BLD-Final | 7/11/2014 | 7/11/2014 | 7/11/2014 | P | PASS |
Dave Hannah
|
|
|
right side of house thru gate // Dave Phone #: ###-####
|
DOC - Permit Finaled | 7/11/2014 | 7/11/2014 | 7/11/2014 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Footing | 5/21/2014 | 5/22/2014 | 5/22/2014 | A | PASS |
Dave Hannah
|
|
|
evelyn - please call 1/2 hr prior Phone #: ###-####
|
PubWorks Subgrade Approval | 5/21/2014 | 5/21/2014 | 5/21/2014 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
OVERRIDE | | | 4/17/2014 | | |
|
|
|
|
Routing Walk-In (PW Hillside) | 4/17/2014 | 4/17/2014 | 4/17/2014 | A | PASS |
Jason C. Taylor
|
|
|
Subgrade inspection by a geotechnical engineer required prior to scheduling a footing inspection from building department. Please send copy of inspection report to Public Works. Jason Taylor ###-####.
|
Routing Walk-In (Zoning) | 4/17/2014 | 4/17/2014 | 4/17/2014 | A | DONE |
Leon Letson
|
|
|
|
Routing Walk-In (BLD) | 4/17/2014 | 4/17/2014 | 4/17/2014 | A | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 4/17/2014 | 4/17/2014 | 4/17/2014 | | PASS |
Perry Paine
|
|
|
|
Inspection Record Card- Bld | | | 4/17/2014 | | |
|
|
|
|
1st review completed | | | 4/17/2014 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/17/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/17/2014 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 4/17/2014 | | DONE |
Christina Prado
|
|
|
|
Application received | | 4/17/2014 | | | |
|
|
|
|