BLD-Final | 6/20/2014 | 6/23/2014 | 6/23/2014 | A | PASS |
Mike Jordan
|
|
|
Joe Phone #: ###-####
|
DOC - Permit Finaled | 6/23/2014 | 6/23/2014 | 6/23/2014 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 5/22/2014 | 5/27/2014 | 5/27/2014 | P | PASS |
Jim Sly
|
|
|
Joe Phone #: ###-####
|
BLD-Other | 5/20/2014 | 5/21/2014 | 5/21/2014 | P | PASS |
Tony Young
|
|
|
joe - shear wall inspection Phone #: ###-####
|
BLD-Foundation | 4/30/2014 | 5/1/2014 | 5/1/2014 | P | PASS |
Jim Sly
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 4/29/2014 | 4/30/2014 | 4/30/2014 | A | PART |
Tony Young
|
|
|
Dane Phone #: ###-####,, wip
|
PubWorks Subgrade Approval | 4/28/2014 | 4/28/2014 | 4/28/2014 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Print Occupancy Form | | | 4/17/2014 | | DONE |
|
|
|
|
OVERRIDE | | | 4/16/2014 | | |
|
|
|
|
Routing Walk-In (PW Hillside) | 4/16/2014 | 4/16/2014 | 4/16/2014 | P | CANC |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. The roof storm drainage system must be tied into existing system prior to occupancy. Call Jason Taylor at ###-####
|
Routing Walk-In (Zoning) | 4/16/2014 | 4/16/2014 | 4/16/2014 | P | DONE |
Leon Letson
|
|
|
|
Routing Walk-In (BLD) | 4/16/2014 | 4/16/2014 | 4/16/2014 | P | DONE |
Perry Paine
|
|
|
|
Inspection Record Card- Bld | | | 4/16/2014 | | |
|
|
|
|
1st review completed | | | 4/16/2014 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/16/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/16/2014 | | DONE |
Tisha Gallop
|
|
|
|
Issue PAID IN FULL permit | | | 4/16/2014 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | 4/16/2014 | | | |
|
|
|
|