Permit Information
Permit NumberBLD14-00925
StatusIssued
Name CSDI CONSTRUCTION INC
Site Address 7031 S EISENMAN RD
Project NamePowerbar BDA Room
Customer Number 
ePlanReviewYes
Description
(POWERBAR) MODIFICATION FOR COMPLIANCE OF STAIRS Permit for tenant improvements with work to include the reconfiguation of some existing officspace and the installation of a 380 sq. ft. pre-manufactured mezzanine per the approved plans and the attached engineering. This is a fully sprinklered building; any alteration to the sprinkler system will require a separate permit and shalll comply with NFPA 13 as regulated by the fire department. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Telephone call  12/29/2015 DONE
left a message for Becca about scheduling a final inspection
BLD-Final8/27/20148/28/20148/28/2014APART
DetailsJim Storey
Bob Phone #: ###-#### temp ok pending stair instaltion
FIRE-Final Inspection8/28/20148/28/20148/28/2014PPASS
DetailsTroy Cobbley
Life safety passed
FIRE-Final Inspection8/19/20148/20/20148/20/2014AFAIL
DetailsTroy Cobbley
Life safety will be ok to pass when the existing fire alarm has been extended into the new area.
BLD-Ceiling Grid Inspection8/13/20148/14/20148/14/2014APASS
DetailsJim Storey
Jeffrey Phone #: ###-####
FIRE-Final Inspection8/12/20148/13/20148/13/2014APART
DetailsForrest France
Walkthrough to verify fire sprinkler coverage prior to ceiling cover, discussed project scope, trade permits, and schedule.
BLD-Ceiling Grid Inspection8/12/20148/13/20148/13/2014ANR
DetailsJim Storey
Jeffery Phone #: ###-####
BLD-Ceiling Grid Inspection8/11/20148/12/20148/12/2014PDEFR
DetailsJim Storey
Jeffery Phone #: ###-####out of time
Routing - PLAN CHECK8/4/2014 8/4/2014 PASS
DetailsCarl D Madsen
No review fees fo plan mod. CDM
PLANS/APPL TAKEN TO FRONT DESK  8/4/2014 DONE
CHANGE STATUS TO (ISS)  8/4/2014 DONE
DetailsCandy A. Nichols
BLD-Framing/Rough-in7/28/20147/29/20147/29/2014APART
DetailsJim Storey
Jeffrey Phone #: ###-####framing ok c/n stair access must meet all stair codes due to use of mez changing to occupied.// how will mech ventalition be meet?
Permit Ready to Issue  6/6/2014 DONE
DetailsTisha Gallop
Issue PAID IN FULL permit  6/6/2014  
Inspection Record Card- Bld  6/6/2014  
Plan assigned to (CDM)4/21/20144/21/20145/30/2014 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK5/30/2014 5/30/2014 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  5/30/2014 DONE
1st review completed  4/24/2014 DONE
Routing - PLAN CHECK4/18/2014 4/24/2014 FAIL
DetailsCarl D Madsen
Routing - FIRE4/18/2014 4/22/2014 PASS
DetailsCraig D. Hanson
See Fire Plan Review 04-22-14
Plan assigned to (AJS)4/18/2014 4/21/2014 DEFR
DetailsAdele J Schaffeld-Griffin
Intake Approval  4/18/2014 PASS
DetailsTim L. Woodard
Application received  4/16/2014 DONE
Application submitted via PDS Online on Apr 16 2014 2:17PM