Permit Information
Permit NumberBLD14-00948
StatusFinaled
Name STS CONTRACTORS
Site Address 222 S AUTO DR
Project NameBoise Collision Repair Center
Customer Number 
ePlanReviewYes
Description
Larry H. Miller - Body Shop and Office Addition - To demolish and remove an approximate 7,000 sq. ft., two story office area on the northeast corner of the building and construct a 21,035 sq. ft. office and repair garage addition, with a 2,035 sq. ft. storage mezzanine on the north end of an existing auto collision repair building. The existing showroom and repair shop on the south are unchanged and are separated from the north portion of the building by a four-hour fire wall. This permit also includes related site improvements. This building is fully fire sprinklered. The sprinklers are used for area increase. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 7/19/20157/21/2015 DONE
DetailsChristina Prado
completed7-21
Print Statement  7/21/2015 DONE
DetailsChristina Prado
First Notice 6/26/20157/9/2015 DONE
Mailed 7-10-15
Permanent Occupancy  6/16/2015 DONE
Telephone call  6/16/2015 DONE
Mike called and asked me to send him the c of o so i emailed it to him
Permanent Occupancy  6/16/2015 DONE
BLD-Final6/10/20156/11/20156/11/2015PPASS
DetailsMike Jordan
Mike Phone #: ###-####. Ok for perm occ.
FIRE-Final Inspection6/10/20156/11/20156/11/2015APASS
DetailsTroy Cobbley
life safety passed
BLD-Final6/10/20156/10/20156/10/2015PPART
DetailsMike Jordan
MIke Phone #: ###-####. All outstanding building issues have been resolved. Needs fire/life/safety reinspection gor compressor room. Also the outstanding electrical permit should be attached to the BLD for the car wash addition. Contractor to reschedule final when fire/life/safety has finaled and will be ok for perm occ.
PubWorks Occupancy Approval5/7/20155/7/20155/7/2015 DONE
DetailsTiffany Lowery
Zoning Approval4/29/20154/29/20154/29/2015 PASS
DetailsJosh Wilson
Landscaping and paving complete. Bond can be released.
Temporary Occupancy4/24/20157/23/20154/24/2015 DONE
DetailsCandy A. Nichols
Temporary Occupancy4/22/20157/21/20154/22/2015 DONE
DetailsCandy A. Nichols
extension extended 90 days but bond expires on 4-28-15
Temporary Occupancy4/8/20157/7/20154/8/2015 DONE
DetailsCandy A. Nichols
BLD-Final4/1/20154/1/20154/1/2015PDONE
DetailsMike Jordan
Mike Phone #: ###-####. Noted to contractor to send request to building offical for approval.
BLD-Final1/29/20151/30/20151/30/2015PPART
DetailsMike Jordan
Mike Phone #: ###-####. Ok for temp occ.
FIRE-Final Inspection1/29/20151/30/20151/30/2015APART
DetailsTroy Cobbley
Phase one life safety is complete (New shop/Office Area). Need parking lot/fire dept access completed (being bonded) and the air compressor room completed
Temporary Occupancy1/30/20154/30/20151/30/2015 DONE
DetailsBrittany Hill
FIRE-Final Inspection1/29/20151/29/20151/29/2015PFAIL
DetailsTroy Cobbley
Need all small documents, need the 20' fire dept access clearance around the entire building as per the approved plans, need signage on the electrical room, need the existing "No Parking Fire Lane" signs replaced due to weathering.
Zoning Approval Temp1/29/20151/29/20151/29/2015 PASS
DetailsJosh Wilson
Landscape and asphalt bond in place.
PubWorks Occupancy Approval1/28/20151/28/20151/28/2015 FAIL
DetailsJason C. Taylor
Temporary occupancy granted until paving is completed. Jason Taylor ###-####.
FIRE-Conference1/26/20151/26/20151/26/2015PDONE
DetailsTroy Cobbley
Mike and I discussed life safety requirements and phasing of the project.
BLD-Ceiling Grid Inspection1/16/20151/20/20151/20/2015APASS
DetailsMike Jordan
Mike Phone #: ###-####
BLD-Energy code compliance12/23/201412/26/201412/26/2014APASS
DetailsJim Storey
insulation // Mike Phone #: ###-####
BLD-Framing/Rough-in12/23/201412/24/201412/24/2014APASS
DetailsJim Storey
Mike Phone #: ###-#### c/n made ok/ interior and ext. ok
BLD-Framing/Rough-in12/18/201412/19/201412/19/2014AFAIL
DetailsMike Jordan
Mike Phone #: ###-####. framing for exterior soffit, rigid attachment not per plan. Provide RFI from engineer or construct per approved plans.
BLD-Framing/Rough-in12/11/201412/12/201412/12/2014APASS
DetailsMike Jordan
Mike-partial Phone #: ###-####. INterior steel stud framed walls for new restrooms ok.
