Second Notice | | 7/19/2015 | 7/21/2015 | | DONE |
Christina Prado
|
|
|
completed7-21
|
Print Statement | | | 7/21/2015 | | DONE |
Christina Prado
|
|
|
|
First Notice | | 6/26/2015 | 7/9/2015 | | DONE |
|
|
|
Mailed 7-10-15
|
Permanent Occupancy | | | 6/16/2015 | | DONE |
|
|
|
|
Telephone call | | | 6/16/2015 | | DONE |
|
|
|
Mike called and asked me to send him the c of o so i emailed it to him
|
Permanent Occupancy | | | 6/16/2015 | | DONE |
|
|
|
|
BLD-Final | 6/10/2015 | 6/11/2015 | 6/11/2015 | P | PASS |
Mike Jordan
|
|
|
Mike Phone #: ###-####. Ok for perm occ.
|
FIRE-Final Inspection | 6/10/2015 | 6/11/2015 | 6/11/2015 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 6/10/2015 | 6/10/2015 | 6/10/2015 | P | PART |
Mike Jordan
|
|
|
MIke Phone #: ###-####. All outstanding building issues have been resolved. Needs fire/life/safety reinspection gor compressor room. Also the outstanding electrical permit should be attached to the BLD for the car wash addition. Contractor to reschedule final when fire/life/safety has finaled and will be ok for perm occ.
|
PubWorks Occupancy Approval | 5/7/2015 | 5/7/2015 | 5/7/2015 | | DONE |
Tiffany Lowery
|
|
|
|
Zoning Approval | 4/29/2015 | 4/29/2015 | 4/29/2015 | | PASS |
Josh Wilson
|
|
|
Landscaping and paving complete. Bond can be released.
|
Temporary Occupancy | 4/24/2015 | 7/23/2015 | 4/24/2015 | | DONE |
Candy A. Nichols
|
|
|
|
Temporary Occupancy | 4/22/2015 | 7/21/2015 | 4/22/2015 | | DONE |
Candy A. Nichols
|
|
|
extension extended 90 days but bond expires on 4-28-15
|
Temporary Occupancy | 4/8/2015 | 7/7/2015 | 4/8/2015 | | DONE |
Candy A. Nichols
|
|
|
|
BLD-Final | 4/1/2015 | 4/1/2015 | 4/1/2015 | P | DONE |
Mike Jordan
|
|
|
Mike Phone #: ###-####. Noted to contractor to send request to building offical for approval.
|
BLD-Final | 1/29/2015 | 1/30/2015 | 1/30/2015 | P | PART |
Mike Jordan
|
|
|
Mike Phone #: ###-####. Ok for temp occ.
|
FIRE-Final Inspection | 1/29/2015 | 1/30/2015 | 1/30/2015 | A | PART |
Troy Cobbley
|
|
|
Phase one life safety is complete (New shop/Office Area). Need parking lot/fire dept access completed (being bonded) and the air compressor room completed
|
Temporary Occupancy | 1/30/2015 | 4/30/2015 | 1/30/2015 | | DONE |
Brittany Hill
|
|
|
|
FIRE-Final Inspection | 1/29/2015 | 1/29/2015 | 1/29/2015 | P | FAIL |
Troy Cobbley
|
|
|
Need all small documents, need the 20' fire dept access clearance around the entire building as per the approved plans, need signage on the electrical room, need the existing "No Parking Fire Lane" signs replaced due to weathering.
|
Zoning Approval Temp | 1/29/2015 | 1/29/2015 | 1/29/2015 | | PASS |
Josh Wilson
|
|
|
Landscape and asphalt bond in place.
|
PubWorks Occupancy Approval | 1/28/2015 | 1/28/2015 | 1/28/2015 | | FAIL |
Jason C. Taylor
|
|
|
Temporary occupancy granted until paving is completed. Jason Taylor ###-####.
|
FIRE-Conference | 1/26/2015 | 1/26/2015 | 1/26/2015 | P | DONE |
Troy Cobbley
|
|
|
Mike and I discussed life safety requirements and phasing of the project.
|
BLD-Ceiling Grid Inspection | 1/16/2015 | 1/20/2015 | 1/20/2015 | A | PASS |
Mike Jordan
|
|
|
Mike Phone #: ###-####
|
BLD-Energy code compliance | 12/23/2014 | 12/26/2014 | 12/26/2014 | A | PASS |
Jim Storey
|
|
|
insulation // Mike Phone #: ###-####
|
BLD-Framing/Rough-in | 12/23/2014 | 12/24/2014 | 12/24/2014 | A | PASS |
Jim Storey
|
|
|
Mike Phone #: ###-#### c/n made ok/ interior and ext. ok
|
BLD-Framing/Rough-in | 12/18/2014 | 12/19/2014 | 12/19/2014 | A | FAIL |
Mike Jordan
|
|
|
Mike Phone #: ###-####. framing for exterior soffit, rigid attachment not per plan. Provide RFI from engineer or construct per approved plans.
|
BLD-Framing/Rough-in | 12/11/2014 | 12/12/2014 | 12/12/2014 | A | PASS |
Mike Jordan
|
|
|
Mike-partial Phone #: ###-####. INterior steel stud framed walls for new restrooms ok.
