16/20144/19/20144/17/2014 PASS
DetailsCindy M. Gould
Routing - Addressing4/16/2014 4/17/2014 PASS
DetailsJason C. Taylor
Routing PW Grading-Hillside4/16/2014 4/17/2014 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Application received 4/15/20144/16/2014 DONE
Plans ACCEPTED BY PLAN TECH  4/15/2014 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  4/15/2014 DONE
DetailsTisha Gallop
Intake Approval  4/15/2014 PASS
DetailsTisha Gallop