BLD-Other12/4/201412/5/201412/5/2014ACANC
DetailsMike Jordan
sewer// mike Phone #: ###-####. Wrong inspection division. Contacted Mike.
BLD-Framing/Rough-in11/20/201411/20/201411/20/2014PPART
DetailsMike Jordan
Mike-roof decking Phone #: ###-####. work in progress. Needs to complete perimeter puddle welds. Areas completed have had special inspection. aslo reviewed special inspection reports to date.
BLD-Footing10/14/201410/14/201410/14/2014PDEFR
DetailsMike Jordan
Mike Phone #: ###-####. Column pad footings west of new addition, special inspector on site.
BLD-Other10/13/201410/14/201410/14/2014ACANC
DetailsMike Jordan
Dennis Phone #: ###-####wrong permit called in.
Print Occupancy Form  9/29/2014 DONE
DetailsCandy A. Nichols
BLD-Other9/22/20149/23/20149/23/2014PCANC
DetailsMike Jordan
Mike// seepage bed Phone #: ###-####
BLD-Other9/16/20149/17/20149/17/2014APEND
DetailsDave Hannah
Grout pour at 12 - Mike Phone #: ###-#### ok after spec inspection
BLD-Footing8/19/20148/19/20148/19/2014PPASS
DetailsPhil Shearer
Late afternoon pouring at 7am - Mike Phone #: ###-####
Issue PAID IN FULL permit  8/12/2014 DONE
DetailsCandy A. Nichols
Inspection Record Card- Bld  8/12/2014 DONE
DetailsCandy A. Nichols
OVERRIDE  8/4/2014  
Permit Ready to Issue  8/4/2014 DONE
Routing - PLAN CHECK7/15/2014 7/23/2014 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  7/23/2014 DONE
DetailsJohn Menard
Plan assigned to (JCM)5/9/2014 7/23/2014 PASS
DetailsJohn Menard
1st Review Complete 6/6/2014
Routing Off Site - STRUCTURAL7/15/2014 7/19/2014 PASS
DetailsJohn Menard
Routing - PLAN CHECK6/26/2014 7/7/2014 PASS
DetailsJohn Menard
Routing Off Site - STRUCTURAL6/26/2014 7/7/2014 FAIL
DetailsJohn Menard
Routing - PLUMBING6/26/2014 7/1/2014 PASS
DetailsDaryl Spivey
Per plan and ISPC.
1st review completed  6/6/2014 FAIL
DetailsJohn Menard
Routing - PLAN CHECK5/9/2014 6/6/2014 FAIL
DetailsJohn Menard
Routing - Erosion and Sediment5/9/2014 5/28/2014 PASS
DetailsEvan Jenkins
Routing Off Site - STRUCTURAL5/9/2014 5/23/2014 FAIL
DetailsJohn Menard
Routing PW Drainage5/9/2014 5/22/2014 PASS
DetailsBrian Murphy
Route to Impact Fee Review5/9/20145/14/20145/15/2014 PASS
DetailsCindy M. Gould
Routing - Design Review5/9/2014 5/14/2014 PASS
DetailsJosh Wilson
Ok per DRH14-00054
Routing - FIRE5/9/20145/9/20145/12/2014 PASS
DetailsCraig D. Hanson
See Fire Plan Review 05-12-14
Routing PW Sewer Rating5/9/2014 5/12/2014 PASS
DetailsConnie Baumgartner
Routing - PLUMBING5/9/2014 5/12/2014 FAIL
DetailsDaryl Spivey
1) use approved flammable liquids interceptor design,
2) vent interceptor chamber independently through roof,
3) trap all floor and trench drains
4) trap all floor and trench draind
5) DCVA required an water service
6) all hose bibs in shop must be protected by a reduced pressure backflow preventer
Routing - PLANNING Land Div5/9/2014 5/9/2014 PASS
DetailsTodd Tucker
Routing - PUBLIC WORKS5/9/2014 5/9/2014 PASS
DetailsConnie Baumgartner
Intake Approval  5/9/2014 PASS
DetailsJohn Menard
Pending Assignment by JCM5/9/2014 5/9/2014 DONE
DetailsJohn Menard
Routing PW Environmental5/9/2014 5/9/2014 PASS
DetailsWalt Baumgartner
new shop has trench drains to new OWS
Intake Approval  5/9/2014 PASS
DetailsJohn Menard
Plan Reviewer's activity  4/22/2014 FAIL
Please refer to the circled items and provide the requested information. Also, please try to make the "E" sheet files smaller. If they are larger than 1 MB they open slow and are cumbersome to work with. CJW
Application received  4/18/2014 DONE
Application submitted via PDS Online on Apr 18 2014 1:28PM