|
BLD-Other | 12/4/2014 | 12/5/2014 | 12/5/2014 | A | CANC |
Mike Jordan
|
|
|
sewer// mike Phone #: ###-####. Wrong inspection division. Contacted Mike.
|
BLD-Framing/Rough-in | 11/20/2014 | 11/20/2014 | 11/20/2014 | P | PART |
Mike Jordan
|
|
|
Mike-roof decking Phone #: ###-####. work in progress. Needs to complete perimeter puddle welds. Areas completed have had special inspection. aslo reviewed special inspection reports to date.
|
BLD-Footing | 10/14/2014 | 10/14/2014 | 10/14/2014 | P | DEFR |
Mike Jordan
|
|
|
Mike Phone #: ###-####. Column pad footings west of new addition, special inspector on site.
|
BLD-Other | 10/13/2014 | 10/14/2014 | 10/14/2014 | A | CANC |
Mike Jordan
|
|
|
Dennis Phone #: ###-####wrong permit called in.
|
Print Occupancy Form | | | 9/29/2014 | | DONE |
Candy A. Nichols
|
|
|
|
BLD-Other | 9/22/2014 | 9/23/2014 | 9/23/2014 | P | CANC |
Mike Jordan
|
|
|
Mike// seepage bed Phone #: ###-####
|
BLD-Other | 9/16/2014 | 9/17/2014 | 9/17/2014 | A | PEND |
Dave Hannah
|
|
|
Grout pour at 12 - Mike Phone #: ###-#### ok after spec inspection
|
BLD-Footing | 8/19/2014 | 8/19/2014 | 8/19/2014 | P | PASS |
Phil Shearer
|
|
|
Late afternoon pouring at 7am - Mike Phone #: ###-####
|
Issue PAID IN FULL permit | | | 8/12/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Inspection Record Card- Bld | | | 8/12/2014 | | DONE |
Candy A. Nichols
|
|
|
|
OVERRIDE | | | 8/4/2014 | | |
|
|
|
|
Permit Ready to Issue | | | 8/4/2014 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/15/2014 | | 7/23/2014 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/23/2014 | | DONE |
John Menard
|
|
|
|
Plan assigned to (JCM) | 5/9/2014 | | 7/23/2014 | | PASS |
John Menard
|
|
|
1st Review Complete 6/6/2014
|
Routing Off Site - STRUCTURAL | 7/15/2014 | | 7/19/2014 | | PASS |
John Menard
|
|
|
|
Routing - PLAN CHECK | 6/26/2014 | | 7/7/2014 | | PASS |
John Menard
|
|
|
|
Routing Off Site - STRUCTURAL | 6/26/2014 | | 7/7/2014 | | FAIL |
John Menard
|
|
|
|
Routing - PLUMBING | 6/26/2014 | | 7/1/2014 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
1st review completed | | | 6/6/2014 | | FAIL |
John Menard
|
|
|
|
Routing - PLAN CHECK | 5/9/2014 | | 6/6/2014 | | FAIL |
John Menard
|
|
|
|
Routing - Erosion and Sediment | 5/9/2014 | | 5/28/2014 | | PASS |
Evan Jenkins
|
|
|
|
Routing Off Site - STRUCTURAL | 5/9/2014 | | 5/23/2014 | | FAIL |
John Menard
|
|
|
|
Routing PW Drainage | 5/9/2014 | | 5/22/2014 | | PASS |
Brian Murphy
|
|
|
|
Route to Impact Fee Review | 5/9/2014 | 5/14/2014 | 5/15/2014 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - Design Review | 5/9/2014 | | 5/14/2014 | | PASS |
Josh Wilson
|
|
|
Ok per DRH14-00054
|
Routing - FIRE | 5/9/2014 | 5/9/2014 | 5/12/2014 | | PASS |
Craig D. Hanson
|
|
|
See Fire Plan Review 05-12-14
|
Routing PW Sewer Rating | 5/9/2014 | | 5/12/2014 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLUMBING | 5/9/2014 | | 5/12/2014 | | FAIL |
Daryl Spivey
|
|
|
1) use approved flammable liquids interceptor design,
2) vent interceptor chamber independently through roof,
3) trap all floor and trench drains
4) trap all floor and trench draind
5) DCVA required an water service
6) all hose bibs in shop must be protected by a reduced pressure backflow preventer
|
Routing - PLANNING Land Div | 5/9/2014 | | 5/9/2014 | | PASS |
Todd Tucker
|
|
|
|
Routing - PUBLIC WORKS | 5/9/2014 | | 5/9/2014 | | PASS |
Connie Baumgartner
|
|
|
|
Intake Approval | | | 5/9/2014 | | PASS |
John Menard
|
|
|
|
Pending Assignment by JCM | 5/9/2014 | | 5/9/2014 | | DONE |
John Menard
|
|
|
|
Routing PW Environmental | 5/9/2014 | | 5/9/2014 | | PASS |
Walt Baumgartner
|
|
|
new shop has trench drains to new OWS
|
Intake Approval | | | 5/9/2014 | | PASS |
John Menard
|
|
|
|
Plan Reviewer's activity | | | 4/22/2014 | | FAIL |
|
|
|
Please refer to the circled items and provide the requested information. Also, please try to make the "E" sheet files smaller. If they are larger than 1 MB they open slow and are cumbersome to work with. CJW
|
Application received | | | 4/18/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 18 2014 1:28PM
|