BLD-Final | 12/17/2014 | 12/18/2014 | 12/18/2014 | A | DONE |
Dave Hannah
|
|
|
Eric Phone #: ###-####
|
BLD-Final | 12/18/2014 | 12/18/2014 | 12/18/2014 | P | PASS |
Dave Hannah
|
|
|
Eric Phone #: ###-####
|
DOC - Permit Finaled | 12/18/2014 | 12/18/2014 | 12/18/2014 | P | PASS |
Dave Hannah
|
|
|
|
PubWorks Occupancy Approval | 12/18/2014 | 12/18/2014 | 12/18/2014 | | DONE |
Jason C. Taylor
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Footing | 9/22/2014 | 9/22/2014 | 9/22/2014 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Sears
|
BLD-Footing | 9/19/2014 | 9/19/2014 | 9/19/2014 | P | CANC |
Phil Shearer
|
|
|
Request inspection between 2 and 3 pm Phone #: ###-#### Inspection requested via web by Ben Sears
|
BLD-Energy code compliance | 9/15/2014 | 9/15/2014 | 9/15/2014 | P | PASS |
Phil Shearer
|
|
|
Eric Phone #: ###-####
|
PubWorks Subgrade Approval | 9/11/2014 | 9/11/2014 | 9/11/2014 | | DONE |
Jason C. Taylor
|
|
|
*RETAINING WALL FOOTINGS ONLY* A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Framing/Rough-in | 9/10/2014 | 9/10/2014 | 9/10/2014 | P | PASS |
Dave Hannah
|
|
|
Eric Phone #: ###-####
|
BLD-Footing | 9/9/2014 | 9/9/2014 | 9/9/2014 | P | NR |
Dave Hannah
|
|
|
Ben Phone #: ###-#### needs geo signoff and install rebar
|
Plan Modification Accepted | | | 8/29/2014 | | DONE |
|
|
|
new manual j
|
Routing - MECHANICAL | 8/29/2014 | | 8/29/2014 | | PASS |
Troy James
|
|
|
resubmitted manual j
|
BLD-Conference | 6/13/2014 | 6/13/2014 | 6/13/2014 | P | PASS |
Dave Hannah
|
|
|
Won''t be ready for inspection till 2:30/3:00. Phone #: ###-#### >> Inspection requested via web by Ben Sears
|
BLD-Footing | 6/12/2014 | 6/12/2014 | 6/12/2014 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### >> Inspection requested via web by Ben Sears
|
BLD-Foundation | 5/29/2014 | 5/29/2014 | 5/30/2014 | P | DONE |
Dave Hannah
|
|
|
Phone #: ###-#### >> Inspection requested via web by Ben Sears
|
BLD-Foundation | 5/30/2014 | 5/30/2014 | 5/30/2014 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### >> Inspection requested via web by Ben Sears
|
BLD-Footing | 5/19/2014 | 5/20/2014 | 5/20/2014 | A | PASS |
Dave Hannah
|
|
|
should be ready around 11:30 for inspection Phone #: ###-#### >> Inspection requested via web by Ben Sears
|
PubWorks Subgrade Approval | 5/12/2014 | 5/12/2014 | 5/12/2014 | | DONE |
Jason C. Taylor
|
|
|
*NOTE _ APPROVAL DOES NOT INCLUDE EXTRIOR COLUMNS) A letter from the applicant’s geotechnical engineer indicating that the footing/ interior column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 5/6/2014 | | DONE |
Tisha Gallop
|
|
|
|
OVERRIDE | | | 5/5/2014 | | |
|
|
|
|
Application received | | 4/15/2014 | 5/5/2014 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/5/2014 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 5/5/2014 | | DONE |
Christina Prado
|
|
|
called Eric to advise permit is ready and gave fees due
|
Permit Ready to Issue | | | 5/5/2014 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (JG) | | 4/15/2014 | 5/2/2014 | | PASS |
Javier Guzman
|
|
|
Due 5/02 F L2 Hillside**
|
Routing - PLAN CHECK | | | 5/2/2014 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 5/2/2014 | | DONE |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 5/2/2014 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/2/2014 | | DONE |
|
|
|
|
Routing - Addressing | 4/15/2014 | | 5/2/2014 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - Erosion and Sediment | 4/22/2014 | | 4/22/2014 | | PASS |
Andy J. Long
|
|
|
ESC site map and narrative approved. Valid RP and PD designated in application.
|
Routing - FIRE | 4/22/2014 | | 4/22/2014 | | PASS |
Scott Arellano
|
|
|
Approved as shown. This property has been evaluated for FD vehicle access.
|
Routing - MECHANICAL | 4/17/2014 | | 4/22/2014 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 4/15/2014 | 4/18/2014 | 4/17/2014 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLANNING | 4/17/2014 | | 4/17/2014 | | PASS |
Susan Riggs
|
|
|
|
Routing PW Grading-Hillside | | | 4/17/2014 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - PUBLIC WORKS | 4/17/2014 | | 4/17/2014 | | PASS |
Jennifer Bruner
|
|
|
|
Route to Impact Fee Review | 4/15/2014 | 4/18/2014 | 4/16/2014 | | PASS |
Cindy M. Gould
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/15/2014 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 4/15/2014 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/15/2014 | | DONE |
Christina Prado
|
|
|
|