BLD-Final | 9/15/2014 | 9/16/2014 | 9/17/2014 | P | PASS |
Phil Shearer
|
|
|
Bryan Phone #: ###-####
|
DOC - Permit Finaled | 9/17/2014 | 9/17/2014 | 9/17/2014 | P | PASS |
Phil Shearer
|
|
|
|
PubWorks Occupancy Approval | 9/17/2014 | 9/17/2014 | 9/17/2014 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Energy code compliance | 7/14/2014 | 7/15/2014 | 7/15/2014 | A | PASS |
Dave Hannah
|
|
|
Bryan Phone #: ###-####
|
BLD-Framing/Rough-in | 7/10/2014 | 7/11/2014 | 7/11/2014 | P | PART |
Jim Sly
|
|
|
Bryan Phone #: ###-#### C/N posted.
|
BLD-Wall Bracing | 7/8/2014 | 7/9/2014 | 7/9/2014 | A | PASS |
Dave Hannah
|
|
|
Bryan Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 7/8/2014 | | DONE |
Barbara Stitt
|
|
|
|
(F) Reprint permit | | | 7/8/2014 | | DONE |
Barbara Stitt
|
|
|
|
OVERRIDE | | | 6/24/2014 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 6/24/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/24/2014 | | DONE |
|
|
|
|
OVERRIDE | | | 6/2/2014 | | |
|
|
|
|
Routing - PLAN CHECK | 5/29/2014 | | 6/2/2014 | | PASS |
Javier Guzman
|
|
|
resubmittals of site plan and grading
|
Case Summary (BLD) | | | 6/2/2014 | | DONE |
Javier Guzman
|
|
|
|
Inspection Record Card- Bld | | | 6/2/2014 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/2/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/2/2014 | | DONE |
Tisha Gallop
|
|
|
plan mod
|
Routing - FIRE | 5/30/2014 | 5/30/2014 | 5/30/2014 | | PASS |
Scott Arellano
|
|
|
Approved; per resubmitted plan sheet C1, received May 28th 2014, indicating the installation of a 20 foot wide paved asphalt driveway.
|
Routing PW Grading-Hillside | 5/29/2014 | | 5/29/2014 | | PASS |
Jason C. Taylor
|
|
|
Approved widened driveway. JCT
|
Plan resubmittals received | | | 5/28/2014 | | DONE |
Candy A. Nichols
|
|
|
received 3 sheets of C-1- took to Jason Taylor
|
BLD-Foundation | 5/21/2014 | 5/22/2014 | 5/22/2014 | P | PASS |
Dave Hannah
|
|
|
Eric Phone #: ###-####
|
Routing - PLANNING | 5/21/2014 | | 5/21/2014 | | PASS |
Leon Letson
|
|
|
resubmittals
|
Routing PW Grading-Hillside | 5/21/2014 | | 5/21/2014 | | FAIL |
Jason C. Taylor
|
|
|
Need 3 copies of grading plan showing 20' wide driveway submitted to permit counter. JCT
|
Plan resubmittals received | | | 5/20/2014 | | DONE |
Candy A. Nichols
|
|
|
resubmittal recieved, 2 sheets of A-101, took to JG
|
BLD-Footing | 5/13/2014 | 5/15/2014 | 5/15/2014 | P | PASS |
Jim Storey
|
|
|
Eric Phone #: ###-####
|
PubWorks Subgrade Approval | 5/15/2014 | 5/15/2014 | 5/15/2014 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
OVERRIDE | | | 5/7/2014 | | |
|
|
|
|
Plan assigned to (JG) | 4/15/2014 | 4/15/2014 | 5/7/2014 | | PASS |
Javier Guzman
|
|
|
1st review completed, Due 5/02 F L2 Hillside**
|
Routing - PLAN CHECK | 5/2/2014 | | 5/7/2014 | | PASS |
Javier Guzman
|
|
|
|
Issue PAID IN FULL permit | | | 5/7/2014 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Bld | | | 5/7/2014 | | DONE |
Christina Prado
|
|
|
|
Case Summary (BLD) | | | 5/7/2014 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/7/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/7/2014 | | DONE |
Christina Prado
|
|
|
|
Plan resubmittals received | | | 5/5/2014 | | DONE |
Christina Prado
|
|
|
Received two revised plan sets marked A-103, A-104, S-104, S-106, S-107 & S-108;Plans taken to Javier for further review
|
1st review completed | | | 5/2/2014 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 4/24/2014 | | 5/2/2014 | | FAIL |
Javier Guzman
|
|
|
emailed review report
|
Routing - FIRE | 4/28/2014 | 4/28/2014 | 4/28/2014 | | PASS |
Scott Arellano
|
|
|
Approved with conditions. This building will be fire sprinklered as an approved IFC code alternative to deficient fire department vehicle access.
|
Routing - FIRE | 4/23/2014 | | 4/24/2014 | | FAIL |
Scott Arellano
|
|
|
Emailed and faxed plan review comments to applicant.
|
Routing - Erosion and Sediment | 4/23/2014 | | 4/23/2014 | | PASS |
Andy J. Long
|
|
|
ESC site map and narrative submitted and approved. Valid RP and PD designated for project.
|
Routing - MECHANICAL | | | 4/21/2014 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 4/18/2014 | | 4/18/2014 | | PASS |
Leon Letson
|
|
|
|
Routing - PUBLIC WORKS | 4/16/2014 | | 4/18/2014 | | PASS |
Jennifer Bruner
|
|
|
|
Route to Impact Fee Review | 4/16/2014 | 4/19/2014 | 4/17/2014 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - Addressing | 4/16/2014 | | 4/17/2014 | | PASS |
Jason C. Taylor
|
|
|
|
Routing PW Grading-Hillside | 4/16/2014 | | 4/17/2014 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Application received | | 4/15/2014 | 4/16/2014 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/15/2014 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/15/2014 | | DONE |
Tisha Gallop
|
|
|
|
Intake Approval | | | 4/15/2014 | | PASS |
Tisha Gallop
|
|
|
|