Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD14-00936
StatusFinaled
Name BUILDING RESOURCES INC
Site Address 1181 S DALE ST Unit: 104
Project NameMorrison Park Apts FitnessRoom
Customer Number 
ePlanReviewYes
Description
(MORRISON PARK APARTMENTS - FITNESS FACILITY - suite 014) This building does not have a fire sprinkler system. To convert a 503 square foot former model dwelling unit/office located on the lowest story of an existing apartment building to an exercise facility. Work is to include interior wall infills and upgrading a remote restroom located within the manager's office to be accessible to the disabled. The existing 1-hr fire-resistance-rated floor-ceiling assembly and the existing 1-hr fire-resistance-rated walls that separate this unit from the rest of the building are required to be maintained. The floor system will be altered to support a 100 pound per square foot live load and a new beam will be installed to replace a bearing wall. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 6/27/20157/9/2015 DONE
Mailed 7-10-15
Permanent Occupancy  6/17/2015 DONE
BLD-Final6/15/20156/16/20156/16/2015APASS
DetailsDave Hannah
PLM permit it with a different address. PLM15-01729 // Cody Phone #: ###-####
BLD-Final6/10/20156/11/20156/11/2015ANR
DetailsJim Sly
Amber Phone #: ###-####// wont be there until 9am
Need Plumbing permit and final plumbing approval.
BLD-Final4/22/20154/24/20154/24/2015AFAIL
DetailsDave Hannah
Call ahead for access - Bobby Phone #: ###-#### sink is in the wrong place ada restroom
FIRE-Final Inspection4/22/20154/23/20154/23/2015APASS
DetailsKatie Marron
Life Safety Pass. Verified new bathroom hardware exceptable.
BLD-Final2/27/20153/2/20153/3/2015PNR
DetailsDave Hannah
Gene Phone #: ###-####
FIRE-Final Inspection2/27/20153/2/20153/2/2015AFAIL
DetailsForrest France
Need to provide approved hardware per approved plans, last inspection activity notes dated 7/29/14 and today's on site discussion with property rep.
FIRE-Final Inspection7/28/20147/29/20147/29/2014AFAIL
DetailsTroy Cobbley
Provide ADA approved hardware, per the approved plans on the Rec Room and the Managers Restroom doors.
BLD-Final7/28/20147/28/20147/29/2014PNR
DetailsDave Hannah
Joel-please call prior to inspection Phone #: ###-#### needs other trades finaled first
BLD-Framing/Rough-in7/15/20147/16/20147/16/2014APASS
DetailsJim Sly
Joel-requests as early as possible Phone #: ###-####
BLD-Framing/Rough-in7/14/20147/14/20147/14/2014PPART
DetailsJim Storey
Joel-Suite 104 please call when you get there Phone #: ###-#### need plm and ele// firestop plm.
BLD-Ceiling Grid Inspection7/3/20147/3/20147/3/2014PNR
DetailsJim Sly
Joel Phone #: ###-####
BLD-Conference6/18/20146/19/20146/19/2014APASS
DetailsJim Storey
Colby Phone #: ###-#### reviewed floor/ceilling protection and fur down.
BLD-Framing/Rough-in6/16/20146/16/20146/16/2014PPART
DetailsJim Storey
call for access code - Colby Phone #: ###-#### post and beam ok
Print Occupancy Form  5/22/2014 DONE
DetailsChristina Prado
Permit Ready to Issue  5/22/2014 DONE
DetailsChristina Prado
Issue PAID IN FULL permit  5/22/2014 DONE
DetailsChristina Prado
Plan assigned to (CJW)4/18/20144/18/20145/16/2014 PASS
DetailsCarl Westfall
MORRISON PARK APARTMENTS - FITNESS FACILITY - Level 3 TI - ePlan Review - (15 days - May 8)
Routing - PLAN CHECK5/14/2014 5/16/2014 PASS
DetailsCarl Westfall
Drawings approved after the resubmittal review.
PLANS/APPL TAKEN TO FRONT DESK  5/16/2014 DONE
Plan resubmittals received  5/14/2014 DONE
1st review completed  4/29/2014 DONE
Failed building
Plan resubmittals requested  4/29/2014 DONE
Routing - PLAN CHECK4/18/2014 4/29/2014 FAIL
DetailsCarl Westfall
Revised drawings required
Routing - FIRE4/18/20144/18/20144/25/2014 PASS
DetailsCraig D. Hanson
See attached report 04-25-14
Routing PW Sewer Rating4/18/2014 4/21/2014 PASS
DetailsConnie Baumgartner
Routing - Addressing4/18/2014 4/21/2014 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS4/18/2014 4/18/2014 PASS
DetailsBeverly Mountain
Intake Approval  4/18/2014 FAIL
Please provide the structural engineers stamp on the structural sheet.
This T.I will be routed as a major tenant improvement.
Intake Approval  4/18/2014 PASS
DetailsJason Blais
Prescreen approved by Carl Madsen. Plan review fees paid.
Pending Assignment by JCB4/18/2014 4/18/2014 DONE
DetailsJason Blais
Application received  4/17/2014 DONE
Application submitted via PDS Online on Apr 17 2014 3:12PM